• 제목/요약/키워드: a planning phase

검색결과 672건 처리시간 0.031초

삼백 농업·농촌 테마공원 기본계획 (A Study on the Landscape Plan for the Sambaek Agricultural Theme Park)

  • 권진욱;박찬용
    • 농촌계획
    • /
    • 제20권1호
    • /
    • pp.147-159
    • /
    • 2014
  • This study aims to draw up a basic plan to construct an agricultural theme park in a farming city as a way of establishing its regional identity represented by "Three Whites". Sangju, Kyongsangbuk-do which is the subject area of the study has been well-known for "Three Whites (rice, silkworm cocoon and dried persimmon)." The purpose of the study is to take a closer look at the folk life and culture of Sangju and develop tourism resources to promote regional development and competitiveness of the city. This study was conducted in several phases in consideration of the characteristics of plan and design, on the basis of the theoretical review of agricultural tourism. In the first phase, planning conditions were analyzed as per development objectives. In the second phase, strategies and concepts were established for the theme park, based on which development methods were decided by phase and facility. Then, a preliminary review was conducted on functions and facilities to introduce to the theme park. In the third phase, a comprehensive plan was drawn up, which includes basic plans for respective parts. In consideration of the characteristics of the study, construction was not looked at in detail. The total size of land subject to the study is approx. $97,960m^2$, which was divided into four separate zones--Sambaek Cultural Experience Zone, Natural Observation & Experience Zone, Agricultural Life Experience Zone and other facilities zone--in order to connect facilities, functions and experience with the physical characteristics of the city, and separate space planning was conducted for each zone. The outcome of the study carries significance as an example of alternative tourism which considers regional characteristics, develops local resources and makes use of obsolete rural facilities, in what is called the eco-friendly development where nature and eco-system, landscape and culture, and recreation and leisure come together as one.

ERP시스템 도입 단계별 핵심성공요인에 관한 연구 (A Study on the Critical Success Factors for Each Phase of the Introduction of ERP Systems)

  • 유춘번;양효석
    • 산업경영시스템학회지
    • /
    • 제25권3호
    • /
    • pp.64-77
    • /
    • 2002
  • In every sectors of industry, the Business Process Reengineering(BPR) has been applied for taking competitive advantage under rapidly changing environment. A company adopting the BPR has begun to consider the introduction of Enterprise Resource Planning ERP systems. ERP systems can integrates many core activities of business, such as manufacturing management, human resource management, financial management, supply chain management by applying the best practices to facilitate a rapid decision-making, cost reductions, and organizational control. Unfortunately, however, many tentative risk factors are existed through each phase of the introduction of ERP systems. As a result, it can bring an enormous benefits to a company or it can be a disastrous for organization. Therefore, two critical questions regarding the introduction of ERP systems should be analyzed before actual introduction has happened. They are "how can ERP systems be introduced successfully\ulcorner" and "what are the critical success factors for each phase of introduction of ERP systems\ulcorner". Through this research, We studied and analyzed the characteristics of critical success factors requiring at each phase of the introduction of ERP systems by applying the questionnaire survey method. Finally, we suggest the list of barriers and critical success factors for each phase of introduction of ERP systems.tion of ERP systems.

자동 부품 정렬기 응용계획과 전용 DB 설계 (Planning of Part Feeder and Design of a Data Base for Part Feeder Planning System)

  • 국금환;박용택
    • 한국정밀공학회지
    • /
    • 제19권7호
    • /
    • pp.116-124
    • /
    • 2002
  • The planning of part feeder and other manufacturing automation equipments is almost always underestimated. Planning ahead for those crucial pitfalls can permit steps to take to minimize heir impacts, especially if the problems can be discovered in the planning phase, not on the shop floor. Planning process is an engineering process, namely a series of trade-offs. The effective trade-offs in the shortest amount of time can be possible with the help of a computer-aided ngineering (CAE) technique. The main parts of CAE fur part feeder are database system of fabricated workpiece parts, part feeders, part feeder components. In this study, a planning process of part feeder is presented. Especially, a systematic analysis of workpiece parts and part feeders is performed for the design of databases of CAE system.

한국형 고속전철 시스템의 추정/투입비용 분석 (Prediction/Investment Cost Analysis for korea High-Speed Railway System)

  • 이태형;박춘수
    • 시스템엔지니어링워크숍
    • /
    • 통권1호
    • /
    • pp.60-64
    • /
    • 2003
  • In this study, we have analyzed the cost of korea high-speed railway system. The predicted cost in planning phase and adjustment data to 5th year are collected. Then, predicted cost is compared with adjustment in year/item/system base. We make a project history table for criteria to review project history and research & development activity. We have developed CBS(cost breakdown structure) and allocated adjustment data to them. It is shown that cost prediction related to research & development activity in planning phase is relatively correct.

  • PDF

한국형 고속전철 시스템의 비용분석 (Life Cycle Cost Analysis for Korea High-Speed Rail Project)

  • 이태형;목진용;박춘수
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2002년도 추계학술대회 논문집(I)
    • /
    • pp.376-381
    • /
    • 2002
  • In this study, we have analyzed the cost of korea high-speed rail project. The predicted cost in planning phase and adjustment data to 5th year are collected. Then, predicted cost is compared with adjustment in year/item/system base. We make a project history table for criteria to review project history and research & development activity. We have developed CBS(cost breakdown structure) and allocated adjustment data to them. It is shown that cost prediction related to research St development activity in planning phase is relatively correct.

  • PDF

녹색건축물인증(LEED) 사례연구를 통한 커미셔닝 관리 프레임워크 도출 (Building Commissioning Management Framework from the Case Study of Green Building)

  • 정진학;박소연;송동훈;안용한
    • 대한건축학회논문집:계획계
    • /
    • 제34권8호
    • /
    • pp.23-30
    • /
    • 2018
  • A necessity of increasing the energy efficiency of the buildings is rising due to global warming and high energy demands prices. Commissioning is an effective way to increase the energy efficiency of the building and reduce maintenance costs. In this study, a case study was conducted to derive the commissioning process of green building and propose management factors that can be used in domestic commissioning projects. The case was a university renovation project that received a LEED Glod certification and conducted the enhanced commissioning. The commissioning is divided into planning, design, construction, and post-construction phases. In the planning stage, commissioning company selection, commissioning goal setting, tasks and responsibilities for each subject are set. In the design phase, preparations are made for inspection and construction steps to prevent design errors. In the construction phase, problems are solved through periodic on-site inspections. In the post-construction phase, a final report with all the details of the commissioning will be created and future maintenance strategies will be proposed. Based on the findings of this study, it will be a basis for the management factors that can be used in the implementation of domestic commissioning projects.

A comprehensive approach for managing feasible solutions in production planning by an interacting network of Zero-Suppressed Binary Decision Diagrams

  • Takahashi, Keita;Onosato, Masahiko;Tanaka, Fumiki
    • Journal of Computational Design and Engineering
    • /
    • 제2권2호
    • /
    • pp.105-112
    • /
    • 2015
  • Product Lifecycle Management (PLM) ranges from design concepts of products to disposal. In this paper, we focus on the production planning phase in PLM, which is related to process planning and production scheduling and so on. In this study, key decisions for the creation of production plans are defined as production-planning attributes. Production-planning attributes correlate complexly in production-planning problems. Traditionally, the production-planning problem splits sub-problems based on experiences, because of the complexity. In addition, the orders in which to solve each sub-problem are determined by priorities between sub-problems. However, such approaches make solution space over-restricted and make it difficult to find a better solution. We have proposed a representation of combinations of alternatives in production-planning attributes by using Zero-Suppressed Binary Decision Diagrams. The ZDD represents only feasible combinations of alternatives that satisfy constraints in the production planning. Moreover, we have developed a solution search method that solves production-planning problems with ZDDs. In this paper, we propose an approach for managing solution candidates by ZDDs' network for addressing larger production-planning problems. The network can be created by linkages of ZDDs that express constraints in individual sub-problems and between sub-problems. The benefit of this approach is that it represents solution space, satisfying whole constraints in the production planning. This case study shows that the validity of the proposed approach.

주택재개발사업 기획단계에서 이용 가능한 수익성 예측 모델 (A Profitability Forecasting Model available in Planning Stage of Housing Redevelopment Project)

  • 안경환;박종순;이종식;권대중;전재열
    • 한국건설관리학회논문집
    • /
    • 제14권1호
    • /
    • pp.63-70
    • /
    • 2013
  • 주택재개발사업에서 수익성 예측은 성공적인 사업의 수행을 위한 중요한 요소이기 때문에 수익성 예측을 소홀히 할 경우 많은 그에 따른 리스크가 커지게 된다. 그러나 현행 주택재개발사업은 사업이 많이 진행된 시점에서 수익성을 분석하기 때문에, 수익성이 없는 것으로 판단될 경우 그에 따른 큰 손실을 감수해야 한다. 이로 인해 현재 사업이 중단되거나 지연됨에 따라 경제적인 손실을 보는 사업장이 늘어나고 있으며, 그에 따른 이해관계자간 갈등이 심화되고 있다. 주택재개발사업 시 이러한 사회적 갈등과 경제적 손실을 줄이기 위해서는 사업추진여부를 결정하기 위한 적절한 수익성 예측 방법의 개발이 필요하며, 더불어 적절한 시기에 적용할 수 있는 프로세스의 제시가 요구된다. 본 연구는 사업 초기단계인 기획단계에서 수익성을 예측할 수 있는 방법을 제시하여, 합리적이고 타당한 의사결정의 지원을 위한 것으로 본 연구모델의 적용 시 사업 초기단계에 사업 수행 여부의 결정이 가능하도록 하여, 부적절한 사업의 무리한 진행으로 인한 경제적인 손실과 그에 따른 이해관계자간의 갈등을 줄일 수 있을 것으로 판단된다.

A method of minimum-time trajectory planning ensuring collision-free motion for two robot arms

  • Lee, Jihong;Bien, Zeungnam
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 1990년도 한국자동제어학술회의논문집(국제학술편); KOEX, Seoul; 26-27 Oct. 1990
    • /
    • pp.990-995
    • /
    • 1990
  • A minimum-time trajectory planning for two robot arms with designated paths and coordination is proposed. The problem considered in this paper is a subproblem of hierarchically decomposed trajectory planning approach for multiple robots : i) path planning, ii) coordination planning, iii) velocity planning. In coordination planning stage, coordination space, a specific form of configuration space, is constructed to determine collision region and collision-free region, and a collision-free coordination curve (CFCC) passing collision-free region is selected. In velocity planning stage, normal dynamic equations of the robots, described by joint angles, velocities and accelerations, are converted into simpler forms which are described by traveling distance along collision-free coordination curve. By utilizing maximum allowable torques and joint velocity limits, admissible range of velocity and acceleration along CFCC is derived, and a minimum-time velocity planning is calculated in phase plane. Also the planning algorithm itself is converted to simple numerical iterative calculation form based on the concept of neural optimization network, which gives a feasible approximate solution to this planning problem. To show the usefulness of proposed method, an example of trajectory planning for 2 SCARA type robots in common workspace is illustrated.

  • PDF

IPO 관점에서의 정보기술 아웃소싱 위험요인에 관한 탐색적 연구 (An Exploratory Study on the Information Technology Outsourcing Risk Factors: An IPO Perspective)

  • 양경식;김현수
    • Journal of Information Technology Applications and Management
    • /
    • 제11권3호
    • /
    • pp.35-62
    • /
    • 2004
  • Recently, IT outsouricng has been one of the major concerns of many companies. This paper explores the relationship between information technology outsourcing risk factors and outsourcing performance. It is based upon a three-phase process utilizing IPO (Input-Process-Output) system. The first phase means the outsourcing planning risks t~at arise from overall environment of outsourcing, organizational refuse, and wrong contracts. The second phase implies outsourcing operational risks, which are occurred while out-sourcing perform and consist of organizational acceptances of outsourcing, partnership and hidden costs. The last phase is outsourcing performance based on four perspective of BSC(Blanced Scored Card). The survey was performed on the IT/IS firms, and the data was collected from 53 service receivers. The result of the analysis are as follows. First, Outsourcing planning risks positively affects the operational risks. Second, Outsourcing operational risks negatively affects the Outsourcing Performance.

  • PDF