Alteration in the flow regime of rivers are caused by natural climate change and the changes in anthropogenic hydrological environment due to dam construction. These changes in flow regime cause serious changes not only in the fresh water ecosystems of the rivers but also in the physical structures and fish habitats of the streams. In this study, the alteration in the hydrological characteristics of the Gam river basin due to Buhang dam construction and the changes in ecological health condition, water quality, and river cross-section were analyzed. As a result of analysis by indicators of hydrologic alteration (IHA) to quantitatively change the flow regime of Gam river, HA (Hydrologic Alteration) is more than ±1 and various changes have occurred in the river ecosystem after Buhang dam construction. In addition, ecological health condition and water quality showed different response for each element, and in the case of riverbeds and channel cross-sections, the degradation of channel bed was obviously monitored after dam construction. The results of this study are expected to be used as an efficient method for evaluating changes in stream ecosystems caused by stream regime changes.
Multi-purpose dams are regarded to contribute to the Korean society not only positive affects but also negative ones. Especially, negative considerations are usually prevailed around multi-purpose dam sites and their vicinities even though the Government adopted "act on dam construction and assistance, etc. to neighborhood area" in 1989 and has supported many various projects since 1990. Nevertheless, many arguments and controversies about effects of multi-purpose dams and support projects to vicinities" have happened so frequently and sometimes brought a suit against government. These situations imply that support projects are not so sufficient to fulfil peoples' expectations. Therefore, this research figured out the key factors that affected residents' satisfaction about multi-purpose dams and support projects. The results of the research are as follows: 1) 'social necessity of dams', 'rationality of the process in supporting project' and 'appropriateness of supporting project', were statistically significant to 'customer satisfaction'; 2) among these factors, 'rationality of the process in supporting project' was the most related to 'customer satisfaction': 3) 'appropriateness of supporting project', 'social necessity of dams' were also revealed as second third factors that relate to the satisfaction.
Woo, So Young;Kim, Seong Joon;Hwang, Sun Jin;Jung, Chung Gil
Journal of Korea Water Resources Association
/
v.52
no.spc2
/
pp.777-789
/
2019
The purpose of this study is to evaluate changes in water quality and aquatic ecosystem health by additional dam release of stream maintenance flow from multipurpose dams in Han river basin ($34,148km^2$) using SWAT (Soil and Water Assessment Tool). The period of additional release was spring (April to June) and autumn (August to October) to evaluate the changes with the data of aquatic ecosystem health survey. The amount of additional release was set proportional to the present dam release, and the maximum release amount was controlled not to exceed the officially notified stream maintenance flow from dam. The 10 percent to 50 percent additional releases showed that the stream water quality (T-N, $NH_4$, T-P, and $PO_4-P$) concentrations except $NO_3-N$ decreased in spring while increased in autumn period. Using the stream water quality results and applying with Random Forest algorithm, the grade of aquatic ecosystem health index (FAI, TDI, and BMI) was improved for both periods especially in the downstream of basin. This study showed that the additional release of stream maintenance flow was more effective in spring than autumn period for the improvement of water quality and aquatic ecosystem.
Journal of the Korean Professional Engineers Association
/
v.19
no.1
/
pp.25-32
/
1986
The number of visiters to Bukhan Mt. national park, generation quantity of solid waste and collection system were researched to consider a counterplan for the pollution control of the national park and study for developing the effective treatment of solid waste was tried through the proximate analysis of each component containing. Results obtained in this study were summerized as follows; The great part of visitors go on an excursion to the Bukhan Mt. national park during July and August and also, the solid waste was generated nearly a half of the total amount at the same period. The major collection facilities in the national park were waste basket and incineration box. But the incineration box was too large in volume and very far in distance, and its collection period was irregular, so it was cause to the congestion of solid waste and bad smell and dirty. Therefore, to complete collection of solid waste, we must set up the waste basket which able to find within 40~50m from the origination place of solid waste and induce the visitors to throw the solid waste. It was obtained as moisture content: 48.5 wt%, volatile solid: 28.4wt%, fixed solid: 23.1 wt%, lower heating value: 1,320kca1/kg from experimental analysis of solid waste. According to this analysis, the incineration operation is possible, but the generation quantity of solid waste was too small to construct incineration plant for heat recovery. It was found that it is suitable for the aerobic composting by mixing with the night soil which generate in the national park after the recovery of resources such as metals, glasses and plastics.
According to the report of hydrologic modeling study, from a quantitative point of view, a lumped model is more efficient than a distributed model. A distributed model has to simplify geospatial characteristics for the shake of restricted application on computer calculation and field observation. In this reason, a distributed model can not help having some errors of water quantity modelling. However, considering a distribution of rainfall-runoff reflected spatial characteristics, a distributed model is more efficient to simulate a flow of surface water, The purpose of this study is modeling of spatial rainfall-runoff of surface water using grid based distributed model, which is consisted of storage function model and essential basin-channel parameters( slope, flow direction & accumulation), and that procedure is able to be executed at a personal computer. The prototype of this model is developed in Heongseong Multipunose Dam basin and adapted in Hapchon Multipurpose Dam basin, which is larger than the former about five times. The efficiency coefficients in result of two dam basin simulations are more than about 0.9, but ones at the upstream water level gauge station meet with bad result owing to overestimated rating curves in high water level. As a result of this study, it is easily implemented that spatially distributed rainfall-runoff model using GIS, and geophysical characteristics of the catchment, hereafter it is anticipated that this model is easily able to apply rainfall data by real time.
Kim Min-Je;No Ui-Su;Heo Eun-Jeong;Choi Gyeong-Hyeon
Proceedings of the Korean Operations and Management Science Society Conference
/
2006.05a
/
pp.1170-1177
/
2006
We apply VRP(Vehicle Routing Problem) to sludge collection system in this study. Sewage stores of villages are located in each village around a multipurpose dam. Sludge which is produced in sewage store of village is transported from the sewage store of village to the sewage treatment plants by the special purpose vehicle such as the tank lorry. In this paper, we propose sludge collection strategies which allocate each sewage store of village to sewage treatment plants and decide the schedule of sludge collection in order to collect sludge efficiently. The strategies aim to decrease transportation cost with deciding proposed vehicle routing and scheduling the sludge collection. When we decide route of vehicles, we consider the collection time in sewage store of village, distance between sewage store of villages and vehicle information as average velocity of vehicle, operation time of vehicle driver. We also develop the SCMS(Sludge Collection Management System) based on windows system with real data which is used in certain circumstance. And we experiment to figure out vehicle route and transportation cost throughout changing input data.
To evaluate the applicability of inflow runoff model to reservoir operation in Korea, DAWAST model and TPHM model which are conceptual lumped daily runoff model and were developed in Korea, were selected and applied to simulate inflows to Daecheong multipurpose dam with watershed area of 4,134 $km^2$, and water storages in Geryong reservoir with watershed area of 15.1 $km^2$ and total water storage of 3.4 M $m^3$. Evaluating inflows on an yearly, monthly, ten-day, and daily basis, inflows by DAWAST model showed balanced scatters around equal value line. But inflow by TPHM model showed high in high flows. Annual mean water balance by DAWAST model was rainfall of 1,159.9 mm, evapotranspiration of 622.1 mm, and inflow of 644.6 mm, from which rainfall was 104.8 mm less than sum of evapotranspiration and inflow, and showed unbalanced result. Water balance by TPHM model showed satisfactory result. Reservoir water storages were shown to simulate on a considerable level from applying DAWAST and TPHM models to simulate inflows to Geryong reservoir. But it was concluded to be needed to improve DAWAST and TPHM model together from imbalance of water balance and low estimation in high flow.
KSCE Journal of Civil and Environmental Engineering Research
/
v.36
no.4
/
pp.637-644
/
2016
This study sought to reevaluate the water supply capacities of the Nakdong river dams, and identify measures to remedy any shortages using weirs, focusing on 5 multipurpose dams and 8 weirs. The reevaluation of the dams was performed by the HEC-5 program using the original design criteria and inflow data recorded for each dam. The results show that the capacities of the 3 dams has decreased to 73~87%. Three simulations were performed to determine the effect of coordinating the dams and weirs. The first simulation was based on individual operation of the dams; the second on coordinated operation of the dams; and the third on coordinated operation of the dams and weirs. To obtain a water supply reliability of 95%, the annual water shortage was calculated for a 20-year period (1992~2011). In addition, long-term runoff simulation data used in the national river basin investigation by the Ministry of Land, Infrastructure and Transportation were used with the dam discharge data, because long-term inflow data for the weirs were not available. The simulations were performed by the HEC-ResSim program, with the reservoir network divided into 2 groups based on the Waegwan water station. The results show that water supply capacity for the 3 simulations to be $2424Mm^3/yr$, $2612Mm^3/yr$ and $2734Mm^3/yr$, respectively. This indicates that coordinated operation of the dams and weirs could provide an additional water supply of $122Mm^3/yr$.
Kim, Hye-Jin;Ahn, Jae-Hwang;Choi, Chang-Won;Yi, Jae-Eung
Journal of the Korean Society of Hazard Mitigation
/
v.11
no.2
/
pp.147-156
/
2011
The purpose of multipurpose reservoir operation in flood season is to reduce the peak flood at a control point by utilizing flood control storage or to minimize flood damage by controlling release and release time. Therefore, the most important thing in reservoir operation for flood season is to determine the optimal release and release time. In this study, goal programming is used for the optimal reservoir operation in flood season. The goal programming minimizes a sum of deviation from the target value using linear programming or nonlinear programming to obtain the optimal alternative for the problem with more than two objectives. To analyze the applicability of goal programming, the historical storm data are utilized. The goal programming is applied to the reservoir system operation as well as single reservoir operation. Chungju reservoir is selected for single reservoir operation and Andong and Imha reservoirs are selected for reservoir system operation. The result of goal programming is compared with that of HEC-5. As a result, it was found that goal programming could maintain the reservoir level within flood control level at the end of a flood season and also maintain flood discharge within a design flood at a control point for each time step. The goal programming operation is different from the real operation in the sense that all inflows are assumed to be given in advance. However, flood at a control point can be reduced by calculating the optimal release and optimal release time using suitable constraints and flood forecasting system.
Journal of the Korean Institute of Landscape Architecture
/
v.39
no.2
/
pp.103-112
/
2011
The purpose of this study is to specify the prior eco-preserve zone by establishing the eco-landscape unit on the stream corridor and evaluating the stream ecosystem in the dam basin. The fundamental ecological data was surveyed and collected through "the ecosystem project on Yongdam multipurpose dam watershed" from 2008 to 2009. The Yongdam Dam Watershed has several streams, Jujacheon, Jeongjacheon and Guryangcheon, of which the area is $930km^2$, stretching to Jinangun, Jangsugun and Mujugun Jellabukdo. In spite of being used for drinking purpose, the dam water quality and ecosystem is threatened by in-watershed pollution produced by development, golf course grounds and sports complex, etc. The landscape unit of stream corridor was zoned across by 250m, 500m, and 750m from the vicinity line of stream, which was decided to the accuracy of mapping and surveying. Types of evaluation are the Stream Corridor Evaluation(SCE) and the Vegetated Area Evaluation(VAE). In the process of SCE, several indices were analysed, fish species diversity, species peculiarity, and stream naturality. Indices for VAE were forest stand map, vegetation protection grade, species diversity and peculiarity for wild bird and mammal life. The importance of the ecological items is categorized into three levels and overlapped for specifying the prior preserve zone. The area at which legally protecting species appeared is categorized as absolute preserve area. This study might be meaningful for proposing the evaluation process of a stream corridor ecosystem, which can synthesize a lot of individual ecological surveys. We hope further research will be actively performed about the ecotope mapping which is based on a individual wildlife territory and habitats and also their relationships.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.