• Title/Summary/Keyword: a Guide-Line for Assessment Items

Search Result 3, Processing Time 0.015 seconds

A Study on a Guide-Line for Assessment Items Development in Middle and High School Mathematics (중.고등학교 수학 내신 평가문항 개발 가이드라인 연구)

  • Lee, Hwan Chul;Kim, Dong-Won;Hwang, Hye Jeang;Kim, Bu mi;Kim, Sun Hee;Lee, Hyung Joo
    • Journal of the Korean School Mathematics Society
    • /
    • v.16 no.4
    • /
    • pp.637-654
    • /
    • 2013
  • This study aims to suggest a Guide-Line for Assessment Items Development in Middle and High School Mathematics that was included in the plan for advancement of mathematics education(2012). Consequently, we categorized a Guide-Line for Assessment Items Development as three process: 'Lesson content analysis process', 'Assessment items making process', 'Assessment items completed process'. This study will contribute to improve teacher's assessment professionalism and can be used as self-diagnosis tools.

  • PDF

Critical Pathway Development for the Hysterectomy Patients and its applied Effect (자궁적출술 환자를 위한 critical pathway 개발과 적용효과)

  • Noh, Gi-Ok;Park, Kyung-Sook
    • Women's Health Nursing
    • /
    • v.6 no.2
    • /
    • pp.234-257
    • /
    • 2000
  • At present in the medical care, the study and effort for producing health service to consider efficiency, effectiveness, and quality are urgently called for because of the difficulty in the keen competition according to the inter- nationalization and opening, the operation in the medical institution service testing system, the change in the medical policy of KDRGs, and the lack of the health care cost increasing rate. As an alternative, the case management for the new management system is introduced in the U.S., and the Critical Pathway that is the method designing the contents of activity and its result has been developed and applied in order to anticipate and manage the patient-outcome for the realization of the cost-effective case-management. Thus, this study intended to analyze the effectiveness to obtain by developing the Critical Pathway presented as the method to improve the quality-betterment and cost effectiveness through the continuous and consistent patient management for the hysterectomy patient and applying it to the real practice. As a study method, this author formed a conceptual framework through considering five Critical Pathway used in the current U.S. and three Critical Pathway presented in the literature to develop the Critical Pathway for the hysterectomy patient, and made out the preliminary Critical Pathway through reviewing the old chart. This author made the verified the validity of the expert group about the developed Critical Pathway, and to confirm the possibility of practice application, completed and settled the final Critical Pathway after using the Critical Pathway to the hysterectomy patient from March 1st to 15th, 1997. Finally, to analyze the application-effect of the developed Critical Pathway, this author offered health care service applying the Critical Pathway to the hysterectomy patient from April 15th to August 31th, 1997. The guide for the Critical Pathway was carried out in advance by outpatient setting nurse for outpatient setting visit before the operation, and after hospitalization the primary nurse monitored the execution degree on the every duty. After discharge this author surveyed the complication through phone visiting, and one month after discharge surveyed the patient's reaction about the offered service when outpatient setting visit and analyzed the result. The source for health care cost was obtained by the statistics about the hospital charge which was offered by the General Business Department. The results were as follows. 1. It was decided that the vertical line of the Critical Pathway was made up of eight items such as monitoring/assessment, treatment, line/drains, activity, medication, lab test, diet, patient teaching, and the horizontal line of the Critical Pathway was made up of from hospitalization to discharge. 2. After the analysis of service contents through reviewing the old chart, it was decided that the horizontal line of the preliminary Critical Pathway was made up of from hopitalization to fourth postoperative day, and the vertical line of it was divided into eight items which were the contents to occur with the time frame of the horizontal line. 3. After the verifying the validity of the expert group about the preliminary Critical Pathway, the horizontal line was amended from hopitalization to third postoperative day, and taking their consensus, some contents of the horizontal line was amended and deleted. 4. From March 1st to 15th, 1997, to confirm the clinical suitability, this author offered eight hysterectomy patients the medical service through the Critical Pathway. The result was that three of them could be discharged at the expected discharge day, and the others later than that day. Supplementing the preliminary Critical Pathway through analyzing the cause of that delay- case, this author developed the final Critical Pathway. 5. There were no significant differences between the experimental and the control group in the incidence of complication(P > 0.05). 6. The 92.4% of experimental group was satisfied with the Critical Pathway service. 7. The length of hospital stay of the experimental group offered with the Critical Pathway service was 4.6 days and there was a significant difference that it was 1.3 days shorter than that of the control group(t=-29.514, P=0.000). 8. There wsa a significant difference that the mean medical charge per one patient of the experimental group offered the Critical Pathway service was cheaper \124,150 than that of the control group(t=-9.826, P=0.000). 9. The result that the author assumed and analyzed hospital income with the rate of turning bed was assumed that the increase of hospital income was \63,245,072 for that study, and the income increase was expected with \68,704,864 for a year. The result that this author applied the Critical Pathway to the hysterectomy patient have no differences in the incidence of complication, high satisfaction with that service, and the length of hospital stay decreased in the experimental group, and the mean hospital charge per one patient decreased, but hospital income increased. Suggestions for further study and nursing practice are as follows. 1. The study to apply the Critical Pathway for a year, verify the validity, and measure the effect repeatedly is needed. 2. To apply and manage the Critical Pathway effectively, the study to computerize it is needed. 3. The study to develop hospital-based Critical Pathway about other diseases or procedure, and measure the effect is needed.

  • PDF

Evaluation of X-ray System for Nondestructive Testing on Radioactive Waste Drums (방사성폐기물 드럼 비파괴 검사를 위한 X-ray 장비 평가)

  • Park, Jong-Kil;Maeng, Seong-Jun;Lee, Yeon-Ee;Hwang, Tae-Won
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.6 no.3
    • /
    • pp.189-203
    • /
    • 2008
  • The physical and chemical properties of radioactive waste drums, which have been temporarily stored on site, should be characterized before their shipment to a disposal facility in order to prove that the properties meet the acceptance guideline. The investigation of NDT(Nondestructive Test) method was figured out that the contents in drum, the quantitative analysis of free standing water and void fraction can be examined with X-ray NDT techniques. This paper describes the characteristics of X-ray NDT such as its principles, the considerations for selection of X-ray system, etc. And then, the waste drum characteristics such as drum type and dimension, contents in drum, etc. were examined, which are necessary to estimate the optimal X-ray energy for NDT of a drum. The estimation results were that: $(R)\acute{A}$ the proper X-ray energy is under 3 MeV to test the drums of 320 ${\beta}\S$ and less; $(R)\ddot{E}$ both X-ray systems of 450 keV and/or 3 MeV might be needed considering the economical efficiency and the realization. The number of drums that can be tested with 450 keV and 3 MeV X-ray system was figured out as 42,327 and 18,105 drums (based on storage of 2006. 12), respectively. Four testing scenarios were derived considering equipment procurement method, outsourcing or not, etc. The economical and feasibility assessment for the scenarios was resulted in that an optimal scenario is dependent on the acceptance guide line, the waste generator's policy on the waste treatment and the delivery to a disposal facility, etc. For example, it might be desirable that a waste generator purchases two 450 keV mobile system to examine the drums containing low density waste, and that outsourcing examination for the high density drums, if all NDT items such as quantitative analysis for 'free standing water' and 'void fraction', and confirmation of contents in drum have to be characterized. However, one 450 keV mobile system seems to be required to test only the contents in 13,000 drums per year.

  • PDF