• Title/Summary/Keyword: Yard

Search Result 735, Processing Time 0.026 seconds

Quay Crane Scheduling Considering the Workload of Yard Blocks in an Automated Container Terminal (장치장 블록의 작업부하를 고려한 안벽크레인 작업계획)

  • Lee, Seung-Hwan;Choe, Ri;Park, Tae-Jin;Kim, Kap-Hwan;Ryu, Kwang-Ryel
    • Journal of Intelligence and Information Systems
    • /
    • v.14 no.4
    • /
    • pp.103-116
    • /
    • 2008
  • This paper proposes quay crane (QC) scheduling algorithms that determine the working sequence of QCs over ship bays in a container vessel in automated container terminals. We propose two scheduling algorithms that examine the distribution of export containers in the stacking yard and determine the sequence of ship bays to balance the workload distribution among the yard blocks. One of the algorithms is a simple heuristic algorithm which dynamically selects the next ship bay based on the entropy of workloads among yard blocks whenever a QC finishes loading containers at a ship bay and the other uses genetic algorithm to search the optimal sequence of ship bays. To evaluate the fitness of each chromosome in the genetic algorithm, we have devised a method that is able to calculate an approximation of loading time of container vessels considering the workloads among yard blocks. Simulation experiments have been carried out to compare the efficiency of the proposed algorithms. The results show that our QC scheduling algorithms are efficient in reducing the turn-around time of container vessels.

  • PDF

Computation of the Shortest Distance of Container Yard Tractor for Multi-Cycle System (다중 사이클 시스템을 위한 실시간 위치 기반 컨테이너 야드 트랙터 최단거리 계산)

  • Kim, Han-Soo;Park, Man-Gon
    • Journal of Korea Multimedia Society
    • /
    • v.13 no.1
    • /
    • pp.17-29
    • /
    • 2010
  • A container terminal productivity is maximized by a minimized time for processing containers. So, we have been elevated the container terminal productivity through an improvement of computing system, but there are a limitation because of problems for transportation management and method. A Y/T(Yard Tractor), which is a representative transportation, is able to do only one process, loading or unloading, at one time. So if the Y/T can do loading and unloading step by step at a same time, the processing time would be shortened. In this paper, we proposed an effective operating process of Y/T(Yard Tractor) Multi-Cycle System by applying RTLS(Real Time Location System) to Y/T(Yard Tractor) in order to improve the process of loading and unloading at the container terminal. For this, we described Multi-Cycle System. This system consists of a real time location of Y/T based on RTLS, an indicating of Y/T location in real time with GIS technology, and an algorithm(Dijkstra's algorithm) of the shortest distance. And we used the system in container terminal process and could improve the container terminal productivity. As the result of simulation for the proposed system in this paper, we could verify that 9% of driving distance was reduced compared with the existing rate and 19% of driving distance was reduced compared with the maximum rate. Consequently, we could find out the container performance is maximized.

Remodeling and Damage of the Garden According to the Park Project in Deoksugung Palace During the Japanese Colonial Period (일제강점기 덕수궁(德壽宮) 공원화에 따른 정원의 개조와 훼손)

  • OH Junyoung
    • Korean Journal of Heritage: History & Science
    • /
    • v.56 no.3
    • /
    • pp.234-252
    • /
    • 2023
  • This study looked at the modification of major gardens while making Deoksugung Palace (德壽宮) a park in the Japanese colonial era. This is because landscaping work was carried out in various places from 1932 to 1933 to open Deoksugung Palace, which used to be an imperial palace, as a public recreation space. In particular, major gardens such as the front yard of Seokjojeon Hall (石造殿), the back yard of Hamnyeongjeon Hall (咸寧殿), and the back yard of Jeukjodang Hall (卽阼堂) were greatly transformed into different shapes from the original. During the first phase of construction in 1932, a water tank was installed in Seokjojeon Hall Garden, creating the first water space. This water tank was originally a structure installed in the front yard of Injeongjeon Hall (仁政殿) of Changdeokgung Palace (昌德宮). Around 1909, a water tank installed in the front yard of Injeongjeon Hall was relocated to Seokjojeon Garden in the process of turning Deoksugung Palace into a park. The water tank moved from the front yard of Injeongjeon Hall was a factor that transformed the central area of Seokjojeon Garden into a water space, and a fountain installed to replace the water tank remains to this day. The backyard of Hamnyeongjeon Hall was also renovated into a new shape during the first phase of construction. Originally, there was a terraced flowerbed called Hwagye (花階) in the backyard of Hamyujae Hall (咸有齋) and Hamnyeongjeon Hall, and it was restored from the construction that took place after the Great Fire of Deoksugung Palace. In the process of turning Deoksugung Palace into a park, a three-stage stonework was built in the front yard of Jeonggwanheon Pavilion (靜觀軒) which renovated the Hwagye in the backyard of Hamyujae Hall and Hamnyeongjeon Halll. The stonework built at that time was used as a peony garden to provide visitors with attractions after the opening of Deoksugung Palace, and it remains today with the name Jeonggwanheon's Hwagye. The backyard of the Jeukjodang Hall area is a case of damage in the second phase of construction in 1933. Like the backyard of Hamnyeongjeon Hall, the backyard of Jeukjodang Hall, where the Hwagye was originally built, was converted into a Japanese-style garden in the process of turning Deoksugung Palace into a park. The site where the Hwagye was demolished was decorated with a Japanese-style garden centered on mounding, small roads, and landscaping stones, as well as topographic control and planting work. Although there have been minor changes since liberation, the backyard of the Jeukjodang Hall area is still based on a Japanese-style garden created by turning Deoksugung Palace into a park.

Technical Consideration of Non-Insulated Audio Frequency Track-Circuit Device (무절연 가청주파수(AF) 궤도회로장치에 관한 고찰)

  • Cho, Bong-Kwan;Kim, Jong-Ki;Hwang, Hyeon-Chyeol;Ryu, Sang-Hwan;Kang, Shin-Ju
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.1709-1715
    • /
    • 2011
  • A track-circuit device exploits two rails as a conductor of an electrical circuit. It detects the presence or absence of the trains with variation of received level when wheel sets of the train shunt rails together. So, it plays an important role in train operation. Non-insulated audio frequency(AF) track-circuit device can separate the rails into tracks by insulated joints without physically cutting the rails. And it transmits AF signals at track boundary, of which frequency is different between adjacent tracks. It has been employed at station-to-station section of domestic high speed rail, general rail, and subway. But It was not used at station yard of complicated general railway where lots of branches exist. In this paper, we consider current development status of non-insulated AF track-circuit device for the use of station yard.

  • PDF

Steel Plate Girder Railway Bridge Ballast System using Rail Transfer Method(III) (선로이송 가설공법을 적용한 철도판형교 유도상화(III))

  • Min, Ji-Hong;Jang, Jun-Hyun;Kim, Jin-Yong;Woo, Yong-Keun
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1569-1576
    • /
    • 2011
  • To install heavy structures in the railway bridges, crane methods or launching methods using temporary structure have been applied. These methods are uneconomical because working yard is required, temporary cut of rail system, etc. In this study, various construction methods has been developed which are suitable to the filed conditions. In the case of simple span structure like plate girder bridges, the girder is loaded to troy system at the working yard and then transferred to the working place. To lift and lower the girder system, a new transfer system was developed. Different methods each for simple span bridge girder and long span girder were developed and detailed work procedures were proposed. Using these methods, the heavy structures can be installed with simple and safe work procedures and the construction cost and duration can be reduced.

  • PDF

입환 작업을 위한 RFID 실증 연구

  • Won, Jong-Un;Na, Hui-Seung;Jang, Yun-Seok
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2009.11a
    • /
    • pp.145-145
    • /
    • 2009
  • In this paper, we suggest how to adapt RFID system to train switching process, and then what we get the merit or problem. We analyze the train switching process to adapt RFID system on the process and have field test. The role of RFID system in train switching process is to automatically read car position information. The specification of the test system is 900MHz, and Gen2 passive tag. If we get the system which automatically read car position information in train switching yard, it prevents human errors and makes more reliability, the performance of train operation will grow up. Even though the environment of train switching yard is outdoors, the test result gives us the ability to adapt RFID system to train switching process and the process will be more simple.

  • PDF