• Title/Summary/Keyword: XTE(Cross Track Error)

Search Result 1, Processing Time 0.016 seconds

Optimization Algorithm for KP and XTE Implementation on the Submarine Cable Work (해저케이블 작업에서의 KP와 XTE 구현을 위한 최적화 알고리즘)

  • 이태오;임재홍
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.7 no.3
    • /
    • pp.423-436
    • /
    • 2003
  • Submarine optical fiber cable construction consists of marine survey, PLGR(Pre Lay Grapnel Run), shore-end-work, laying order. PLGR is the work process which removes the oceanic contaminations(ropes, wires, nets etc.) in the route before laying the submarine optical cable. This PLGR is work to ease the cable lay safely in seabed, improve the performance of Plough and ROV((Remotely-Operated Vehicle) laying work, and protect laying equipment. This paper presents the optimization algorithm implementation of KP(Kilometer Post) and XTE(Cross Track Error) to manage marine survey and PLGR work efficiently. In this paper, we composes overall PLGR work, and proposed optimization algorithm of KP and XTE. For the validity evaluation of this paper, KP and XTE decision algorithm are implemented and tested.