• Title/Summary/Keyword: X bar R control Chart Reliability Engineering

Search Result 2, Processing Time 0.015 seconds

A Study on the Methods for make sure of the Product Reliability (제품의 제조신뢰성 확보 방법론 연구)

  • Lee Jong-Beom;Cho Jai-Rip
    • Proceedings of the Korean Reliability Society Conference
    • /
    • 2005.06a
    • /
    • pp.147-155
    • /
    • 2005
  • When a failure or fault is detected, the product is adjusted or design change and is returned to its original condition before the failure or fault. Continuous improvement of the FMEA system is to determine an optimum product reliability that minimizes the total cost per unit time associated with inspection, repair, and the nondetection cost.

  • PDF

Development of Short-Run Standardized Control Charts and Acceptance Control Charts Classified by the Demand Volume and Variety (수요량과 다양성 패턴에 의해 유형화된 단기간 표준화 관리도와 단기간 합격판정 관리도의 개발)

  • Choi, Sung-Woon
    • Journal of the Korea Safety Management & Science
    • /
    • v.12 no.4
    • /
    • pp.255-263
    • /
    • 2010
  • The research developes short-run standardized control charts(SSCC) and short-run acceptance control charts(SACC) under the various demand patterns. The demand patterns considered in this paper are three types such as high-variety and repetitive low-volume pattern, extremely-high-variety and nonrepetitive low-volume pattern, and high-variety and extremely-low-volume pattern. The short-run standardized control charts developed by extending the long-run ${\bar{x}}$-R, ${\bar{x}}$-s and I-MR charts have strengths for practioners to understand and use easily. Moreover, the short-range acceptance control charts developed in the study can be efficiently used through combining the functions of the inspection and control chart. The weighting schemes such as Shewhart, moving average (MA) and exponentially weighted moving average (EWMA) can be considered by the reliability of data sets. The two types according to the use of control chart are presented in the short-range standardized charts and acceptance control charts. Finally, process capability index(PCI) and process performance index(PPI) classified by the demand patterns are presented.