• Title/Summary/Keyword: Workload Uniformity

Search Result 3, Processing Time 0.015 seconds

Parallel Rendering of High Quality Animation based on a Dynamic Workload Allocation Scheme (작업영역의 동적 할당을 통한 고화질 애니메이션의 병렬 렌더링)

  • Rhee, Yun-Seok
    • Journal of the Korea Society of Computer and Information
    • /
    • v.13 no.1
    • /
    • pp.109-116
    • /
    • 2008
  • Even though many studies on parallel rendering based on PC clusters have been done. most of those did not cope with non-uniform scenes, where locations of 3D models are biased. In this work. we have built a PC cluster system with POV-Ray, a free rendering software on the public domain, and developed an adaptive load balancing scheme to optimize the parallel efficiency Especially, we noticed that a frame of 3D animation are closely coherent with adjacent frames. and thus we could estimate distribution of computation amount, based on the computation time of previous frame. The experimental results with 2 real animation data show that the proposed scheme reduces by 40% of execution time compared to the simple static partitioning scheme.

  • PDF

Verification of the Appropriateness of the Standard for Tunnel Luminance in the Threshold Zone Through a Full-scale Tunnel Driving Test (실 규모 터널 주행실험을 통한 터널 경계부 휘도 기준의 적정성 검증)

  • Park, Won Il;Cho, Won Bum;Jeong, Jun Hwa
    • International Journal of Highway Engineering
    • /
    • v.17 no.6
    • /
    • pp.105-115
    • /
    • 2015
  • PURPOSES : This study aimed to evaluate the appropriateness of safety with the standard for threshold zone luminance as specified in the Recommendation for Lighting of Traffic Tunnel, which has been widely adopted worldwide. METHODS : A driving test of the subject in a full-scale road tunnel was conducted. The adaptation luminance and threshold zone luminance, which should be known for the driver to perceive an object within stopping sight distance, were obtained. These values were compared with the adaptation luminance and threshold zone luminance obtained by the existing reduced model test and tunnel lighting standard that has served as a guideline for the current threshold zone luminance standard. RESULTS : According to this study, threshold zone luminance should be increased to at least 1.8 times the value proposed in the existing studies and to twice the domestic tunnel lighting standard (KS C 3703: 2014). CONCLUSIONS : The threshold zone luminance proposed in this study differs largely from that obtained from indoor tests and from the current tunnel lighting standard used worldwide; this difference may be attributed to the fact that the indoor tests did not incorporate driving workload, non-uniformity of luminance distribution in terms of sight, and factors that reduce the visibility of the driver, such as the light reflected into the driver's eyes. Hence, it is necessary to further review the factors that reduce the visibility of drivers approaching tunnels in order to determine the rational tunnel threshold zone luminance.

A Study on the Optimization Model for the Project Portfolio Manpower Assignment Using Genetic Algorithm (유전자 알고리즘을 이용한 프로젝트 포트폴리오 투입인력 최적화 모델에 관한 연구)

  • Kim, Dong-Wook;Lee, Won-Young
    • Journal of Information Technology Services
    • /
    • v.17 no.4
    • /
    • pp.101-117
    • /
    • 2018
  • Companies are responding appropriately to the rapidly changing business environment and striving to lead those changes. As part of that, we are meeting our strategic goals through IT projects, which increase the number of simultaneous projects and the importance of project portfolio management for successful project execution. It also strives for efficient deployment of human resources that have the greatest impact on project portfolio management. In the early stages of project portfolio management, it is very important to establish a reasonable manpower plan and allocate performance personnel. This problem is a problem that can not be solved by linear programming because it is calculated through the standard deviation of the input ratio of professional manpower considering the uniformity of load allocated to the input development manpower and the importance of each project. In this study, genetic algorithm, one of the heuristic methods, was applied to solve this problem. As the objective function, we used the proper input ratio of projects, the input rate of specialist manpower for important projects, and the equal load of workload by manpower. Constraints were not able to input duplicate manpower, Was used as a condition. We also developed a program for efficient application of genetic algorithms and confirmed the execution results. In addition, the parameters of the genetic algorithm were variously changed and repeated test results were selected through the independent sample t test to select optimal parameters, and the improvement effect of about 31.2% was confirmed.