• Title/Summary/Keyword: Wind-diesel hybrid system

Search Result 45, Processing Time 0.021 seconds

A Pre-Feasibility Test of Introducing Renewable Energy Hybrid Systems -Case Studies for 3 Off-Grid Islands- (도서지역 신·재생복합 전력시스템 보급 타당성 분석 -3개 도서지역 분석결과-)

  • Jang, HaNa;Kim, Suduk
    • Environmental and Resource Economics Review
    • /
    • v.15 no.4
    • /
    • pp.693-712
    • /
    • 2006
  • A pre-feasibility test is done for renewable energy hybrid power systems at off~grid islands in which the current power supply is provided only by diesel generation. We apply Homer (Hybrid Optimization Model for Electric Renewables) which was developed by the National Renewable Energy Laboratory (NREL) for the analysis to identify the cost-minimizing combination of power generating facilities for the given load profiles. Chuja-Do, Geomun-Do and Youngsan-Do have been selected for our analysis considering the wind resources data of the Korea Institute of Energy Research (KIER). Information on wind speed, solar radiation and temperature is also used for the analysis. System component cost information from overseas market has been used due to the lack of domestic information. Site specific Load profile for electricity demand for those islands are reconstructed based on the partial survey results obtained form other sources. The LCOE of the least cost hybrid power systems for Chuja-Do, Geomun-Do and Youngsan-Do are $0.278/kWh, $0.234/kWh and $0.353/kWh, respectively Considering the fact that diesel generation is being subsidized at the price of $0.300/kWh by the government, first 2 cases are economically feasible for the introduction of renewable energy hybrid systems to those islands. But the third case of Youngsan-Do does not meet the criteria. The basic differences of these pre-feasibility test results are from the differences of the site specific renewable energy conditions, especially wind resources. In summary, promoting hybrid systems in the off-grid remote island should be based on the economic feasibility test results. Not all the off-grid islands are feasible for introducing this renewable energy hybrid system.

  • PDF

Influence of Grid Operation from Ullung Wind Power Plant (울릉풍력발전의 계통에 주는 영향 분석)

  • Lee, Seung-Hun;Seo, Young-Taek;Oh, Chul-Soo
    • Proceedings of the KIEE Conference
    • /
    • 2001.04a
    • /
    • pp.495-497
    • /
    • 2001
  • Ullung wind power plant is a remarkable event to get a great concern of many people, because it has been observed as a first case of combining the new large different generating sources, i. e. hybrid diesel-wind power system. This paper is dealing with the analysis of this problem and with the grid-coordination. The first endeavor of actual measurement was performed at site during October 18-21. 2000 and a part of this records is presented in this paper.

  • PDF

A Study on the Establishment of the Microgrid in Chujado Island (추자도 마이크로그리드 구축에 관한 연구)

  • Kang, Min-Hyeok;Kim, Dong-Wan;Kim, Eel-Hwan
    • Journal of IKEEE
    • /
    • v.23 no.1
    • /
    • pp.289-294
    • /
    • 2019
  • At present, domestic small islands mainly supply electric power using diesel generators. However, diesel generators can cause instability of the power system due to slow response on power load fluctuation, and cause environmental problems due to the emission of carbon gas by using fossil fuels. In order to overcome this problem, this paper proposes a method to establish an optimal microgrid by introducing solar power, wind power, and energy storage device to Chujado Island, which is supplied with electric power through a diesel generator. The economical optimum capacity of each distributed power source is calculated by using HOMER (Hybrid Optimization Model for Multiple Energy Resources) program and the proposed microgrid is validated by using PSCAD/EMTDC (Power Systems Computer Aided Design/ Electromagnetic Transients including DC) program which can analyze system stability.

Capacity Optimizing method of Distributed Generators in Stand-Alone Microgrid Considering Grid Link-Characteristics

  • Han, Soo-Kyeong;Choi, Hyeong-Jin;Cho, Soo-Hwan
    • Journal of Electrical Engineering and Technology
    • /
    • v.13 no.4
    • /
    • pp.1483-1493
    • /
    • 2018
  • Recently, more power facilities are needed to cope with the increasing electric demand. However, the additional construction of generators, transmission and distribution installations is not easy because of environmental problems and citizen's complaints. Under this circumstance, a microgrid system with distributed renewable resources emerges as an alternative of the traditional power systems. Moreover, the configuration of power system changes with more DC loads and more DC installations. This paper is written to introduce an idea of a genetic algorithm-based solution to determine the optimal capacity of the distributed generators depending on the types of system configuration: AC-link, DC-link and Hybrid-link types. In this paper, photovoltaic, wind turbine, energy storage system and diesel generator are considered as distributed generators and the feasibility of the proposed algorithm is verified by comparing the calculated capacity of each distributed resource with HOMER simulation results for 3 types of system configuration.

A Study on Optimal Capacity Design of Renewable Combined Power System for Energy Self-Sufficient Island (에너지 자립섬을 위한 신재생복합발전시스템의 최적용량 설계에 관한 연구)

  • Chang, Bong-Chul;Moon, Chae-Joo;Chang, Young-Hak;Park, Tae-Sik;Jeong, Moon-Seon
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.10 no.11
    • /
    • pp.1271-1276
    • /
    • 2015
  • The recent trend is that diesel power generation on islands where its prime cost for power generation is high is replaced by new and renewable energy. Therefore, south Jeolla province is progressing the construction project of self-sufficient islands for the areas where power is supplied by depending on diesel generators, which is the project that power is supplied through eco-friendly energy source using sunlight, wind power and energy storage device etc. However, it is difficult to construct new and renewable energy source with the capacity to respond to the load perfectly due to its environmental and geographical conditions regarding capacity design of new and renewable energy. Besides, Microgrid design considering appropriate capacity design of the system components and efficient operation is required through the analysis of climate conditions and load patterns from the design stage for optimal composition of a hybrid system with economic feasibility. Therefore, this study is aimed to conduct a research on optimal combination, capacity calculation and economic feasibility by comprising a hybrid power generation system which will replace 40% of power generation by diesel as new and renewable energy source for Geomun Island where has more than 300 households and requires expansion of the facility among islands located in southwest coast.