• Title/Summary/Keyword: Wind park Wind farm

Search Result 98, Processing Time 0.033 seconds

Suitability Review on Development Plans of Offshore Wind Farm Based on National Wind Map and Geographic Information (국가바람지도 및 국가지리정보에 의한 해상풍력단지 개발계획의 적합성 검토)

  • Kim, Hyun-Goo;Hwang, Hyo-Jung;Song, Kyu-Bong;Hwang, Sun-Young;Yun, Jin-Ho
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2009.06a
    • /
    • pp.534-535
    • /
    • 2009
  • The objective of this research aims preliminary assessments of the proposed plans of offshore wind farm development based on the recently established national offshore wind map and suitability assessment system of offshore wind farm. Incheon Mueodo, Busan Dadaepo-Gadukdo, Sinangun Haeodo have been assessed considering geographic constraints such as water depth, offshore distance, national park, grid connection, and meteorological constraint such as wind power density and wind direction. According to the assessment, Mueodo plan has a weak point in grid connection and several geographic limitations are involved in Haeodo plan while Dadaepo-Gadukdo seems the most possible plan among the review cases. Because of limited assessment in this research, more detail and further consideration are necessary to make a decision of a feasibility project at proposed sites.

  • PDF

Analysis of losses within SMES system for compensating output fluctuation of wind power farm

  • Park, S.I.;Kim, J.H.;Le, T.D.;Lee, D.H.;Kim, D.J.;Yoon, Y.S.;Yoon, K.Y.;Kim, H.M.
    • Progress in Superconductivity and Cryogenics
    • /
    • v.16 no.4
    • /
    • pp.57-61
    • /
    • 2014
  • Output fluctuation which is generated in wind power farm can hinder stability of total power system. The electric energy storage (EES) reduces unstable output, and superconducting magnetic energy storage (SMES) of various EESs has the proper performance for output compensation of wind power farm since it charges and discharges large scale power quickly with high efficiency. However, because of the change of current within SMES, the electromagnetic losses occur in the process of output compensation. In this paper, the thermal effect of the losses that occur in SMES system while compensating in wind power farm is analyzed. The output analysis of wind power farm is processed by numerical analysis, and the losses of SMES system is analyzed by 3D finite element analysis (FEA) simulation tool.

Study for the Power Characteristic of NREL Phase VI Blade considering Wind Shear (Wind Shear를 고려한 NREL Phase VI 블레이드의 출력특성연구)

  • Park, Sangjun;Lee, Kyungseh;Kim, Youngchan;Park, Hyunchul
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2011.05a
    • /
    • pp.56.2-56.2
    • /
    • 2011
  • As rotor blade of a wind turbine becomes larger to satisfy the economic efficiency for offshore wind farm, the numerical analysis considering wind profile is getting emphasized. In this paper, the study for the power characteristic of a wind turbine is carried out using NREL phase VI wind turbine applied wind profile. The experimental data of NASA Ames wind tunnel for inflow velocity 7m/s is used and the numerical result is obtained by using CFD commercial solver(FLUENT).

  • PDF

Economic analysis of a 22.9 kV HTS power cable and conventional AC power cable for an offshore wind farm connections

  • Jung, Ga-Eun;Dinh, Minh-Chau;Sung, Hae-Jin;Park, Minwon;Yu, In-Keun
    • Progress in Superconductivity and Cryogenics
    • /
    • v.20 no.4
    • /
    • pp.60-64
    • /
    • 2018
  • As the offshore wind farms increase, interest in the efficient power system configuration of submarine cables is increasing. Currently, transmission system of the offshore wind farm uses almost AC system. High temperature superconducting (HTS) power cable of the high capacity has long been considered as an enabling technology for power transmission. The HTS cable is a feasible way to increase the transmission capacity of electric power and to provide a substantial reduction in transmission losses and a resultant effect of low CO2 emission. The HTS cable reduces its size and laying sectional area in comparison with a conventional XLPE or OF cable. This is an advantage to reduce its construction cost. In this paper, we discuss the economic feasibility of the 22.9 kV HTS power cable and the conventional AC power cables for an offshore wind farm connections. The 22.9 kV HTS power cable cost for the offshore wind farm connections was calculated based on the capital expenditure and operating expense. The economic feasibility of the HTS power cable and the AC power cables were compared for the offshore wind farm connections. In the case of the offshore wind farm with a capacity of 100 MW and a distance of 3 km to the coast, cost of the 22.9 kV HTS power cable for the offshore wind farm connections was higher than 22.9 kV AC power cable and lower than 70 kV AC power transmission cable.

Economic analysis of jeju offshore pilot run wind farm by sensitivity analysis (민감도 분석을 적용한 제주 연안 풍력단지 설계의 경제성 분석)

  • Lee, K.H.;Park, J.H.;Jin, J.W.;Kwon, K.R.;Choi, K.H.
    • Journal of Power System Engineering
    • /
    • v.16 no.5
    • /
    • pp.13-19
    • /
    • 2012
  • In this paper, the offshore wind farms have been designed by using WindPRO with the help of real wind data measurements at Jeju Costal area by calculating the annual energy production for exact economic evaluation. In order to achieve benefit of wind farm, the annual revenue for power generation have been calculated with SMP and REC value. And construction cost has derived from the real wind farm project case. Also O&M cost has been estimated by OMCE (Operating & Maintenance Cost Estimator) to get accurate cost of wind farm. Economic evaluation of wind farms have been performed by comparing above parameters. In addition, sensitivity analysis calculating the effect of these factors has also been carried out.

DC-link Voltage Control of HVDC for Offshore Wind Farm using Improved De-loading Method (개선된 De-loading기법을 이용한 해상풍력 연계용 HVDC의 DC 전압의 제어방안)

  • Huh, Jae-Sun;Moon, Won-Sik;Park, Sang-In;Kim, Doo-Hee;Kim, Jae-Chul
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.3
    • /
    • pp.399-404
    • /
    • 2015
  • This paper presents the DC voltage control method in DC link of High Voltage Direct Current(HVDC) for an offshore wind farm in Low Voltage Ride Through(LVRT) situation. Wind generators in an offshore wind farm are connected to onshore network via HVDC transmission. Due to LVRT control of grid side inverter in HVDC, power imbalancing in DC link is generated and this consequentially causes rising of DC voltage. A de-loading scheme is one of the method to protect the wind power system DC link capacitors from over voltage. But the flaw of this method is slow control response time and that it needs long recovery time to pre-fault condition after fault clear. Thus, this paper proposes improved de-loading method and we analyze control performance for DC voltage in LVRT control of HVDC for an offshore wind farm.

Correction of Overcurrent Protective Relay on Distribution Feeders Considering the Power Output of Wind Farm Interconnected with Utility Networks (계통 연계 풍력발전단지의 출력 조건을 고려한 배전선 과전류 계전기 정정)

  • Kim, J.W.;Jang, S.I.;Kim, K.H.;Yoo, N.S.;Park, H.J.;Song, D.S.;Lee, J.M.
    • Proceedings of the KIEE Conference
    • /
    • 2003.07a
    • /
    • pp.342-344
    • /
    • 2003
  • This paper describes the correction of overcurrent protective relaying set value in distribution networks interconnected with wind farm by dedicated line. The wind farm composed of wind turbine generators is one of the great energy sources; however, it would be also highly possible that the current in the point of common coupling is influenced by the output power of wind farm. So, the overcurrent relay applied in distribution feeders might generate trip signal for normal operation. In order to prevent the mal-operation of overcurrent relay, it is necessary to correct the relay's setting value according to the output power of end farm. This paper presents the influence of wind farm on the overcurrent relaying set value in distribution feeders for cases of fault as well as normal operation and proposes the basic strategy for correction of overcurrent relaying set value.

  • PDF

The Study of the Wind Resource and Energy Yield Assessment for the Wind Park Development (풍력자원해석 및 에너지예측을 통한 풍력발전단지 설계 연구)

  • Byun, Hyo-In;Ryu, Ji-Yune;Kim, Doo-Hoon
    • New & Renewable Energy
    • /
    • v.1 no.2 s.2
    • /
    • pp.19-25
    • /
    • 2005
  • This study explains ther procedure that should be taken to develp a successful wind park project. It provides a guideline for the activities and studies to be done as a step by step solution. This study follows a chronological flow throughout the whole development Process. This Paper covers technical consideration, assessment of wind energy resource, wind Park siting and energy yield calculation This presented knowledge h3s been mostly gained by the experience from Youngduk wind park project. The further comparison study will be performed between the theoretical prediction and the actual yield of the Youngduk wind park.

  • PDF

Optimum Macro-Siting for Offshore Wind Farm Using RDAPS Sea Wind Model (RDAPS Sea Wind Model을 이용한 해상풍력발전단지 최적 Macro-Siting)

  • Lee, K.H.;Jun, S.O.;Park, K.H.;Lee, D.H.;Park, Jong-Po
    • 한국전산유체공학회:학술대회논문집
    • /
    • 2011.05a
    • /
    • pp.286-290
    • /
    • 2011
  • This paper introduces the optimum macro-siting of a potential site for an offshore wind farm around Jeju Island using the RDAPS sea wind model. The statistical model was developed by analyzing the sea wind data from RDAPS model, and the meso-scale digital wind map was prepared. To develop the high resolution spatial calibration model, Artificial Neural Network(ANN) models were used to construct the wind and bathymetric maps. Accuracy and consistency of wind/bathymetric spatial calibration models were obtained using analysis of variance. The optimization problem was defined to maximize the energy density satisfying the criteria of maximum water depth and maximum distance from the coastline. The candidate site was selected through Genetic Algorithm(GA). From the results, it is possible to predict roughly a candidate site location for the installation of the offshore wind jam, and to evaluate the wind resources of the proposed site.

  • PDF

Development of Web-Based Wind Data Analysis System for HeMOSU-1 (웹기반 해모수-1 풍황자료 분석 시스템 개발)

  • Ryu, Ki-Wahn;Park, Kun-Sung;Lee, Jong-Hwa;Oh, Soo-Yun;Kim, Ji-Young;Park, Myoung-Ho
    • Journal of Wind Energy
    • /
    • v.4 no.1
    • /
    • pp.60-67
    • /
    • 2013
  • A web-based program was developed for analyzing weather and structure data from the HeMOSU-1 offshore meteorological mast installed by the KEPCO Research Institute, and 35 km west-southwestward away from Gyeokpo located in Jeonbuk province. All of the measured data are obtained through the data transmitter and the server systems equipped on the HeMOSU-1 and the aerodynamic laboratory in Chonbuk National University respectively. The dualised server system consists of two servers, one is for logging the 1 second based raw data with 10 minute averaged values, and the other is for managing web page with processed weather data. Daily or weekly 10-min averaged data can be provided based on the input date by users. Processed weather data such as wind rose, Weibull distribution, diurnal distribution, turbulence intensity according to wind speed, wind energy density, and so forth are visualized through the web page which would be both useful and informative for developing the wind farm or designing a wind blade for the wind farm nearby southwest sea around the Korean Peninsula. The URL for this web page is http://www.hemosu.org/.