• Title/Summary/Keyword: Wind atlas analysis model

Search Result 3, Processing Time 0.016 seconds

Analysis of Wind Energy Resource & Case study for Wind Park Siting (풍력발전단지 개발을 위한 풍자원 해석 및 단지 설계)

  • Byun, Hyo-In;Ryu, Ji-Yune;Kim, Doo-Hoon
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2005.06a
    • /
    • pp.21-24
    • /
    • 2005
  • This study explains the procedure that should be taken to develop a successful wind park project. It Provide guideline for activities and studies to be done step by step solution. This study follow a chronological flow through the development process. They cover Technical consideration, Assessment of Wind Energy Resource, Wind park siting and Energy yield calculation. It's build on the experience gained by the Youngduk Wind Park project and give the playa role in the development of wind energy projects. It is important to understand all theses issues if a new project is to be successfully completed.

  • PDF

The Study of the Wind Resource and Energy Yield Assessment for the Wind Park Development (풍력자원해석 및 에너지예측을 통한 풍력발전단지 설계 연구)

  • Byun, Hyo-In;Ryu, Ji-Yune;Kim, Doo-Hoon
    • New & Renewable Energy
    • /
    • v.1 no.2 s.2
    • /
    • pp.19-25
    • /
    • 2005
  • This study explains ther procedure that should be taken to develp a successful wind park project. It provides a guideline for the activities and studies to be done as a step by step solution. This study follows a chronological flow throughout the whole development Process. This Paper covers technical consideration, assessment of wind energy resource, wind Park siting and energy yield calculation This presented knowledge h3s been mostly gained by the experience from Youngduk wind park project. The further comparison study will be performed between the theoretical prediction and the actual yield of the Youngduk wind park.

  • PDF

Verification of the Validity of WRF Model for Wind Resource Assessment in Wind Farm Pre-feasibility Studies (풍력단지개발 예비타당성 평가를 위한 모델의 WRF 풍황자원 예측 정확도 검증)

  • Her, Sooyoung;Kim, Bum Suk;Huh, Jong Chul
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.39 no.9
    • /
    • pp.735-742
    • /
    • 2015
  • In this paper, we compare and verify the prediction accuracy and feasibility for wind resources on a wind farm using the Weather Research and Forecasting (WRF) model, which is a numerical weather-prediction model. This model is not only able to simulate local weather phenomena, but also does not require automatic weather station (AWS), satellite, or meteorological mast data. To verify the feasibility of WRF to predict the wind resources required from a wind farm pre-feasibility study, we compare and verify measured wind data and the results predicted by WAsP. To do this, we use the Pyeongdae and Udo sites, which are located on the northeastern part of Jeju island. Together with the measured data, we use the results of annual and monthly mean wind speed, the Weibull distribution, the annual energy production (AEP), and a wind rose. The WRF results are shown to have a higher accuracy than the WAsP results. We therefore confirmed that WRF wind resources can be used in wind farm pre-feasibility studies.