• Title/Summary/Keyword: Wind Turbine Test Site

Search Result 42, Processing Time 0.024 seconds

Comparison of Bin Averaging Method and Least Square Method for Site Calibration (단지교정을 위한 빈평균방법과 최소자승법의 비교)

  • Yoo, Neung-Soo;Nam, Yun-Su;Lee, Jeong-Wan;Lee, Myeong-Jae
    • Journal of Industrial Technology
    • /
    • v.25 no.B
    • /
    • pp.157-164
    • /
    • 2005
  • Two methods, the bin averaging method and least square method, are often used in calibrating wind turbine test sites. The objective of this work was to determine a better method to predict the wind speed at wind turbine installing point. The calibration was done at the test site on a complex terrain located in Daegwallyeong, Korea. It was performed for two different cases based on the IEC 61400-12 power performance measurement standard. The wind speeds averaged for 10 minutes ranged between 4 m/s and 16 m/s. The wind-direction bins of each meteorological mast were 10 degrees apart, and only the bins having data measured for more than 24 hours were employed for the test site calibration. For both cases, the two methods were found to yield almost same results which estimated real wind speed very closely.

  • PDF

Noise Test and Evaluation of a 750kW Wind Turbine Generator (750kW 풍력발전기의 소음실증)

  • Kim, Seock-Hyun;Heo, Wook;Lee, Hyun-Woo
    • Journal of Industrial Technology
    • /
    • v.27 no.B
    • /
    • pp.59-64
    • /
    • 2007
  • This study introduces an environmental noise evaluation procedure and results for a wind turbine (W/T) system. Test and evaluation are required by the international standard IEC 61400-11 in the aspect of environmental effect. Test and evaluation are performed on U-50 WT model which is first developed by the domestic W/T manufacturer. W/T test model is under operation in Daekwanryung wind test site. An integrated monitoring system in the test site is utilized for the evaluation. With the noise signal, meteorological data and W/T operational data are monitored in real time by the integrated monitoring system using LabVIEW. From the measured noise data, acoustic power level are estimated and compared with those of other similar size WT under the wind speeds required by international standard.

  • PDF

Comparative evaluation of different offshore wind turbine installation vessels for Korean west-south wind farm

  • Ahn, Dang;Shin, Sung-chul;Kim, Soo-young;Kharoufi, Hicham;Kim, Hyun-cheol
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.9 no.1
    • /
    • pp.45-54
    • /
    • 2017
  • The purpose of this study is to evaluate various means of wind power turbines installation in the Korean west-south wind farm (Test bed 100 MW, Demonstrate site 400 MW). We presented the marine environment of the southwest offshore wind farm in order to decide the appropriate installation vessel to be used in this site. The various vessels would be WTIV (Wind turbine installation vessel), jack-up barge, or floating crane ${\cdots}$ etc. We analyzed the installation cost of offshore wind turbine and the transportation duration for each vessel. The analysis results showed the most suitable installation means for offshore wind turbine in the Korean west-south wind farm.

Establishment of Remote Monitoring System for Wind Turbine Test Sites Based on Hierarchical Architecture (계층적 구조를 갖는 풍력발전 실증단지 원격 풍황 모니터링 시스템 구축)

  • Cho, Byung-Ha;Lee, Jeong-Wan
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.26 no.9
    • /
    • pp.81-87
    • /
    • 2009
  • In this paper, remote monitoring system for wind turbine site is developed. This system is a hierarchical reliable monitoring system connected by wireless communication channels between monitoring host computer and modular slave measuring subsystems. The design of this systems; the slave measuring subsystems is placed in meteorological tower and wind turbine, and the supervisory host computer is in the safety zone. The slave measuring subsystems signals are from a meteorological tower, wind turbine generator and tower. For monitoring and command function, the supervisory computer is implemented with a PC using graphic user interface. This system can be transferred the information among host computer and remote computers through the Ethernet. Consequently we can get reliability but economic system. The system has the concept of universality and modularity, so it is simple and easy to implement in wind turbine test sites.

Noise Test and Evaluation of a 750 kW Wind Turbine Generator (750 kW 풍력발전기의 소음 실증)

  • Kim, Seock-Hyun;Kim, Tae-Hyung
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.16 no.2 s.107
    • /
    • pp.124-131
    • /
    • 2006
  • This study introduces an environmental noise evaluation procedure for wind turbines(W/T) and the evaluation result of a 750 kW wind turbine(W/T) system. Test and evaluation are performed according to the international standard IEC 61400-11 on J48 W/T which is under operation in Daekwanryung W/T test site. With the meteorological data and W/T operational data, noise data are monitored and analysed. An integrated monitoring system is constructed in the test site and is utilized for the evaluation. From the measured noise data, acoustic power level, directivity and tonality of the W/T are estimated under the wind speeds required fly the International standard. The purpose of the study is to establish an W/T noise evaluating system satisfying the international standard and to obtain noise data for home made 750 kW W/T.

Development of a Wind Turbine Monitoring System using LabVIEW (LabVIEW를 이용한 풍력발전기 모니터링 시스템 개발)

  • 남윤수;김형기;유능수;이정완
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.20 no.5
    • /
    • pp.92-98
    • /
    • 2003
  • A wind turbine monitoring system is essential equipment fur the performance evaluation and mechanical load analysis of a wind turbine. A monitoring system using LabVIEW is developed in this study. This system monitors signals from a meteorological mast, wind turbine generator, and tower. The discrete signals which are sampled at t Hz are automatically saved on a data file in the unit of a day. Besides these basic functions, the developed monitoring system has the other several capabilities. One of them is the information access from a remote PC through the internet. A vision image of the test site area and data files that are produced by LabVIBW software can be uploaded to the main computer located in a remote site. An emergency backup system using UPS fur the power loss on the monitoring HW is also prepared, A detail explanation for the developed wind turbine monitoring system is presented in this study.

750kW Gearless Type Wind Turbine Generator System (750kW급 Gearless형 국산화 풍력발전시스템)

  • Ryu, Ji-Yoon;Park, Jin-Il;Kim, Dae-Hyun;Hwang, Jin-Su;Kim, Doo-Hoon
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2006.06a
    • /
    • pp.245-248
    • /
    • 2006
  • The first of korean 750kW gearless type wind turbine is developed. The wind turbine is designed, manufactured and tested by GE regulation and obtained the design certificate by GL. And the performance test is being performed at the demonstration site now. This paper presents the history of development and performance test for 750kW gearless type wind turbine.

  • PDF

The Field Test of Power Performance Measurement for U50 Wind Turbine (U50 풍력발전기 출력성능 실증연구)

  • Hwang, Jin-Su;Jang, Seong-Tae;Kim, Dae-Hyun;Bang, Jo-Hyug;Ryu, Ji-Yune
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2007.11a
    • /
    • pp.372-375
    • /
    • 2007
  • 750kW gearless type wind turbine, named U50, is developed by UNISON in Korea. The newly developed wind turbine should be evaluated the power curve and the estimated annual energy production by following international standard to verify the power performance characteristics. This paper shows the test and evaluation procedure according to IEC 61400-12-1 which specifies a procedure of measuring the power performance characteristics of a single wind turbine and applies to the testing of wind turbines of all types and sized connected to the electrical power network. And this paper also shows the power performance characteristics for U50 wind turbine which is determined in accordance with IEC regulation.

  • PDF

Power Curve Measurements on the 6kW Wind Turbine (6kW 풍력발전기의 출력곡선 측정)

  • Yoo, Neung-Soo;Nam, Yoon-Su;Lee, Jung-Wan;Cho, Joo-Suk
    • Journal of Industrial Technology
    • /
    • v.25 no.B
    • /
    • pp.149-157
    • /
    • 2005
  • The power performance monitoring system for a small class of wind turbine is established. The wind turbine power performance characteristics are determined by measured power curve and the estimated annual energy production (AEP). The measured power curve is determined by collecting simultaneous measurements of wind speed and power output at the test site under varying wind conditions. In order to determine the power performance characteristics of the wind turbine accurately, the data are of sufficient quantity and quality shall be corrected according to defined criteria. In this study, the 6kW wind turbine made by Germany Inventus GmbH is examined.

  • PDF

A Study of Accelerated Life Test Conditions for Yaw Drive of Wind Turbine (풍력 발전기용 요 드라이브의 가속수명시험 조건에 관한 연구)

  • Lee, Young-Bum;Kang, Bo-Sik
    • Journal of Applied Reliability
    • /
    • v.14 no.4
    • /
    • pp.213-219
    • /
    • 2014
  • Wind turbine, which is attracting part of the renewable energy and is researching continuously, is going to be large size for high efficiency. There is a yaw system rotating the nacelle, weighted about 600 tons, to be perpendicular with the wind direction blowing in the large wind turbine. The wind turbine is focusing on the reliability improvement because working environment effect is bigger than any other points and specially, the reliability improvement of the yaw drive is required by the customer because it is the key component of the wind turbine. Because of this, the establishment of criteria for yaw drive is required because yaw drive system is the part of the wind turbine closely related with ensuring the reliability. So, this study did the failure analysis of the yaw drive system, which is consisted with 10 sets of yaw drives through researching and analyzing the site conditions. Also this study designed the life test method based on the failure analysis and working condition of the yaw drive. To design the accelerated life test of the yaw drive, this study reviewed the torque, lubrication condition, and frequency of use and etc. Finally, this selected the torque as the acceleration factor which is affected mainly to the system and also, the test equipment was developed based on the requirement of the life and performance test.