• Title/Summary/Keyword: Wind Project

Search Result 267, Processing Time 0.023 seconds

Establishment of Korean Wind Map by Numerical Wind Simulation (수치바람모의에 의한 한반도 바람지도 구축)

  • Kim, Hyun-Goo;Jang, Moon-Seok;Lee, Hwa-Woon;Choi, Hyun-Jeong
    • 유체기계공업학회:학술대회논문집
    • /
    • 2006.08a
    • /
    • pp.265-268
    • /
    • 2006
  • In this paper, the research background and objectives of the wind mapping project of the Korean Peninsula, which has been carrying out as a part of "Investigation of new-renewable energy resources and establishment of comprehensive management system" funded by Korea Ministry of Commerce, Industry and Energy, are introduced together with the intermediate result of the project so far. The Korean wind map is to be established by numerical wind simulation based on terrain model ME-DEM and land-use model ME-LUM with the spatial resolution of 10km.

  • PDF

Comparative Analysis of Observation and NWP Data of Downslope Windstorm Cases during 3-Dimensional Meteorological Observation Project in Yeongdong Region of Gangwon province, South Korea in 2020 (2020 강원영동 공동 입체기상관측 기간 강풍 사례에 대한 관측자료와 수치모델 비교 분석)

  • Kwon, Soon-Beom;Park, Se-Taek
    • Atmosphere
    • /
    • v.31 no.4
    • /
    • pp.395-404
    • /
    • 2021
  • In order to investigate downslope windstorm by using more detailed observation, we observed 6 cases at 3 sites - Inje, Yongpyeong, and Bukgangneung - during "3-D Meteorological Observation Project in Yeongdong region of Gangwon province, South Korea in 2020." The results from analysis of the project data were as follows. First, AWS data showed that a subsidence inversion layer appeared in 800~700 hPa on the windward side and 900~850 hPa on the leeward side. Second, before strong wind occurred, the inversion layer had descended to about 880~800 hPa. Third, with mountain wave breaking, downslope wind was intensified at the height of 2~3 km above sea level. After the downslope wind began to descend, the subsidence inversion layer developed. When the subsidence inversion layer got close to the ground, wind peak occurred. In general, UM (Unified Model) GDAPS (Global Data Assimilation Prediction System) have had negative bias in wind speed around peak area of Taebaek mountain range, and positive bias in that of East Sea coast area. The stronger wind blew, the larger the gap between observed and predicted wind speed by GDAPS became. GDAPS predicted strong p-velocity at 0600 LST 25 Apr 2020 (4th case) and weak p-velocity at 2100 LST 01 Jun 2020 (6th case) on the lee-side of Taebaek mountain range near Yangyang. As hydraulic jump theory was proved, which is known as a mechanism of downslope windstorm in Yeongdong region, it was confirmed that there is a relationship between p-velocity of lee-side and wind speed of eastern slope of Taebaek mountain range.

Long-Term Wind Resource Mapping of Korean West-South Offshore for the 2.5 GW Offshore Wind Power Project

  • Kim, Hyun-Goo;Jang, Moon-Seok;Ko, Suk-Hwan
    • Journal of Environmental Science International
    • /
    • v.22 no.10
    • /
    • pp.1305-1316
    • /
    • 2013
  • A long-term wind resource map was made to provide the key design data for the 2.5 GW Korean West-South Offshore Wind Project, and its reliability was validated. A one-way dynamic downscaling of the MERRA reanalysis meteorological data of the Yeongwang-Gochang offshore was carried out using WindSim, a Computational Fluid Dynamics based wind resource mapping software, to establish a 33-year time series wind resource map of 100 m x 100 m spatial resolution and 1-hour interval temporal resolution from 1979 to 2012. The simulated wind resource map was validated by comparison with wind measurement data from the HeMOSU offshore meteorological tower, the Wangdeungdo Island meteorological tower, and the Gochang transmission tower on the nearby coastline, and the uncertainty due to long-term variability was analyzed. The long-term variability of the wind power was investigated in inter-annual, monthly, and daily units while the short-term variability was examined as the pattern of the coefficient of variation in hourly units. The results showed that the inter-annual variability had a maximum wind index variance of 22.3% while the short-term variability, i.e., the annual standard deviation of the hourly average wind power, was $0.041{\pm}0.001$, indicating steady variability.

The Characteristic of Wind Turbine Industry of the West-South Seashore of Leading Industry Development for Honam Economic Region (호남광역경제권의 서남해안 풍력산업 특성)

  • Cha, In-Su;Kim, Tae-Hyung;Lee, Ki-Bong
    • Proceedings of the KIPE Conference
    • /
    • 2010.07a
    • /
    • pp.101-102
    • /
    • 2010
  • This paper represents about the characteristics of wind turbine industry of the west-south seashore of Leading Industry Development for Honam Economic Region. These projects have 8 R&D and 3 non R&D project. The period of these projects is from October 2009 to April 2012. The R&D projects are composed three bright prospect products (1) the base construction of MW off-shore wind turbine components and system with Outer-rotor type PMSG, (2) the Development of 3MW wind power system with accommodation of the west-south seashore, and (3) the development of hybrid wind turbine system with wind base construction. Also, the non-R&D projects are composed three parts with above three bright prospect products. Above two projects support the companies with characteristic of low speed wind turbine system. Other project supports the companies related to wind turbine with small and medium capacity of form 3 kW to 10kW.

  • PDF

Challenges in Structural Design of W-Project

  • Kim, Jong Soo
    • International Journal of High-Rise Buildings
    • /
    • v.3 no.3
    • /
    • pp.199-204
    • /
    • 2014
  • W-Project is 70-story mixed-use residential building complex project in Busan, the second biggest city in South Korea. As it is a high rise building complex located at the coast, the residents have great ocean view from the height. Though, there were many difficult challenges to be solved to secure structural safety and meet the serviceability requirements. As it is located on the reclaimed land, securing the foundation bearing capacity on soft soil is the first issue to be solved for the stable structure. W-Project. Busan on the way usual track of typhoon, wind load on structure is also critical for structural safety and serviceability for occupants due to wind vibration. This paper will address process of lateral load resisting structural system of W-Project.

Study on the Development of an Evaluation Index for the Local Economy Activation of Community Investment Renewable Energy Projects (대규모 주민참여형 재생에너지 사업의 지역경제 활성화 평가지표 개발 연구)

  • Im, Hyunji;Yun, Seonggwon;Yoon, Taehwan;Kim, Yunsoung
    • New & Renewable Energy
    • /
    • v.17 no.2
    • /
    • pp.9-23
    • /
    • 2021
  • In Korea, various community investment renewable project models are being implemented to increase community acceptance of renewable energy. An important factor for enhancing local acceptance is that renewable energy projects have a positive effect on revitalizing the local economy such as income increase or job creation for residents and local companies. To maximize the local economic effect of large-scale community investment renewable energy projects, this study developed an evaluation index for local economy activation, whose indicators are the local return on investment, local companies' participation, local job creation, regional cooperation, transparency, and governance. Analysis of existing evaluation indicators and current renewable projects, financial analysis, and expert interviews were used in this research. The pilot evaluation determined that, the local economic effect was high in the following order: a fund investment wind project (Gangwon), benefit-sharing wind project (Jeju), and general wind project. In particular, residents' investment amount, the number of participating residents, and the amount and transparency of the regional cooperation fund were key factors to expand the effect of local economy activation. This evaluation index could be used in public bidding for renewable energy projects such as offshore wind zoning areas of local government.

Assessment of Possible Resources and Selection of Preparatory Sites for Offshore Wind Farm around Korean Peninsula (국내 해역의 해상풍력 가능자원 평가 및 예비부지 선정)

  • Kim, Ji-Young;Kang, Keum-Seok;Oh, Ki-Yong;Lee, Jun-Shin;Ryu, Moo-Sung
    • New & Renewable Energy
    • /
    • v.5 no.2
    • /
    • pp.39-48
    • /
    • 2009
  • Recently, developing the offshore wind farm in Korean peninsula is widely understood as essential to achieve the national target for the renewable energy. As part of national plan, KEPRI (Korea electric power research institute) is performing the front running project for the offshore wind farm development that is dedicated to investigate the possible resources based on the economy considering current technological status. It also includes the selection of the first sea area among candidates and optimal design of the offshore wind farm, etc. In this paper the interim results of the project are summarized that the possible capacity for the offshore wind farm can be estimated conservatively around 18 GW regarding the wind power class, sea depth and social constraint. The five western sea areas near Taean, Gunsan, Gochang, Yeonggwang, Sinan were chosen for the candidating sites. Detailed analysis for these sites will be conducted to finalize the first-going offshore wind farm in Korea.

  • PDF

Application of Neural Network for Long-Term Correction of Wind Data

  • Vaas, Franz;Kim, Hyun-Goo
    • New & Renewable Energy
    • /
    • v.4 no.4
    • /
    • pp.23-29
    • /
    • 2008
  • Wind farm development project contains high business risks because that a wind farm, which is to be operating for 20 years, has to be designed and assessed only relying on a year or little more in-situ wind data. Accordingly, long-term correction of short-term measurement data is one of most important process in wind resource assessment for project feasibility investigation. This paper shows comparison of general Measure-Correlate-Prediction models and neural network, and presents new method using neural network for increasing prediction accuracy by accommodating multiple reference data. The proposed method would be interim step to complete long-term correction methodology for Korea, complicated Monsoon country where seasonal and diurnal variation of local meteorology is very wide.

  • PDF

IMPROVING DECISIONS IN WIND POWER SIMULATIONS USING MONTE CARLO ANALYSIS

  • Devin Hubbard;Borinara Park
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.122-128
    • /
    • 2013
  • Computer simulations designed to predict technical and financial returns of wind turbine installations are used to make informed investment decisions. These simulations used fixed values to represent real-world variables, while the actual projects can be highly uncertain, resulting in predictions that are less accurate and less useful. In this article, by modifying a popular wind power simulation sourced from the American Wind Energy Association to use Monte Carlo techniques in its calculations, the authors have proposed a way to improve simulation usability by producing probability distributions of likely outcomes, which can be used to draw broader, more useful conclusions about the simulated project.

  • PDF

prEN 1991-1-4:2021: the draft Second Generation Eurocode on wind actions on structures - A personal view

  • Francesco Ricciardelli
    • Wind and Structures
    • /
    • v.37 no.2
    • /
    • pp.79-94
    • /
    • 2023
  • This paper traces the drafting of the new EN 1991-1-4 Eurocode 1 - Actions on structures - Part 1-4: General actions - Wind actions within Mandate M/515 of the European Commission to CEN, for the evolution of structural Eurocodes towards their Second Generation. Work of the Project Team started in August 2017 and ended in April 2020, with delivery of a final draft for public enquiry. The revised document contains several modifications with respect to the existing 2005 version, and new sections were added, covering aspect not dealt with in the previous version. It has a renovated structure, with a main text limited in size and containing only fundamental material; all the remaining information, either normative or informative is arranged into thirteen annexes. Common to other Eurocode Parts, general requests from CEN were those of reducing the number of Nationally Determined Parameters and of enhancing the ease of use. More specific requests were those of (a) the drafting of a European design wind map, (b) improving wind models, (c) reviewing force and pressure coefficients, (d) reviewing the procedures for evaluation of the dynamic response, as well as (e) making editorial improvements aimed at a more user friendly document. The author had the privilege to serve as Project Team member for the drafting of the new document, and this paper brings his personal view concerning some general aspects of wind code writing, and some more specific aspects about the particular document.