Park, Sang-Hun;Lee, Ki-Seon;Lee, Sueng-Jin;Hwang, Lee-Ho;Rhee, Byong-Ho;Na, Jae-Jeong;Lee, Jung-Min
Proceedings of the Korean Society of Propulsion Engineers Conference
/
2010.11a
/
pp.537-540
/
2010
An Enhanced Huels Type Plasma Torch that generates over $5000^{\circ}C$ plasma arc flow is the core equipment of arc-jet wind tunnel. It is applied to the high-tech areas such as a new materials development and eco-friendly industry. Although the Enhanced Huels Type Plasma Torch produce uniform flow of high purity, its complicated structure and operating condition makes the commercialization of it to be difficult. The 400kW arc-jet generator using the enhanced Huels type plasma torch was tested. The result of this study showed that the torch was operated in the range of 280~320 A and 250~1350 V.
Magnetic Suspension and Balance System (MSBS) demonstrates the capacity to levitate an experimental model absent any mechanical contact using magnetic forces and moments. It allows precise control of position and attitude of the model, and measures external forces and moments acting on the model. For the purpose of acquisition of reliable experimental results under stable and safe conditions, the performance and robustness of the position and attitude control system of MSBS needs to be improved. To this end, Iterative Feedback Tuning (IFT) and L1 adaptive output feedback algorithm were employed to automatically increase command following performance and to ensure robust operation of MSBS with failure of electric power supply. The applicability was validated using computational simulation.
Jung, Woo Sik;Lee, Hye Rin;Kim, Jae-Ryang;Lee, Gee Man
Nuclear Engineering and Technology
/
v.52
no.10
/
pp.2221-2229
/
2020
After the Fukushima Daiichi nuclear power plant (NPP) accident, level 3 probabilistic safety assessment (PSA) has emerged as an important task in order to assess the risk level of the multi-unit NPPs in a single nuclear site. Accurate calculation of the radionuclide concentrations and exposure doses to the public is required if a nuclear site has multi-unit NPPs and large number of people live near NPPs. So, there has been a great need to develop a new method or procedure for the fast and accurate offsite consequence calculation for the multi-unit NPP accident analysis. Since the multi-unit level 3 PSA is being currently performed assuming that all the NPPs are located at the same position such as a center of mass (COM) or base NPP position, radionuclide concentrations or exposure doses near NPPs can be drastically distorted depending on the locations, multi-unit NPP alignment, and the wind direction. In order to overcome this disadvantage of the COM method, the idea of a new multiple location (ML) method was proposed and implemented into a new tool MURCC (multi-unit radiological consequence calculator). Furthermore, the MURCC code was further improved for the multi-unit level 3 PSA that has the arbitrary number of multi-unit NPPs. The objectives of this study are to (1) qualitatively and quantitatively compare COM and ML methods, and (2) demonstrate the strength and efficiency of the ML method. The strength of the ML method was demonstrated by the applications to the multi-unit long-term station blackout (LTSBO) accidents at the four-unit Vogtle NPPs. Thus, it is strongly recommended that this ML method be employed for the offsite consequence analysis of the multi-unit NPP accidents.
Journal of the Society of Naval Architects of Korea
/
v.54
no.2
/
pp.102-112
/
2017
Many studies on dynamic positioning control algorithms using fixed feedback gains have been carried out to improve station keeping performance of dynamically positioned vessels. However, the control algorithms have disadvantages in that it can not cope with changes in environmental disturbances and response characteristics of vessels motion in real time. In this paper, the Fuzzy Gain Scheduling - PID(FGS - PID) control algorithm that can tune PID gains in real time was proposed. The FGS - PID controller that consists of fuzzy system and a PID controller uses weighted values of PID gains from fuzzy system and fixed PID gains from Ziegler - Nichols method to tune final PID gains in real time. Firstly, FGS - PID controller, control allocation algorithm, FPSO and environmental disturbances were modeled using Matlab/Simulink to evaluate station keeping performance of the proposed control algorithm. In addition, simulations that keep positions and a heading angle of vessel with wind, wave, current disturbances were carried out. From simulation results, the FGS - PID controller was confirmed to have better performances of keeping positions and a heading angle and consuming power than those of the PID controller. As a consequence, the proposed FGS - PID controller in this paper was validated to have more effectiveness to keep position and heading angle than that of PID controller.
Journal of Korean Institute of Industrial Engineers
/
v.40
no.2
/
pp.223-232
/
2014
Life-cycle assessment (LCA) is often employed to quantify the environmental impact of a product in a comprehensive manner. The aspects of performance and usability as well as that of eco-friendliness should be considered in an integrated manner for the market competitiveness of an eco-friendly product. The present study developed a product improvement plan for an eco-friendly electric heater by benchmarking two small-size electric heaters (companies 'H' and 'T') in terms of performance, usability, and eco-friendliness. The performance measurements such as temperature, humidity, wind speed, noise, and power consumption were collected while the two heaters were operated in a laboratory setting. Then, the usability evaluations such as aesthetics, operation satisfaction, performance satisfaction, and overall satisfaction were surveyed for the two heaters using a 5-point scale (1 for very unsatisfied and 5 for very satisfied). Lastly, the LCA analysis was conducted by following the six-step process of eco-friendly product design provided by KEITI. The analysis results of the two products being integrated with the aspects of product, service, and user, four design improvement directions such as eco-efficient, smart, modularized, and user-support were recommended for an eco-friendly electric heater. These proposed concepts would be useful to develop an eco-friendly electric heater design with a high level of market competitiveness.
Since Paris Climate Change Conference in 2015, many policies to reduce the emission of greenhouse gas have been accelerating, which are mainly related to renewable energy resources and micro-grid. Presently, the technology development and demonstration projects are mostly focused on diversifying the power resources by adding wind turbine, photo-voltaic and battery storage system in the island-type small micro-grid. It is expected that the large-scaled micro-grid projects based on the regional district and town/complex city, e.g. the block type micro-grid project in Daegu national industrial complex will proceed in the near future. In this case, the economic cost or the carbon emission can be optimized by the efficient operation of energy mix and the appropriate construction of electric and heat supplying facilities such as cogeneration, renewable energy resources, BESS, thermal storage and the existing heat and electricity supplying networks. However, when planning a large residential town or city, the concrete plan of the energy infrastructure has not been established until the construction plan stage and provided by the individual energy suppliers of water, heat, electricity and gas. So, it is difficult to build the efficient energy portfolio considering the characteristics of town or city. This paper introduces an energy mix optimization(EMO) method to determine the optimal capacity of thermal and electric resources which can be applied in the design stage of the real large-scaled residential town or city, and examines the feasibility of the proposed method by applying the real heat and electricity demand data of large-scale residential towns with thousands of households and by comparing the result of HOMER simulation developed by National Renewable Energy Laboratory(NREL).
Kang Min-Kwan;Park Jae-Ho;Oh Yong-Taek;Hong Sang-Eun;Rho Dae-Seok
Journal of the Korea Academia-Industrial cooperation Society
/
v.7
no.1
/
pp.12-20
/
2006
Recently, new dispersed sources (DSG) such as Photovoltaic, Wind Power, fuel cell etc. are interconnected with distribution systems as national projects for alternative energy preparing for oil crisis. This paper deals with the optimal evaluation algorithms in the case where new dispersed sources are operated in distribution systems. It is very difficult and complicated to handle the interconnection issues for proper voltage managements, because professional skills and enormous amounts of data for the evaluations are required. The typical evaluation algorithms mainly depending on individual ability and quality of data acquired, inevitably cause the different results f3r the same issue, so unfair and subjective evaluations are unavoidable. In order to overcome these problems, this paper proposes reasonable and general algorithms based on the standard model system and proper criterion, which offers the fair and objective evaluations in any case.
Journal of the Korea Academia-Industrial cooperation Society
/
v.9
no.6
/
pp.1599-1606
/
2008
Recently, new dispersed generation systems such as photovoltaic, wind power, fuel cell etc. are energetically interconnected and operated in the distribution systems, as one of the national projects for alternative energy with the provision against oil crisis. The technical guidelines on the interconnection of dispersed generation systems have been established and conducted positively. However, protection devices (Re-closer) in primary feeder of distribution system interconnected with photovoltaic generation may cause problems with mis-operation, and then many customers could have problems like an interruption. So, this paper presents the optimal method to minimize the impact of interruption, using both the symmetric method and MATLAB/SIMULINK. And, also this paper shows the effectiveness of proposed method by simulating at the real distribution systems.
1970년 초에 배럴당 1불하던 원유가가 지금은 120불을 상회하고 있다. 더욱 놀라운 것은 3년 전만 하더라도 40불 이하 수준이던 것이 불과 몇 년 사이에 3배 이상 급등해 버린 것이다. 우리는 아직 유가 100불 이상의 고유가 시대에 대한 고통을 실감하지 못하고 있지만, 빠른 시일 안에 대항한 형태로 우리를 불편하게 하고, 더가서는 사회 경제 문화 등 모든 우리의 활동패턴에 근본적 변화를 일으킬 것이라는데는 어느 누구도 이의를 달지 못할 것이다. 한편 90년대만 하더라도 친환경 건축기술은 선택적 사양으로 인식되어 왔으며, 일부 고급건물 또는 데모성격의 건물에만 반영되던 미래의 기술 분야로 간주되어왔다. 하지만 10년 남짓 지난 지금 우리 주변에서 가장 흔하게 접할 수 있는 용어 중의 하나가 친환경, 지속가능, 그린, 에코 등 이며, 최근 많은 건설사가 고민하고 있는 가장 중요한 이슈가 친환경 건축 관련 기술이 되어버렸다. 최근 유가의 급등세 보다는 더디다 할 지라도 몇 년 사이에 벌어지고 있는 제도적, 사회 경제적 변화 동향을 돌이켜 볼 때 건축계 또한 매우 빠른 속도로 변해가고 있으며, 부지불시간에 유가등급과 같이 변화된 환경에 놀라는 시기가 곧 도래할 것이다. 오랜 기간 에너지 및 친환경 관련 요소기술의 개발, 정부의 지원제도 확대, 보급 강화 등 각종 노력을 통해 이제는 건축 설계분야에서도 친환경건축물에 대한 저변이 크게 확대되었다고 볼 수 있다. 하지만 실상 우리주변에서 제대로된 친환경 건축물을 실제로 보고자 한다면 두손으로 꼽기도 힘들 정도인 사실에 놀라게 될 것이다. 이러한 배경하에 이번 연재에서는 그동안 오랜기간 떠들고 노력했음에도 불구하고 실제 제대로된 친환경 건축물을 우리 주변에서 찾기 힘든 이유를 건축실무자 측면에서 재고해 보고, 이에 대한 새로운 해결방안을 모색해 보는 계기를 갖고자 한다. 특히 많은 친환경 건축기술 중 최근 선진국을 중심으로 가장 큰 이슈가 되어 있고, 또한 건축사 입장에서 쉽게 접근하기 어려운 기술분야인 신재생에너지 건축응용 측면에서 다양한 최신 기술 및 실질적 접근방법과 사례를 주제별로 제시하고자 한다.
Journal of the Korea Academia-Industrial cooperation Society
/
v.16
no.9
/
pp.6411-6418
/
2015
To respond the climate change and environmental pollution, the studies on renewable energy policies are increasing. The renewable energy is a new growth engine technology represented by the green industry and green technology. At present, the investments for the renewable energy supply and technology development projects of three main strategy sectors such as sunlight, wind power and hydrogen fuel cell are implemented in our country, while they are still in the early stage, accordingly reducing those uncertainty for the research direction and investment fields is the most urgent issue among others. Thus, this study applied text mining method and multinominal topic model among the big data analysis methods on our country's newspaper articles concerning the renewable energy over the last 10 years, and then analyzed the core issues and global research trend, forecasting the renewable energy fields with the growth potential. It is predicted that these results of the study based on information and communication technology will be actively applied on the renewable energy fields.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.