• 제목/요약/키워드: Wind Farm

검색결과 535건 처리시간 0.031초

Development of an Adaptive Overcurrent Relaying Algorithm for Distribution Networks Embedding a Large Scaled Wind Farm

  • Jang, Sung-Il;Kim, Ji-Won;Kim, Kwang-Ho
    • KIEE International Transactions on Power Engineering
    • /
    • 제3A권4호
    • /
    • pp.198-205
    • /
    • 2003
  • This paper proposes the adaptive relaying of protective devices applied in the neighboring distribution feeders for reliable and efficient operations of a wind farm interconnected with distribution networks by dedicated lines. A wind farm connected to an electric power network is one of the greatest alternative energy sources. However, the wind turbine generators are influenced by abnormal grid conditions such as disturbances occurring in the neighboring distribution feeders as well as the dedicated power. Particularly, in cases of a fault happening in the neighboring distribution feeders, a wind farm might be accelerated until protective devices clear the fault. Therefore, the delayed operation time of protective devices for satisfying the coordination might overly expose the interconnected wind turbine generators to the fault and cause damage to them. This paper describes the proper delayed operation time of protective relay satisfying the coordination of the distribution networks as well as reducing damage on the interconnected wind farm. The simulation results for the Hoenggye substation model composed of five feeders and one dedicated line using PSCAD/EMTDC showed that the proper delayed time of protective devices reflecting the fault condition and the power output of the wind farm could improve the operational reliability, efficiency, and stability of the wind farm.

최소자승몬테카를로 시뮬레이션을 이용한 풍력발전설비 투자계획 (Economic Assessment of a Wind Farm Project Using Least Square Monte-Carlo (LSMC) Simulation)

  • 김진아;이종욱;이재희;주성관
    • 전기학회논문지
    • /
    • 제60권1호
    • /
    • pp.32-35
    • /
    • 2011
  • The economic value of a wind farm project is influenced by various risk factors such as wind power output and electricity market price. In particular, there is uncertainty in the economic evaluation of a wind farm project due to uncertain wind power outputs, which are fluctuated by weather factors such as wind speed, and volatile electricity market prices. This paper presents a systematic method to assess the economic value and payback period of a wind farm project using Least Square Monte-Carlo (LSMC) simulation. Numerical example is presented to validate the effectiveness of the proposed economic assessment method for a wind farm project.

A numerical simulation of flow field in a wind farm on complex terrain

  • Lee, Myungsung;Lee, Seung Ho;Hur, Nahmkeon;Choi, Chang-Koon
    • Wind and Structures
    • /
    • 제13권4호
    • /
    • pp.375-383
    • /
    • 2010
  • A three-dimensional flow simulation was performed to investigate the wind flow around wind-power generation facilities on mountainous area of complex terrain. A digital map of eastern mountainous area of Korea including a wind farm was used to model actual complex terrain. Rotating wind turbines in the wind farm were also modeled in the computational domain with detailed geometry of blade by using the frozen rotor method. Wind direction and speed to be used as a boundary condition were taken from local meteorological reports. The numerical results showed not only details of flow distribution in the wind farm but also the variation in the performance of the wind turbines due to the installed location of the turbines on complex terrain. The wake effect of the upstream turbine on the performance of the downstream one was also examined. The methodology presented in this study may be used in selecting future wind farm site and wind turbine locations in the selected site for possible maximum power generation.

복잡지형에서 난류강도를 고려한 풍력발전단지설계 (Wind Farm Design Considering Turbulence Intensity on Complex Terrain)

  • 박미호;고경남;허종철
    • 한국태양에너지학회 논문집
    • /
    • 제33권6호
    • /
    • pp.1-11
    • /
    • 2013
  • The investigation on wind farm design using CFD technique was carried out to reduce turbulence intensity in a wind farm. A potential wind farm in Gasiri of Jeju Island was selected for the design and the commercial S/W of Meteodyn WT was used for applying CFD technique. The initial layout of wind turbines was derived using WindPRO which is mainly used for wind farm design in Korea. Then, the distribution of turbulence intensity on complex terrain was calculated and visible by Meteodyn WT. Based on the distribution, wind turbines were positioned properly. As a result, wind turbines could be deployed at positions with minimum turbulence intensity as well as maximum Annual Energy Production, AEP, using Meteodyn WT. It is necessary to take into account turbulence intensity in wind farm design to avoid wind turbine failure.

새만금 가력도 풍력발전단지에 대한 연간발전량 예측 및 검증 (Prediction and Validation of Annual Energy Production of Garyeok-do Wind Farm in Saemangeum Area)

  • 김형원;송원;백인수
    • 풍력에너지저널
    • /
    • 제9권4호
    • /
    • pp.32-39
    • /
    • 2018
  • In this study, the annual power production of a wind farm according to obstacles and wind data was predicted for the Garyeok-do wind farm in the Saemangeum area. The Saemangeum Garyeok-do wind farm was built in December 2014 by the Korea Rural Community Corporation. Currently, two 1.5 MW wind turbines manufactured by Hyundai Heavy Industries are installed and operated. Automatic weather station data from 2015 to 2017 was used as wind data to predict the annual power production of the wind farm for three consecutive years. For prediction, a commercial computational fluid dynamics tool known to be suitable for wind energy prediction in complex terrain was used. Predictions were made for three cases with or without considering obstacles and wind direction errors. The study found that by considering both obstacles and wind direction errors, prediction errors could be substantially reduced. The prediction errors were within 2.5 % or less for all three years.

해상 풍력발전단지 조성에 따른 레이더 전파간섭 저감 기술동향 (Technical Trend of Radar Radio Interference Reduction Relating to Construction of the Offshore Wind Farm)

  • 김영달;정윤미;이대동
    • 한국전기전자재료학회논문지
    • /
    • 제27권4호
    • /
    • pp.250-256
    • /
    • 2014
  • The wind power generation is an eco-friendly clean energy that produces almost zero $CO_2$ emission, and has a good economic feasibility. As for the location, the installation of large turbines and construction of large-scale wind farm is easier on the offshore than on the land. In Korea, it is inevitable to generate offshore wind power through the offshore wind farm, and the radio interference of larger wind power generators and offshore wind power farm to broadcasting, communication and radars is becoming a core issue for constructing the offshore wind farm. In this study, the wind power generation status and rotor blade technology trend were presented, along with the technical trend of radar radio interference reduction relating to construction of the offshore wind farm.

풍력 발전단지의 출력 지령값을 고려한 계통 연계 운영 방안 (A New Control Scheme of Wind Farm Considering P,Q References)

  • 최정현;박진우;문승일
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2008년도 제39회 하계학술대회
    • /
    • pp.1172-1173
    • /
    • 2008
  • At the moment, the control ability of wind farms is a prime research concern for the grid integration of large wind farms, due to their required active role in the power system. As more wind turbines are installed, the power from wind energy will start to replace conventional generation units and its influence on power systems cannot be neglected. Besides, because of the intermittent nature of wind the output power of wind turbines fluctuates according to wind speed variation. Especially an isolated power system with small capacity such like Jeju needs more systematic solutions and regulations(grid code). This paper presents the idea of approach for centralized operating wind farm strategy to regulate the wind farm power production to the reference power ordered by the system operator. The doubly fed induction generator(DFIG) can control active and reactive power in feasible range. So wind farm comprised of DFIG has the possibility of a controllable component in the power system. The presented wind farm control has a hierarchical structure with both a wind farm control level and a wind turbine control level.

  • PDF

Comparative evaluation of different offshore wind turbine installation vessels for Korean west-south wind farm

  • Ahn, Dang;Shin, Sung-chul;Kim, Soo-young;Kharoufi, Hicham;Kim, Hyun-cheol
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • 제9권1호
    • /
    • pp.45-54
    • /
    • 2017
  • The purpose of this study is to evaluate various means of wind power turbines installation in the Korean west-south wind farm (Test bed 100 MW, Demonstrate site 400 MW). We presented the marine environment of the southwest offshore wind farm in order to decide the appropriate installation vessel to be used in this site. The various vessels would be WTIV (Wind turbine installation vessel), jack-up barge, or floating crane ${\cdots}$ etc. We analyzed the installation cost of offshore wind turbine and the transportation duration for each vessel. The analysis results showed the most suitable installation means for offshore wind turbine in the Korean west-south wind farm.

풍력발전단지 보호를 위한 내외부 고장 판별 알고리즘 (A Protection Algorithm Discriminating Between Internal and External Faults for Wind Farms)

  • 권영진;강상희
    • 전기학회논문지
    • /
    • 제56권5호
    • /
    • pp.854-859
    • /
    • 2007
  • A wind farm consists of many wind generator(WG)s therefore, it is generally a complex power system. A wind farm as a distributed generation(DG) affects utility power system. If a conventional protection schemes are applied, it is difficult to detect faults correctly and the schemes can't provide proper coordination in some cases. This paper presents a protection algorithm for a wind farm which consists of a looped collection circuit. Because the proposed algorithm can distinguish between an internal fault and an external fault in a wind farm, The proposed algorithm can disconnect the faulted section in a wind farm. This algorithm is based on an overcurrent protection technique with the change of the ratio of the output current of a generator to the current of the looped line connected to each generator to collect the each generator's power. In addition, operating time of the algorithm is shortened by using the voltage drop at a generator collection point. The performance of the proposed algorithm was verified under various fault conditions using PSCAD/EMTDC simulations.

다중 배제분석을 이용한 강원도 내 풍력발전단지 유망후보지 선정 (The Selection of Promising Wind Farm Sites in Gangwon Province using Multi Exclusion Analysis)

  • 박웅식;유능수;김진한;김관수;민덕호;이상우;백인수;김현구
    • 한국태양에너지학회 논문집
    • /
    • 제35권2호
    • /
    • pp.1-10
    • /
    • 2015
  • Promising onshore wind farm sites in Gangwon province of Korea were investigated in this study. Gangwon province was divided into twenty five simulation regions and a commercial program based on Reynolds averaged Navier-Stokes equation was used to find out wind resource maps of the regions. The national wind atlas with a period 2007-2009 developed by Korea institute of energy research was used as climatologies. The wind resource maps were combined to construct a wind resource map of Gangwon province with a horizontal spatial resolution of 100m. In addition to the wind resource, national environmental zoning map, distance from substation, residence and automobile road, Beakdudaegan mountain range, terrain slope, airport and military reservation district were considered to find out promising wind farm sites. A commercial wind farm design program was used to find out developable wind farm capacities in promising wind farm site with and without excluding environmental protection regions. The total wind farm capacities with and without excluding the protection regions were estimated to be 46MW and 598MW, respectively, when a 2MW commercial wind turbine was employed.