• 제목/요약/키워드: Wide-area blackout

검색결과 23건 처리시간 0.02초

대정전 계통 복구를 위한 시송전 선로에 관한 연구 (A Study on transmission lines energized initially to restore wide black out Power system)

  • 이흥재;김균도;박성민;배주천;황봉환;홍순천;김기동;이남호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 하계학술대회 논문집 A
    • /
    • pp.377-379
    • /
    • 2001
  • When a wide area blackout occurres, reenergizing transmission lines should be done at first. The KEPCO(Korea Electric Power Corporation) divides whole power system grid into seven subsystem, and each subsystem has one of two blackstart power plants which are usually hydro or combined-combustion type, one priority power plant which should be first supplied with electric energy, and transmission lines between them. Voltage rising, line charging, and operation stability problem should be considered when these lines are reenergized. In this paper, building-up process for primary transmission system that should be energized at first is analyzed.

  • PDF

전압 변동률을 고려한 수도권 전압 안정화 다단계 부하차단 적용 방안 (Multi-level UnderVoltage Load Shedding Scheme Considering Rate of Change of Voltage for Voltage Stability)

  • 이윤환;김태균;김지훈;이병준;강부일;조종만
    • 전기학회논문지
    • /
    • 제58권12호
    • /
    • pp.2335-2341
    • /
    • 2009
  • High technique growth of modem times and high industrial facility in consequence of buildings demand for electric power of an extensive scale with stability supply and maintenance of high quality. But, power system always have risk of network contingency. When power system break out disturbance, it circumstantially happen like uncontrolled loss of load developing from of cascading. Severely which would be raised wide area blackout, plan to prevent, which make stability through a little of load shedding and multi-level UnderVoltageLoadShdding should work. This paper presents target, sensitivity of bus voltage have choose appropriating load shedding location and load shedding decision making logic with considering rate of change of voltage have studied multi-level under voltage load shedding scheme. Calculation of rate of change of voltage applied method of least square. As a result, we are studied an dynamic analysis of 2008 summer peak data. We have been known that network analysis is a little development and developing UnderVoltageLoadShedding scheme.

PSCADI/EMTDC를 이용한 시송전계통의 고조파 공진현상 분석 II (Analysis of the Harmonic Resonance of Primary Restorative Transmission System Using PSCAD/EMTDC PART II)

  • 이흥재;유원근;이경섭;박성민
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2004년도 하계학술대회 논문집 A
    • /
    • pp.48-50
    • /
    • 2004
  • The energization of high voltage transmission lines and transformers, that is an inevitable process in most countries as the first restorative action for wide-area blackout, may induce overvoltages such as sustained overvoltage, transient overvoltage and harmonic resonant overvoltage. And these may cause damages to power system equipments or failure of surge arresters. The harmonic resonant overvoltage originates in switching operations and nonlinear characteristics of equipments. Actually it is difficult to predict the occurrence of harmonic overvoltage, since they result from nonlinear characteristics of transformers and other equipments. This paper describes the analysis of domestic primary restorative transmission system using PSCAD/EMTDC. The harmonic resonance is verified and the solution to prevent harmonic resonance is proposed in this paper. As a result, the PSCAD/EMTBC simulation showed slightly conflictive results that had been presented by IEEE Power System Restoration Working Group report.

  • PDF