• Title/Summary/Keyword: Wide area railway

Search Result 33, Processing Time 0.016 seconds

A Study on the Determination of Indicators for the Risk Assessment of Ground Depression Using SAR Imageson (SAR 영상을 활용한 지반침하의 위험평가를 위한 지표결정에 대한 연구)

  • Lee, Hyojin;Yoon, Hongsic;Han, Hak
    • Journal of the Korean GEO-environmental Society
    • /
    • v.22 no.7
    • /
    • pp.13-20
    • /
    • 2021
  • The problem of subsidence of the roadbed near the Honam High Speed Railway, which opened in April 2015, continues to be raised, and the ground stability of the area near the Honam High Speed Railway may also be problematic. It is very important to select the factors that determine the indicators and indicators in producing the risk maps. Existing risk indicators are calculated as the final displacement volume based on the last observed date of the observed period, and time-series indicator displacement must be identified to analyze the cause of subsidence and the behavior of the indicator. Furthermore, for a wide range of regions, it is economically inefficient to conduct direct level measurements, so we wanted to observe surface displacement using SAR images. In this paper, time series indicator displacement was observed using PS-InSAR techniques, and risk was compared by rating each factor using the difference between final indicator displacement, cumulative indicator displacement, minimum displacement and maximum displacement as factors for determining risk indicators. As a result, the risk rating of the final displacement is different from that of each factor, and we propose adding factors from different perspectives in determining risk indicators. It is expected to be an important study in finding the cause of ground subsidence and finding solutions.

Impact of Large-scale Transportation Infrastructure Plan on the Housing Markets -Focus on GTX, Housing Consumer Confidence Index and Sales Prices- (광역교통시설 건설계획이 주택시장에 미치는 영향 -수도권 광역급행철도, 주택소비심리지수 및 실거래가 분석을 중심으로-)

  • Choi, Ui-Jin;Kim, Jung-Hwa
    • Journal of Digital Convergence
    • /
    • v.19 no.9
    • /
    • pp.9-18
    • /
    • 2021
  • Constructing the Metropolitan Railway Express (the GTX) may have an impact on consumer confidence and housing sales price located near the planned route. This study looked at how consumers' psychology and housing prices change as the large-scale transport infrastructure plane was planned. Also, it looked at the relationship between consumer sentiment and housing prices to analyze the impact of new transportation facilities inflows. Using a correlation analysis, the relationship between the consumer sentiment index and the actual transaction price of apartments was identified. The impact of GTX on the consumer sentiment index and the actual transaction price of apartments was looked at using the Difference-in-Differences methodology. Our finding shows that the construction plan of a large-scale transportation infrastructure in the metropolitan area affects the sentiment of housing consumption and actual transactions. In a situation where the government is speeding up the construction of a wide-area transportation network such as GTX with the goal of becoming a city where people can commute to downtown Seoul within 30 minutes, policies that can stabilize the housing market in transportation hubs should be suggested.

A Development of Optimum Operation Models for Express-Rail Systems (급행열차 도입을 통한 최적운행방안 수립에 관한 연구 - 수도권 광역 도시철도를 중심으로 -)

  • Park, Jeong-Soo;Lee, Hoon-Hee;Won, Jai-Mu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.4D
    • /
    • pp.679-686
    • /
    • 2006
  • Recently, the city railway in the Seoul Metropolitan Area (SMA) has offered a low quality of service as a passage time, because it was operated slowly. So, the people who live in modern society are not satisfied about passage time, therefore, this study tried to make that the subway in the SMA becomes a more functional and effective wide-area-transportation-network through an express train introduction's method which examined cases from abroad and current system. and then presented how express train could be applied to current system. In a case study, We used the An-San Line and Su-In Line as a examples and developed a schedule which can minimize the delaying time of subway by using Branch & Bound Algorithm. The train operational plan was loaded to consider a railroad siding, Obtained site, and the dispatch interval(three to ten minutes) for the express and local lines and finally, We presented an alternative operational plan which made by those factors.