• Title/Summary/Keyword: Wide Area Blackout

Search Result 23, Processing Time 0.017 seconds

A Study on transmission lines energized initially to restore wide black out Power system (대정전 계통 복구를 위한 시송전 선로에 관한 연구)

  • Lee, H.J.;Kim, G.D.;Park, S.M.;Bae, J.C.;Hwang, B.H.;Hong, S.C.;Kim, K.D.;Lee, N.H.
    • Proceedings of the KIEE Conference
    • /
    • 2001.07a
    • /
    • pp.377-379
    • /
    • 2001
  • When a wide area blackout occurres, reenergizing transmission lines should be done at first. The KEPCO(Korea Electric Power Corporation) divides whole power system grid into seven subsystem, and each subsystem has one of two blackstart power plants which are usually hydro or combined-combustion type, one priority power plant which should be first supplied with electric energy, and transmission lines between them. Voltage rising, line charging, and operation stability problem should be considered when these lines are reenergized. In this paper, building-up process for primary transmission system that should be energized at first is analyzed.

  • PDF

Multi-level UnderVoltage Load Shedding Scheme Considering Rate of Change of Voltage for Voltage Stability (전압 변동률을 고려한 수도권 전압 안정화 다단계 부하차단 적용 방안)

  • Lee, Yun-Hwan;Kim, Tae-Gyun;Kim, Ji-Hun;Lee, Byong-Jun;Kang, Bu-Il;Cho, Jong-Man
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.58 no.12
    • /
    • pp.2335-2341
    • /
    • 2009
  • High technique growth of modem times and high industrial facility in consequence of buildings demand for electric power of an extensive scale with stability supply and maintenance of high quality. But, power system always have risk of network contingency. When power system break out disturbance, it circumstantially happen like uncontrolled loss of load developing from of cascading. Severely which would be raised wide area blackout, plan to prevent, which make stability through a little of load shedding and multi-level UnderVoltageLoadShdding should work. This paper presents target, sensitivity of bus voltage have choose appropriating load shedding location and load shedding decision making logic with considering rate of change of voltage have studied multi-level under voltage load shedding scheme. Calculation of rate of change of voltage applied method of least square. As a result, we are studied an dynamic analysis of 2008 summer peak data. We have been known that network analysis is a little development and developing UnderVoltageLoadShedding scheme.

Analysis of the Harmonic Resonance of Primary Restorative Transmission System Using PSCAD/EMTDC PART II (PSCADI/EMTDC를 이용한 시송전계통의 고조파 공진현상 분석 II)

  • Lee H. J.;Yoo W. K.;Lee K. S.;Park S. M.
    • Proceedings of the KIEE Conference
    • /
    • summer
    • /
    • pp.48-50
    • /
    • 2004
  • The energization of high voltage transmission lines and transformers, that is an inevitable process in most countries as the first restorative action for wide-area blackout, may induce overvoltages such as sustained overvoltage, transient overvoltage and harmonic resonant overvoltage. And these may cause damages to power system equipments or failure of surge arresters. The harmonic resonant overvoltage originates in switching operations and nonlinear characteristics of equipments. Actually it is difficult to predict the occurrence of harmonic overvoltage, since they result from nonlinear characteristics of transformers and other equipments. This paper describes the analysis of domestic primary restorative transmission system using PSCAD/EMTDC. The harmonic resonance is verified and the solution to prevent harmonic resonance is proposed in this paper. As a result, the PSCAD/EMTBC simulation showed slightly conflictive results that had been presented by IEEE Power System Restoration Working Group report.

  • PDF