• Title/Summary/Keyword: Western offshore of Korea

Search Result 74, Processing Time 0.021 seconds

Wind Resource Assessment on the Western Offshore of Korea Using MERRA Reanalysis Data (MERRA 재해석자료를 이용한 서해상 풍력자원평가)

  • Kim, Hyun-Goo;Jang, Moon-Seok;Ryu, Ki-Wahn
    • Journal of Wind Energy
    • /
    • v.4 no.1
    • /
    • pp.39-45
    • /
    • 2013
  • Massive offshore wind projects of have recently been driven in full gear on the Western Offshore of Korea including the 2.5 GW West-Southern Offshore Wind Project of the Ministry of Trade, Industry and Energy, and the 5 GW Offshore Wind Project of the Jeollanamdo Provincial Government. On this timely occasion, this study performed a general wind resource assessment on the Western Offshore by using the MERRA reanalysis data of temporal-spatial resolution and accuracy greatly improved comparing to conventional reanalysis data. It is hard to consider that wind resources on the Western Sea are excellent, since analysis results indicated the average wind speed of 6.29 ± 0.39 m/s at 50 m above sea level, and average wind power density of 307 ± 53 W/m2. Therefore, it is considered that activities shall be performed for guarantee economic profits from factor other than wind resources when developing an offshore wind project on the Western Offshore.

Technical considerations for engineering of crane pedestal operated in North-Western Australia Offshore (North-Western Australia 해상에 운용되는 Offshore Crane Pedestal 설계)

  • Song, Jun-Ho;Kim, Yong-Woon;LEE, Kyung-Seok;Kim, Man-Soo
    • Special Issue of the Society of Naval Architects of Korea
    • /
    • 2015.09a
    • /
    • pp.34-40
    • /
    • 2015
  • The design, procurement and fabrication of FPSO project ordered by Inpex Browse, Ltd. have been currently carried out by DSME(Daewoo Shipbuilding Marine and Engineering Co.). The unit will be installed and operated in the Ichthys field offshore of North-Western Australia and there are the particular design requirements to do with performance on the environment loads corresponding to max. 10,000 years return period wave. Also, the operational life of FPSO has to be over 40 years. With this background, this paper introduces the structural design procedure of crane pedestal foundation operated in north-western Australia offshore. The design of crane pedestal foundation structure is basically based on international design code (i.e. API Spec. 2C), Classification society's rule and project specifications. The design load cases are mainly divided into the crane normal operating conditions and crane stowed conditions according to environment conditions of the offshore with 1-year, 5-year, 10-year, 200-year and 10,000-year return period wave. This design experience for crane pedestal foundation operated in north-western Australia offshore will be useful to do engineering of other offshore crane structures.

  • PDF

Design and analysis of offshore wind structure

  • Young-Suk You;Min-Young Sun;Young-Ho Lee
    • Advances in Computational Design
    • /
    • v.8 no.3
    • /
    • pp.191-217
    • /
    • 2023
  • The objective of this study was to evaluate the foundation structure of a 3.6-MW wind turbine generator (WTG) installed offshore in Western Korea. The ultimate limit state (ULS) and fatigue limit state (FLS) of the multi-pile steel foundation (MSF) installed at the Saemangeum offshore wind farm were structurally investigated using the finite element (FE) software, ANSYS Workbench 19.0. According to the ULS analysis, no plastic deformation was found in any of the components constituting the substructure. At the same time, the maximal stress value reached the calculation limit of 335 MPa. According to the FLS results, the stress concentration factor (SCF) ranged from 1.00 to 1.88 in all components. The results of this study can be applied to determine the optimal design for MSFs.

Assessment of Possible Resources and Selection of Preparatory Sites for Offshore Wind Farm around Korean Peninsula (국내 해역의 해상풍력 가능자원 평가 및 예비부지 선정)

  • Kim, Ji-Young;Kang, Keum-Seok;Oh, Ki-Yong;Lee, Jun-Shin;Ryu, Moo-Sung
    • New & Renewable Energy
    • /
    • v.5 no.2
    • /
    • pp.39-48
    • /
    • 2009
  • Recently, developing the offshore wind farm in Korean peninsula is widely understood as essential to achieve the national target for the renewable energy. As part of national plan, KEPRI (Korea electric power research institute) is performing the front running project for the offshore wind farm development that is dedicated to investigate the possible resources based on the economy considering current technological status. It also includes the selection of the first sea area among candidates and optimal design of the offshore wind farm, etc. In this paper the interim results of the project are summarized that the possible capacity for the offshore wind farm can be estimated conservatively around 18 GW regarding the wind power class, sea depth and social constraint. The five western sea areas near Taean, Gunsan, Gochang, Yeonggwang, Sinan were chosen for the candidating sites. Detailed analysis for these sites will be conducted to finalize the first-going offshore wind farm in Korea.

  • PDF

A Study on the Application of Skirt Plates on Jacket Support Structures of Offshore Wind Turbines

  • Choi, Byeong-Ryoel;Choi, Han-Sik;Jo, Hyo-Jae;Lee, Sang-Hyep;Park, Young-Ho
    • Journal of Advanced Research in Ocean Engineering
    • /
    • v.4 no.2
    • /
    • pp.47-52
    • /
    • 2018
  • The Korea Offshore Wind Power (KOWP) is planning to construct offshore wind energy farms with an overall rated power of 2.5 GW in the south-western coast of the country until 2019. Various types of support structures for offshore wind turbines have been proposed in the past. Nevertheless, in South Korea, jacket structures have in general, been applied as support structures for offshore wind turbines owing to the many accumulated experiences and know-how regarding this kind of support structure. The choice of offshore structure is mainly influenced by site conditions such as seabed soil type and sea environment during installation. In installing jacket sets on the seabed, the mudmat is necessary to maintain the equilibrium of the jacket without the aid of additional devices. Hence, this study proposes the installation of skirt plates underneath the bottom frame of jackets in order to improve the installation stability of jacket structures under rougher sea conditions. To confirm the effect of skirt plates, installation stability analyses considering overturning, sliding and bearing capacity have been performed. From the results, it is shown that jacket structures with skirt plates can contribute to improving the sliding stability of the structures of new wind power farms, while providing economic benefits.

Strategy for Domestic Offshore Wind Power Development based on the Analysis of Natural Resources and Technology Level (부존량 및 기술수준 분석을 통한 국내 해상풍력 추진전략)

  • Ryu, Moo-Sung;Kang, Keum-Seok;Lee, Jun-Shin;Kim, Ji-Young
    • New & Renewable Energy
    • /
    • v.6 no.1
    • /
    • pp.20-28
    • /
    • 2010
  • Developing the offshore wind farm is essential to meet the national target of the renewable energy and to achieve the green growth in Korea. In this context, KEPRI is now carrying the feasibility study for introducing the offshore wind fam in Korea. Accordingly, it is required to formulate an appropriate strategy, this paper mainly discuss, for this goal. First of all, several preliminary sites for the offshore wind farm are selected based on the evaluation criteria presented herein. In addition, the domestic sub-technological level of key technology sectors associated with the offshore wind power is analyzed. It includes the industries related to wind turbine, grid integration, structural design and construction. Integrating these results, we propose a strategy in order to successfully develop the first offshore wind farm more than 100-MW class in the south-western sea area of Korea.

Application of InVEST Offshore Wind Model for Evaluation of Offshore Wind Energy Resources in Jeju Island (제주도 해상풍력 에너지 자원평가를 위한 InVEST Offshore Wind 모형 적용)

  • KIM, Tae-Yun;JANG, Seon-Ju;KIM, Choong-Ki
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.20 no.2
    • /
    • pp.47-59
    • /
    • 2017
  • This study aims to assess offshore wind energy resources around Jeju Island using the InVEST Offshore Wind model. First the wind power density around the coast of Jeju was calculated using reanalysis data from the Korean Local Analysis and Prediction System (KLAPS). Next, the net present value (NPV) for the 168MW offshore wind farm scenario was evaluated taking into consideration factors like costs (turbine development, submarine cable installation, maintenance), turbine operation efficiency, and a 20year operation period. It was determined that there are high wind resources along both the western and eastern coasts of Jeju Island, with high wind power densities of $400W/m^2$ calculated. To visually evaluate the NPV around Jeju Island, a classification of five grades was employed, and results showed that the western sea area has a high NPV, with wind power resources over $400W/m^2$. The InVEST Offshore Wind model can quickly provide optimal spatial information for various wind farm scenarios. The InVEST model can be used in combination with results of marine ecosystem service evaluation to design an efficient marine spatial plan around Jeju Island.

Numerical Experiment on the Sogcho Eddy due to the strong offshore winds in the East Sea

  • Kim Soon Young;Lee Hyong Sun;Lee Jae Chul
    • Fisheries and Aquatic Sciences
    • /
    • v.1 no.1
    • /
    • pp.7-18
    • /
    • 1998
  • In order to understand the generation of the Sogcho Eddy due to the strong offshore winds, we first investigated the characteristics of winds at Sogcho, Kangnung and Samchuk, and then carried out a series of numerical experiments using the nonlinear 1 1/2-layer model. The models were forced by wind stress fields, similar in structure to the prevailing winds that a field in the east coast of Korea during the winter season. The winds were composed of the background winds $(-1\;dyne/cm^2)$ for 90 days and the local winds $(-4\;dyne/cm^2)$ for 30 days. The analysis of wind data at three stations (Sogcho, Kangnung, and Samchuk) showed that the wind was stronger in winter than in other seasons and the offshore component was much dominant. According to our numerical solutions, the Sogcho Eddy of about 200 km in diameter was generated due to the strong offshore winds prevailing in the Kangnung - Sogcho regions. The eastward propagation of the Rossby waves reflected at the western boundary resulted in the eastward meandering motion from the eastern side of the eddy.

  • PDF

Analysis on Siting Strategy for Offshore Wind Farm Based on National Wind Map and GIS (국가바람지도 및 지리정보시스템 기반의 해상풍력단지 입지전략 연구)

  • Kim, Hyun-Goo;Song, Kyu-Bong;Hwang, Sun-Young;Yun, Jin-Ho;Hwang, Hyo-Jeong
    • Journal of Environmental Science International
    • /
    • v.18 no.8
    • /
    • pp.877-883
    • /
    • 2009
  • This study has analyzed the scale, location, resource potential and feasibility of offshore wind farm scientifically and systematically based on the national wind map and GIS. For long-term wind power development, this study pursues siting strategy building, selection of target area and deciding development priority as well as the presenting a basis for assessment that are necessary for policy decision making by making theme layers under GIS environment. According to the analysis after organizing technological development by stages, even if only the most suitable sites are developed among the area of offshore wind farm candidates that can be developed under the current technological standard, it has been evaluated as being able to develop about 3 times of the wind power dissemination target until 2012. It is expected that about 5% of territorial water area can be developed in a short-term future while the southern offshore area possessing relatively favorable wind resource than the western offshore has been identified as the most feasible site. While about 23% of territorial water area has been classified as potential area for offshore wind farm development in a long-term future, even Jeju Island and offshore of Ulsan possessing excellent wind resource have been analyzed as feasible sites. The feasibility assessment of offshore wind lam development established by this study is expected to assist national strategy building for accomplishing the wind power dissemination target.