• 제목/요약/키워드: Western offshore of Korea

검색결과 74건 처리시간 0.02초

MERRA 재해석자료를 이용한 서해상 풍력자원평가 (Wind Resource Assessment on the Western Offshore of Korea Using MERRA Reanalysis Data)

  • 김현구;장문석;유기완
    • 풍력에너지저널
    • /
    • 제4권1호
    • /
    • pp.39-45
    • /
    • 2013
  • Massive offshore wind projects of have recently been driven in full gear on the Western Offshore of Korea including the 2.5 GW West-Southern Offshore Wind Project of the Ministry of Trade, Industry and Energy, and the 5 GW Offshore Wind Project of the Jeollanamdo Provincial Government. On this timely occasion, this study performed a general wind resource assessment on the Western Offshore by using the MERRA reanalysis data of temporal-spatial resolution and accuracy greatly improved comparing to conventional reanalysis data. It is hard to consider that wind resources on the Western Sea are excellent, since analysis results indicated the average wind speed of 6.29 ± 0.39 m/s at 50 m above sea level, and average wind power density of 307 ± 53 W/m2. Therefore, it is considered that activities shall be performed for guarantee economic profits from factor other than wind resources when developing an offshore wind project on the Western Offshore.

North-Western Australia 해상에 운용되는 Offshore Crane Pedestal 설계 (Technical considerations for engineering of crane pedestal operated in North-Western Australia Offshore)

  • 송준호;김용운;이경석;김만수
    • 대한조선학회 특별논문집
    • /
    • 대한조선학회 2015년도 특별논문집
    • /
    • pp.34-40
    • /
    • 2015
  • The design, procurement and fabrication of FPSO project ordered by Inpex Browse, Ltd. have been currently carried out by DSME(Daewoo Shipbuilding Marine and Engineering Co.). The unit will be installed and operated in the Ichthys field offshore of North-Western Australia and there are the particular design requirements to do with performance on the environment loads corresponding to max. 10,000 years return period wave. Also, the operational life of FPSO has to be over 40 years. With this background, this paper introduces the structural design procedure of crane pedestal foundation operated in north-western Australia offshore. The design of crane pedestal foundation structure is basically based on international design code (i.e. API Spec. 2C), Classification society's rule and project specifications. The design load cases are mainly divided into the crane normal operating conditions and crane stowed conditions according to environment conditions of the offshore with 1-year, 5-year, 10-year, 200-year and 10,000-year return period wave. This design experience for crane pedestal foundation operated in north-western Australia offshore will be useful to do engineering of other offshore crane structures.

  • PDF

Design and analysis of offshore wind structure

  • Young-Suk You;Min-Young Sun;Young-Ho Lee
    • Advances in Computational Design
    • /
    • 제8권3호
    • /
    • pp.191-217
    • /
    • 2023
  • The objective of this study was to evaluate the foundation structure of a 3.6-MW wind turbine generator (WTG) installed offshore in Western Korea. The ultimate limit state (ULS) and fatigue limit state (FLS) of the multi-pile steel foundation (MSF) installed at the Saemangeum offshore wind farm were structurally investigated using the finite element (FE) software, ANSYS Workbench 19.0. According to the ULS analysis, no plastic deformation was found in any of the components constituting the substructure. At the same time, the maximal stress value reached the calculation limit of 335 MPa. According to the FLS results, the stress concentration factor (SCF) ranged from 1.00 to 1.88 in all components. The results of this study can be applied to determine the optimal design for MSFs.

국내 해역의 해상풍력 가능자원 평가 및 예비부지 선정 (Assessment of Possible Resources and Selection of Preparatory Sites for Offshore Wind Farm around Korean Peninsula)

  • 김지영;강금석;오기용;이준신;유무성
    • 신재생에너지
    • /
    • 제5권2호
    • /
    • pp.39-48
    • /
    • 2009
  • Recently, developing the offshore wind farm in Korean peninsula is widely understood as essential to achieve the national target for the renewable energy. As part of national plan, KEPRI (Korea electric power research institute) is performing the front running project for the offshore wind farm development that is dedicated to investigate the possible resources based on the economy considering current technological status. It also includes the selection of the first sea area among candidates and optimal design of the offshore wind farm, etc. In this paper the interim results of the project are summarized that the possible capacity for the offshore wind farm can be estimated conservatively around 18 GW regarding the wind power class, sea depth and social constraint. The five western sea areas near Taean, Gunsan, Gochang, Yeonggwang, Sinan were chosen for the candidating sites. Detailed analysis for these sites will be conducted to finalize the first-going offshore wind farm in Korea.

  • PDF

A Study on the Application of Skirt Plates on Jacket Support Structures of Offshore Wind Turbines

  • Choi, Byeong-Ryoel;Choi, Han-Sik;Jo, Hyo-Jae;Lee, Sang-Hyep;Park, Young-Ho
    • Journal of Advanced Research in Ocean Engineering
    • /
    • 제4권2호
    • /
    • pp.47-52
    • /
    • 2018
  • The Korea Offshore Wind Power (KOWP) is planning to construct offshore wind energy farms with an overall rated power of 2.5 GW in the south-western coast of the country until 2019. Various types of support structures for offshore wind turbines have been proposed in the past. Nevertheless, in South Korea, jacket structures have in general, been applied as support structures for offshore wind turbines owing to the many accumulated experiences and know-how regarding this kind of support structure. The choice of offshore structure is mainly influenced by site conditions such as seabed soil type and sea environment during installation. In installing jacket sets on the seabed, the mudmat is necessary to maintain the equilibrium of the jacket without the aid of additional devices. Hence, this study proposes the installation of skirt plates underneath the bottom frame of jackets in order to improve the installation stability of jacket structures under rougher sea conditions. To confirm the effect of skirt plates, installation stability analyses considering overturning, sliding and bearing capacity have been performed. From the results, it is shown that jacket structures with skirt plates can contribute to improving the sliding stability of the structures of new wind power farms, while providing economic benefits.

부존량 및 기술수준 분석을 통한 국내 해상풍력 추진전략 (Strategy for Domestic Offshore Wind Power Development based on the Analysis of Natural Resources and Technology Level)

  • 유무성;강금석;이준신;김지영
    • 신재생에너지
    • /
    • 제6권1호
    • /
    • pp.20-28
    • /
    • 2010
  • Developing the offshore wind farm is essential to meet the national target of the renewable energy and to achieve the green growth in Korea. In this context, KEPRI is now carrying the feasibility study for introducing the offshore wind fam in Korea. Accordingly, it is required to formulate an appropriate strategy, this paper mainly discuss, for this goal. First of all, several preliminary sites for the offshore wind farm are selected based on the evaluation criteria presented herein. In addition, the domestic sub-technological level of key technology sectors associated with the offshore wind power is analyzed. It includes the industries related to wind turbine, grid integration, structural design and construction. Integrating these results, we propose a strategy in order to successfully develop the first offshore wind farm more than 100-MW class in the south-western sea area of Korea.

제주도 해상풍력 에너지 자원평가를 위한 InVEST Offshore Wind 모형 적용 (Application of InVEST Offshore Wind Model for Evaluation of Offshore Wind Energy Resources in Jeju Island)

  • 김태윤;장선주;김충기
    • 한국지리정보학회지
    • /
    • 제20권2호
    • /
    • pp.47-59
    • /
    • 2017
  • 본 연구는 InVEST(Integrated Valuation of Ecosystem Services and Tradeoff) Offshore Wind 모형을 활용하여 제주도 장선주 인근 해역의 해상풍력 에너지 자원을 평가하였다. 초단기 기상분석 및 예측 시스템(KLAPS)의 재분석 자료를 이용하여 제주도 인근 해역의 풍력밀도를 계산하고 터빈 조성비용, 터빈의 운영 효율, 해저케이블 설치비용, 20년 운영시나리오, 유지관리비 등을 고려하여 168MW 해상풍력 단지를 설치하였을 때의 순현재가치를 산정하였다. 제주도 인근 해역의 풍력밀도 분포도를 통하여 제주도 서쪽해역과 동쪽해역에 높은 풍력자원이 있음을 알 수 있었으며, 대부분의 서측해역과 동측해역은 $400W/m^2$ 이상의 높은 풍력밀도를 보였다. 제주지역 해상풍력발전에 대한 순현재가치를 가시적으로 평가하기 위하여 5등급으로 구분하였으며, $400W/m^2$ 이상의 풍력자원이 존재하는 서측 해역에서 높은 순현재가치를 보였다. InVEST Offshore Wind 모형은 다양한 운영시나리오에 대하여 최적의 공간정보를 신속하게 제공해 줄 수 있으며, 해양생태계서비스 평가 결과와 혼용하여 사용한다면 보다 효율적인 해양공간을 이용할 수 있을 것으로 판단된다.

Numerical Experiment on the Sogcho Eddy due to the strong offshore winds in the East Sea

  • Kim Soon Young;Lee Hyong Sun;Lee Jae Chul
    • Fisheries and Aquatic Sciences
    • /
    • 제1권1호
    • /
    • pp.7-18
    • /
    • 1998
  • In order to understand the generation of the Sogcho Eddy due to the strong offshore winds, we first investigated the characteristics of winds at Sogcho, Kangnung and Samchuk, and then carried out a series of numerical experiments using the nonlinear 1 1/2-layer model. The models were forced by wind stress fields, similar in structure to the prevailing winds that a field in the east coast of Korea during the winter season. The winds were composed of the background winds $(-1\;dyne/cm^2)$ for 90 days and the local winds $(-4\;dyne/cm^2)$ for 30 days. The analysis of wind data at three stations (Sogcho, Kangnung, and Samchuk) showed that the wind was stronger in winter than in other seasons and the offshore component was much dominant. According to our numerical solutions, the Sogcho Eddy of about 200 km in diameter was generated due to the strong offshore winds prevailing in the Kangnung - Sogcho regions. The eastward propagation of the Rossby waves reflected at the western boundary resulted in the eastward meandering motion from the eastern side of the eddy.

  • PDF

국가바람지도 및 지리정보시스템 기반의 해상풍력단지 입지전략 연구 (Analysis on Siting Strategy for Offshore Wind Farm Based on National Wind Map and GIS)

  • 김현구;송규봉;황선영;윤진호;황효정
    • 한국환경과학회지
    • /
    • 제18권8호
    • /
    • pp.877-883
    • /
    • 2009
  • This study has analyzed the scale, location, resource potential and feasibility of offshore wind farm scientifically and systematically based on the national wind map and GIS. For long-term wind power development, this study pursues siting strategy building, selection of target area and deciding development priority as well as the presenting a basis for assessment that are necessary for policy decision making by making theme layers under GIS environment. According to the analysis after organizing technological development by stages, even if only the most suitable sites are developed among the area of offshore wind farm candidates that can be developed under the current technological standard, it has been evaluated as being able to develop about 3 times of the wind power dissemination target until 2012. It is expected that about 5% of territorial water area can be developed in a short-term future while the southern offshore area possessing relatively favorable wind resource than the western offshore has been identified as the most feasible site. While about 23% of territorial water area has been classified as potential area for offshore wind farm development in a long-term future, even Jeju Island and offshore of Ulsan possessing excellent wind resource have been analyzed as feasible sites. The feasibility assessment of offshore wind lam development established by this study is expected to assist national strategy building for accomplishing the wind power dissemination target.