• Title/Summary/Keyword: Well Cost

Search Result 4,548, Processing Time 0.039 seconds

Practical Model to Estimate Road User Cost for Bridge Maintenance Strategy (교량 유지관리 전략 수립을 위한 실용적 도로이용자비용 추정 모델)

  • Park, Kyung-Hoon;Sun, Jong-Wan;Lee, Sang-Yoon;Lee, Jong-Soon;Cho, Hyo-Nam
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.11 no.6
    • /
    • pp.131-142
    • /
    • 2007
  • The road user cost in indirect costs as well as direct costs such as the inspection/ diagnosis cost and the repair/reinforcement cost should be considered as one of the important items in the life-cycle cost-effective design and maintenance of the bridges. To estimate the road user cost, this paper formulates the road user cost as a sum of the user delay cost and the vehicle operating cost considering the detour effect. A numerical traffic simulation and a regression analysis are performed to develop a regression model due to a time delay. The proposed regression model is applied to the generation of the maintenance strategy based on the life-cycle cost and performance, and its effectiveness and applicability is investigated. The road user cost has a great influence on establishing the maintenance strategy, and the proposed regression model could be successfully utilized to estimate the road user cost of a bridge.

A Study on the Analysis of LCA tools for Eco-Building (친환경 건축물의 LCA 평가도구 비교분석 연구)

  • Son, Woo-Jin;Kang, Hae-Jin;Rhee, Eon-Ku
    • 한국태양에너지학회:학술대회논문집
    • /
    • 2009.11a
    • /
    • pp.394-399
    • /
    • 2009
  • Since some decades ago, there has been a concern for resource depletion and environmental pollution associated with building properties. In addressing such impact of the built environment, there is a recognition of the existence of alternative building materials, fuels for energy supply as well as technologies for waste handling and disposal. Nevertheless, for long time, the choice between such alternatives was dictated by factors such as differences in prices and aesthetic values. A new important dimension in discriminating between different options is the environmental dimension. This aspect is important since buildings are one of the spatially big new additions to the natural environment that consume a lot of materials and energy during their long lifetime. Thus, with the environmental dimension kept in mind, a existing cost estimation needs to be changed. A new cost assessment method, Life Cycle Cost, should calculate overall costs with dimensional factors: investment and utility costs as well as maintenance costs over the lifetime of the building. Aiming to give an overview of the present status of Building Life Cycle Assessment(LCA) tools as a basis for further research and development including economic performance, this paper describes and compares 3 different tools for Life Cycle Assessment(LCA) and economic analysis of the green buildings. This paper compared these approaches based on various aspects. These include economic analysis method, evaluation duration, data of results(index). Use of the comparison analysis is to produce a better picture and indicate profits and shortcomings for the tools as a group; thus providing important direction improvement of LCA tool as well as further research and development of this group of tools.

  • PDF

A Method of Assigning Weight Values for Qualitative Attributes in CBR Cost Model (사례기반추론 코스트 모델의 정성변수 속성가중치 산정방법)

  • Lee, Hyun-Soo;Kim, Soo-Young;Park, Moon-Seo;Ji, Sae-Hyun;Seong, Ki-Hoon;Pyeon, Jae-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.53-61
    • /
    • 2011
  • For construction projects, the importance of early cost estimates is highly recognized by the project team and sponsoring organization because early cost estimates are frequently a foundation of business decisions as well as a basis for identifying any changes as the project progresses from design to construction. However, it is difficult to accurately estimate construction cost in the early stage of a project due to various uncertainties in construction. To deal with these uncertainties, cost estimates should be made several times over the course of the project. In particular, early cost estimates are essential process for successful project management. For accurate construction cost estimates, it is necessary to compare cost estimates with actual costs based on historical project data. In this context, case-based reasoning (CBR), which is the process of solving new problems based on the solutions of similar past problems, can be considered as an effective method for cost estimating. To obtain this, it is also required to define the attribute similarities and the attribute weights. However, no existing method is capable of determining attribute weights of qualitative variables. Consequently, it has been a well-known barrier of accurate early cost estimates. Using Genetic Algorithms (GA), this research suggests the method of determining the attribute weight of qualitative variables. Based on building project case studies, the proposed methodology was validated.

Comparison of Relative Weights of Cost for Road-bed Construction and Energy on Life Cycle Cost of Railroad -in Case of Seoul-pusan High Speed Rail (철도노선의 생애주기비용에서 노반건설비와 에너지비용의 상대적 비중 분석 - 경부고속철도 사례를 중심으로)

  • Suh, Sunduck;Kim, Jeong Hyun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.4
    • /
    • pp.1261-1267
    • /
    • 2014
  • It is generally recognize that the weight of energy cost for railroad alignment in the life cycle cost is higher than that for roadway. This study analyzed the relative weights of railroad road-bed construction cost and energy cost in the case of Seoul-Pusan High Speed Rail. Recently, the optimization of railroad alignment with computerized methodology has been studies. The optimization is supposed to aim the minimization of life cycle cost including the energy cost as well as the minimization of the construction cost. The operation period of the Seoul-Pusan High Speed Rail is limited to ten years, then various future operation scenario were developed for the next 20 years. The weight of energy cost is estimated 10~30% of the construction cost by scenario, and it is lower than the figure generally expected. It may be meaningful to provide the method to include the energy cost in the railroad alignment optimization.

An Analyzing the Cost-Saving Effect of R&D Investment: Focusing on the ICT Industry (연구개발투자에 따른 비용저감 효과 분석: ICT산업을 중심으로)

  • Pak, Cheolmin;Han, Jeongmin;Ku, Bonchul
    • Journal of Technology Innovation
    • /
    • v.24 no.3
    • /
    • pp.81-105
    • /
    • 2016
  • The purpose of this study is to estimate the cost-saving effect of R&D investment in the ICT industry. As is well known, the R&D investment induces both the product innovation and the process innovation, in turn leads the effect of creating profit and cutting cost. However, it appears that studies concerned with the cost-saving effect of R&D investment have been unproductive, while most existing studies concentrate on the topic involved with the creating profit of R&D investment. Therefore, we extend the effect of R&D investment to a framework of the cost-saving focusing on the ICT industry. To empirically analyze the effect, we built a simultaneous three-equation model comprising a translog cost function and two cost share equations, and employed the SUR analysis. As a result, we found out that the cost-saving effect on the total cost is statistically significant. In addition, we examined relationships between the R&D investment and each cost of production elements. The results show that on the one hand, the R&D investment and the intermediate good cost have the substitution relationship. On the other hand, the complementary relationship is observed between the R&D investment and each labor or capital cost.

Socioeconomic Costs of Food-Borne Disease Using the Cost-of-Illness Model: Applying the QALY Method (식중독의 사회경제적 비용추정: 삶의 질 개념을 적용한 질병비용추정법을 이용하여)

  • Shin, Ho-Sung;Lee, Sue-Hyung;Kim, Jong-Soo;Kim, Jin-Suk;Han, Kyu-Hong
    • Journal of Preventive Medicine and Public Health
    • /
    • v.43 no.4
    • /
    • pp.352-361
    • /
    • 2010
  • Objectives: This study estimated the annual socioeconomic costs of food-borne disease in 2008 from a societal perspective and using a cost-of-illness method. Methods: Our model employed a comprehensive set of diagnostic disease codes to define food-borne diseases with using the Korea National Health Insurance (KNHI) reimbursement data. This study classified the food borne illness as three types of symptoms according to the severity of the illness: mild, moderate, severe. In addition to the traditional method of assessing the cost-of-illness, the study included measures to account for the lost quality of life. We estimated the cost of the lost quality of life using quality-adjusted life years and a visual analog scale. The direct cost included medical and medication costs, and the non-medical costs included transportation costs, caregiver's cost and administration costs. The lost productivity costs included lost workdays due to illness and lost earnings due to premature death. Results: The study found the estimated annual socioeconomic costs of food-borne disease in 2008 were 954.9 billion won (735.3 billion won-996.9 billion won). The medical cost was 73.4 -76.8% of the cost, the lost productivity cost was 22.6% and the cost of the lost quality of life was 26.0%. Conclusions: Most of the cost-of-illness studies are known to have underestimated the actual socioeconomic costs of the subjects, and these studies excluded many important social costs, such as the value of pain, suffering and functional disability. The study addressed the uncertainty related to estimating the socioeconomic costs of food-borne disease as well as the updated cost estimates. Our estimates could contribute to develop and evaluate policies for food-borne disease.

A Development of Cost Estimation Model for Data Quality Analysis and Improvement Project (DB 품질개선사업의 대가 산정 모형연구)

  • Seo, Yong Won;Lee, Duck Hee;Jung, Seung Ho;Park, Kun Soo
    • Journal of Information Technology Services
    • /
    • v.14 no.2
    • /
    • pp.51-68
    • /
    • 2015
  • As interests in the quality of data in database systems are growing recently, analysis and improvement of data quality in databases have been an important issue. However, there has yet to be a clear agreement on how to reasonably calculate the total cost of such project. In this paper, based on real project data and budget statistics, we develop a model to estimate the cost for quality analysis and improvement project of a database. We first conduct statistical analysis to build our basic model. Throughout this analysis, we have identified factors that determine the scale of works required to conduct the project and eventually determine the cost. In addition, we have identified factors that determine the complexity of the project. These factors can adjusts the cost determined by the scale of works. Our model is verified and improved by surveys on experts. We apply our model to newly conducted projects and observe that our model estimates the cost of each project reasonably well.

Economic performance of cable supported bridges

  • Sun, Bin;Zhang, Liwen;Qin, Yidong;Xiao, Rucheng
    • Structural Engineering and Mechanics
    • /
    • v.59 no.4
    • /
    • pp.621-652
    • /
    • 2016
  • A new cable-supported bridge model consisting of suspension parts, self-anchored cable-stayed parts and earth-anchored cable-stayed parts is presented. The new bridge model can be used for suspension bridges, cable-stayed bridges, cable-stayed suspension bridges, and partially earth-anchored cable-stayed bridges by varying parameters. Based on the assumption that each structural member is in either an axial compressive or tensile state, and the stress in each member is equal to the allowable stress of the material, the material quantity for each component is calculated. By introducing the unit cost of each type of material, the estimation formula for the cost of the new bridge model is developed. Numerical examples show that the results from the estimation formula agree well with that from the real projects. The span limit of cable supported bridge depends on the span-to-height ratio and the density-to-strength ratio of cables. Finally, a parametric study is illustrated aiming at the relations between three key geometrical parameters and the cost of the bridge model. The optimization of the new bridge model indicates that the self-anchored cable-stayed part is always the dominant part with the consideration of either the lowest total cost or the lowest unit cost. It is advisable to combine all three mentioned structural parts in super long span cable supported bridges to achieve the most excellent economic performance.

Minimum life-cycle cost design of ice-resistant offshore platforms

  • Li, Gang;Zhang, Da-Yong;Yue, Qian-Jin
    • Structural Engineering and Mechanics
    • /
    • v.31 no.1
    • /
    • pp.11-24
    • /
    • 2009
  • In China, the oil and natural gas resources of Bohai Bay are mainly marginal oil fields. It is necessary to build both ice-resistant and economical offshore platforms. However, risk is involved in the design, construction, utilization, maintenance of offshore platforms as uncertain events may occur within the life-cycle of a platform under the extreme ice load. In this study, the optimum design model of the expected life-cycle cost for ice-resistant platforms based on cost-effectiveness criterion is proposed. Multiple performance demands of the structure, facilities and crew members, associated with the failure assessment criteria and evaluation functions of costs of construction, consequences of structural failure modes including damage, revenue loss, death and injury as well as discounting cost over time are considered. An efficient approximate method of the global reliability analysis for the offshore platforms is provided, which converts the implicit nonlinear performance function in the conventional reliability analysis to linear explicit one. The proposed life-cycle optimum design formula are applied to a typical ice-resistant platform in Bohai Bay, and the results demonstrate that the life-cycle cost-effective optimum design model is more rational compared to the conventional design.

A Study on Implementation and Design of Web-based Web-Cost Management System: Part 1; Design (웹 기반의 품질코스트 관리시스템 구축 : 제1부;시스템 설계)

  • Chung Young-Bae;Kim Yon-Soo;Kim Jun-Hong
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.27 no.3
    • /
    • pp.97-105
    • /
    • 2004
  • The purpose of this study is to design and implement web-based quality cost management system to measure the performance of quality improvement activities in the business firms. The designed web-based quality cost management system which is also known as WQCMS (Web-based Q-Cost Management System) utilized newly classified objective performance indicator items to measure quality related activities. Well-classified performance measurement Indicator item lists which are played key role in the system was researched and standardized according to size and business categories of enterprise. Its code standards are based from fundamental PAF Model. Developed WQCMS have ability to collect and analyze quality data generated from various different departments in the inside or outside of the enterprise without any limitations, if end-users are able to access wide area network. It provides the capability to integrate quality information from database and to generate various easy analysis reports to management's needs using built-in analysis tool modules with real-time. The proposed system was developed using Microsofi's .Net technology, ASP.NET and MS-SQL Server 2000. By web-enabling Q-cost management system, the effectiveness of the system management and utilization was realized by easiness of information Integration and economical efficiency.