• Title/Summary/Keyword: Welding details

Search Result 68, Processing Time 0.021 seconds

Development and Performance Evaluation of the Fourth Generation H-section Beam-to-Column Weak Axis Connection for Improving Workability (시공성 향상을 위한 제4세대 H형강 기둥-보 약축접합부의 개발 및 성능평가)

  • Kim, Pil-Jung;Boo, Yoon-Seob;Yang, Jae-Guen;Lee, Eun-Taik;Kim, Sang-Seup
    • Journal of Korean Society of Steel Construction
    • /
    • v.23 no.3
    • /
    • pp.295-304
    • /
    • 2011
  • Bracket-type connection is often used for the weak-axis steel connection. In general, a beam-to-column connection for the bracket type is fabricated at the shop and abeam splice is additionally attached to the bracket in the site. Therefore, steel construction would not be competitive due to the increase of beam splice fabrication cost and overall construction period. This paper now proposes the new weak-axis connection types without a scallop, which has more definite strength flow, simple connection details, and better workability. From the series of experiments, the proposed connections showed better strength and ductility in comparison with standard details with scallop because the thickness of the welding plate for wide-flanged, beam-to-column connection can be easily adjusted.

Pull-out Behaviors of Headed Bars with Different Details of Head Plates (Head 플레이트 상세에 따른 Headed Bars의 인발거동에 관한 연구)

  • Park, Hyun-Gyoo;Yoon, Young-Soo;Ryoo, Young-Sup;Lee, Man-Seop
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.2 no.2 s.5
    • /
    • pp.95-104
    • /
    • 2002
  • This paper presents the pull-out failure mode on Headed Bars and prediction of tensile capacity, as governed by concrete cone failure. 17 different plate types, three different concrete strengths and three different welding types of specimens were simulated. Test variables are the reinforcing bar diameters connected to headed plate (e.g., 16mm, 19mm and 22mm), the head plate shapes (e.g., circular, square, rectangular), the dimensions of head plates (e.g., area and thickness), the types of welding scheme for connection of reinforcing bars and head plates (e.g., general welding and friction welding). Headed Bars were manufactured in different areas, which shape and thickness are based on ASTM 970-98. Calculation of Embedment length in concrete is based on CSA 23.3-94, and static tensile load was applied. Pullout capacities tested were compared to the values determined using current design methods such as ACI-349 and CCD method. If compare experiment results and existings, Headed bar expressed high strength and bigger breakdown radious than standard by wide plate area and anomaly reinforcing rod unlike anchor.

Experimental Evaluation of Reserve Capacities for Connection Details between Steel Pipe Pile and Concrete Footing of Type-B (Type-B방식의 강관말뚝과 확대기초 연결부 상세에 따른 보유내력의 실험적 평가)

  • Han, Sang-Hoon;Hong, Ki-Nam;Kwon, Yong-Kil
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.12 no.1
    • /
    • pp.183-192
    • /
    • 2008
  • Generally, application of steel pipe pile as deep foundation member needs special requirement for the connection method between steel pipe pile and concrete footing. Even though two types of connection method are suggested in the korea highway bridge code, type-B method is prevalent. In this study, vertical, lateral, and tension loading test are done for two types of type B connection to review stress concentration, formation and behavior of imaginary RC column in the footing. Welding type and hook type as the connection method are considered in this study. Test results show that welding type have the more reserve capacity than hook type and the specimens connected by the welding type behave as the imaginary RC column in the footing. However, the specimens connected by the hook type did not behave as the imaginary RC column in the footing but behave as the hinge.

Chlorine effect on ion migration for PCBs under temperature-humidity bias test (고온고습 전원인가 시험에서 Cl에 의한 이온 마이그레이션 불량)

  • Huh, Seok-Hwan;Shin, An-Seob
    • Journal of Welding and Joining
    • /
    • v.33 no.3
    • /
    • pp.47-53
    • /
    • 2015
  • By the trends of electronic package to be more integrative, the fine Cu trace pitch of organic PCB is required to be a robust design. In this study, the short circuit failure mechanism of PCB with a Cl element under the Temperature humidity bias test ($85^{\circ}C$/85%RH/3.5V) was examined by micro-structural study. A focused ion beam (FIB) and an electron probe micro analysis (EPMA) were used to polish the cross sections to reveal details of the microstructure of the failure mode. It is found that $CuCl_x$ were formed and grown on Cu trace during the $170^{\circ}C$/3hrs and that $CuCl_x$ was decomposed into Cu dendrite and $Cl_2$ gas during the $85^{\circ}C$/85%RH/3.5V. It is suggested that Cu dendrites formed on Cu trace lead to a short circuit failure between a pair of Cu traces.

Experimental evaluation of splicing of longitudinal bars with forging welding in flexural reinforced concrete beams

  • Sharbatdar, Mohammad K.;Jafari, Omid Mohammadi;Karimi, Mohammad S.
    • Advances in concrete construction
    • /
    • v.6 no.5
    • /
    • pp.509-525
    • /
    • 2018
  • In this paper the application of forging process as benefit technique in Reinforced Concrete (RC) beam bars and comparison to lap splices was experimentally investigated with four concrete beam specimens with same dimensions and reinforcement details. The reference specimen was with no splices and the other three beams were with different splices (100% forging in the middle, 50% forging, and 100% lap splices in the middle). Beams were tested with the four points load system. Experimental test results indicated that using forging process as new bar splicing method can have high effects on increasing ductility and energy dissipation of concrete structures. It also proved that this method increased the flexural rigidity, energy absorption, and ductility of the RC beams. And also this research results showed that the flexural capacity and ductility of the beam with 50% forging were respectively increased up to 10% and 75% comparing to that of reference specimen, but the energy absorption of this beams was decreased up to 27%. The ductility of beam with 50% forging was increased up to 25% comparing the ductility of beam with 100% forging.

Improvement of the Design and Construction Technique of Orthotropic Steel Deck Bridges : Fatigue Strength of Three Dimensional Full-scaled Model (강바닥판교의 설계 및 시공성 향상방안 : 강바닥판교 3차원 실물 모형체의 피로강도)

  • Oh, Soon Taek
    • Journal of Korean Society of Steel Construction
    • /
    • v.18 no.1
    • /
    • pp.23-32
    • /
    • 2006
  • This study was conducted to improve the design and construction technique of orthotropic steel-deck bridges. After conducting an F.E.M. analysis of the various rib types of the connection details, static and fatigue tests were conducted, using a three-dimensional, full-scaled, orthotropic, steel-deck-plate model with internal diaphrams, to check the fatigue strength depending on the types of details. The model structure was made of two types of longitudinal ribs: the domestic standard and the European rabbit types. The fatigue strength of the steel-deck system was found to have improved through the installation of an internal diaphram, as no cracks were found on the bottom round part of the scallop with a diaphram. There were no differences between the domestic and the European types of details in terms of strength may be partially influenced by the shape of the scallop and by the installation of an internal diaphram, but it can be improved more significantly according to the quality of the welding that will be done.

Analytical Study on the Development of High-Performance Orthotropic Steel Deck considered the Fatigue Behaviors of Structural Details (구조 상세부의 피로거동을 고려한 고성능 강바닥판 개발에 관한 해석적 연구)

  • Kyung, Kab Soo;Shin, Dong Ho;Kim, Kyo Hun
    • Journal of Korean Society of Steel Construction
    • /
    • v.18 no.4
    • /
    • pp.417-426
    • /
    • 2006
  • Various fatigue damages have been reported in orthotropic steel deck structures put upon girders. These damages are caused by complex behaviors of the deck, which is directly subjected to vehicle loads. To estimate the causes of fatigue cracks at the welded connected parts of the trough rib and the flor beam, and the trough rib and the deck plate, in orthotropic steel deck structures, FE analyses were first, performed in this study. Parameter studies were carried out to suggest effective structural details that consider fatigue, in which the main parameters are the thickness of the deck plate, the shape of the connection of the trough rib and the flor beam such as the slit form, and the welding length. This study suggests that the effective structural details improved the fatigue strength and discusses.

Seismic Design of Steel Moment Connections with Welded Straight Haunch (용접 수평헌치로 보강된 철골 모멘트 접합부의 내진설계)

  • 이철호
    • Proceedings of the Earthquake Engineering Society of Korea Conference
    • /
    • 2000.10a
    • /
    • pp.269-277
    • /
    • 2000
  • This paper describes a seismic design procedure for steel moment connections with welded straight haunch. Recent test results showed that welding a straight haunch beneath the beam could be a viable solution for not only repair and rehabilitation of pre-Northridge moment connections but also new construction. Although a design procedure for the connection with triangular welded haunch has been developed recently, it is not applicable for the straight haunch moment connection because the force transfer mechanism is different. A simplified analytical model that considers the force interaction and deformation compatibility between the beam and haunch is briefly presented first based on the writer`s previous study. A generic design procedure as well as details that minimize the stress concentration at the haunch tip are also recommended.

  • PDF

Development of Vision System Model for Manipulator's Assemble task (매니퓰레이터의 조립작업을 위한 비젼시스템 모델 개발)

  • 장완식
    • Journal of the Korean Society of Manufacturing Technology Engineers
    • /
    • v.6 no.2
    • /
    • pp.10-18
    • /
    • 1997
  • This paper presents the development of real-time estimation and control details for a computer vision-based robot control method. This is accomplished using a sequential estimation scheme that permits placement of these points in each of the two-dimensional image planes of monitoring cameras. Estimation model is developed based on a model that generalizes know 4-axis Scorbot manipulator kinematics to accommodate unknown relative camera position and orientation, etc. This model uses six uncertainty-of-view parameters estimated by the iteration method. The method is tested experimentally in two ways : First the validity of estimation model is tested by using the self-built test model. Second, the practicality of the presented control method is verified in performing 4-axis manipulator's assembly task. These results show that control scheme used is precise and robust. This feature can open the door to a range of application of multi-axis robot such as deburring and welding.

  • PDF

Cyclic and static behaviors of CFT modular bridge pier with enhanced bracings

  • Kim, Dongwook;Jeon, Chiho;Shim, Changsu
    • Steel and Composite Structures
    • /
    • v.20 no.6
    • /
    • pp.1221-1236
    • /
    • 2016
  • Modular structures consist of standardized modules and their connections. A modular bridge pier is proposed to accelerate bridge construction. Multiple concrete-filled steel tubes (CFTs) using commercial steel tubes were chosen as the main members. Buckling restrained bracings and enhanced connection details were designed to prevent premature low-cycle fatigue failure upon cyclic loading. The pier had a height of 7.95 m, widths of 2.5 m and 2.0 m along the strong and weak axis, respectively. Cyclic tests were performed on the modular pier to investigate structural performance. Test results showed that four CFT columns reached yielding without a premature failure of the bracing connections. The ultimate capacity of the modular pier was reasonably estimated based on the plastic-hinge-analysis concept. The modular CFT pier with enhanced bracing showed improved displacement ductility without premature failure at the welding joints.