• Title/Summary/Keyword: Weld scallop

Search Result 7, Processing Time 0.029 seconds

Development of method to remove weld scallop and ceramic backing material of wedge type and its application

  • Kang, Sung-Koo;Yang, Jong-Soo;Kim, Ho-Kyung
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.7 no.2
    • /
    • pp.315-323
    • /
    • 2015
  • The weld scallop has been used for joining T-bars. There are a lot of weld scallops in shipbuilding. It is difficult to perform scallop welding due to the inconvenient welding position. This results in many problems such as porosity, slag inclusion, etc. In this study, a new method is devised to remove weld scallops by incorporating a Ceramic Backing Material (CBM). The weld scallop is removed by an elongation of the v groove. In order to insert a CBM into the groove without a weld scallop, a wedge-shaped CBM is developed. The top side of the developed CBM is similar to the shape of a general back bead. The bottom surface has a saw-toothed shape for cutting at a suitable length. This can be attached to the root side of a face plate using adhesive tape, just like a general CBM. Welding experiments in normal and abnormal conditions are carried out and the possibility of burn-through is examined. This CBM's applicability to shipbuilding is verified.

Development of Non-Scallop Block Joint Welding Method (논-스캘럽 블록 조인트 용접법 개발)

  • Kim, Ho-Kyeong;Ko, Dae-Eun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.9
    • /
    • pp.5419-5424
    • /
    • 2014
  • A weld scallop is a small quadrant or half circle type hole installed in the weld line cross area for easy welding operation. Many types of T-bars with a scallop can be welded in a block assembly stage in shipbuilding. The difficulties arise from the fact that scallops are to be filled by build-up welding after welding of the cross line is complete. In this study, a non-scallop block joint welding method was developed using special type CBM (ceramic backing material). The wedge shaped CBM was devised to insert a CBM into just the V groove of weld line cross area without weld scallop. A saw-toothed shape was adopted for easy cutting of the unnecessary part in the CBM fitting process. The applicability of the developed method was verified through welding experiments based on the yard welding conditions.

Fatigue performance of rib-roof weld in steel bridge decks with corner braces

  • Fu, Zhongqiu;Ji, Bohai;Wang, Yixun;Xu, Jie
    • Steel and Composite Structures
    • /
    • v.26 no.1
    • /
    • pp.103-113
    • /
    • 2018
  • To study the effects of corner braces on fatigue performance of the U-rib and roof weld in steel bridge decks, the fatigue experiment was carried out to compare characteristics of the crack shape with and without corner braces. The improvement of fatigue life and stress variation after setting corner braces were also analysed. Different parameters of corner brace sizes, arrangements, and detail types were considered in the FEM models to obtain stress distribution and variation at the weld. Furthermore, enhancement of the fatigue performance by corner braces was evaluated. The results demonstrated that the corner brace could improve the fatigue life of the U-rib and roof weld, which exerted even no influence on the crack shape. Moreover, stress of the roof weld was decreased and the crack position was transferred from the root weld to U-rib and corner brace weld. It was suggested no weld scallop should be drilled on the corner brace. A transverse rib with lower height which was set between U-ribs was favourable for improvement of fatigue performance.

Study on Elasto-Plastic Behavior of Column to Beam Connection with 600MPa High Performance Steel(SM 570 TMC) (기둥-보 용접접합부의 보단부 스캘럽형상과 탄소성 거동에 관한 실험적 연구 - 600MPa(SM570TMC)의 경우 -)

  • Kim, Jong Rak;Kim, Seung Bae;Kwon, June Yeop
    • Journal of Korean Society of Steel Construction
    • /
    • v.20 no.6
    • /
    • pp.691-700
    • /
    • 2008
  • Contemporary architectural structures have diverse and complex forms. Such structural variety demands requisite performance from the connections in the steel structure so that the latter could resist a horizontal force, such as an earthquake. The connections are the all-important components that create the discontinuous form and that support stress concentration, determining the stiffness and toughness of the entire steel frame. In this study, a real-scale column-to-beam connection was constructed in the 600MPa-grade high-strength and high-performance steel, to test its behavior. Its material and welding characteristics were examined in this study, and its structural performance was analyzed by conducting seismic-resistance tests on the full-scale, cross-shaped column-to-beam welded connections with non-scallop, ordinary-scallop, and reinforced-scallop details. The weld ability of the high-strength, high-performance steel was also evaluated, and data regarding the seismic design for practical application were provided.

Evaluation on Applicability of Stress Relief Hole for Improvement of Fatigue Stress Capacity of Steel Structural Details (강구조상세부의 피로저항능력 개선을 위한 응력완화홀 적용성 평가)

  • Jung, Kyoung Sup;Nam, Seung Hoon;Kim, Kyoung Nam;Yang, Keon Bong
    • Journal of Korean Society of Steel Construction
    • /
    • v.25 no.5
    • /
    • pp.451-461
    • /
    • 2013
  • In steel bridges, there are several details that constrain the deformation such as buckling by external forces. Most of these details which are composed of the intersection members have scallops in order to exclude the weld defects inherently and to get the ease of fabrication and also to decrease the stress concentration. In this study, stress relief hole (SRH) near stress concentration zone with detail category D or under is proposed as a method to improve the resistance on the fatigue crack initiation to detail category C. And the effects of the appropriate size and location of SRH were examined and the applicability to improve the fatigue resistance of the floorbeam web and the rib wall at rib/floorbeam intersection in the orthotropic steel deck bridge was evaluated.

Relief Hole for Improvement of Fatigue Strength in Welded Intersections of Transverse and Longitudinal Ribs in Orthotropic Deck (가로리브와 U리브 용접부의 피로강도 향상을 위한 응력완화홀)

  • Jung, Kyoung Sup;Nam, Seung Hoon;Yang, Keon Bong;Kim, Kyoung Nam
    • Journal of Korean Society of Steel Construction
    • /
    • v.26 no.5
    • /
    • pp.419-430
    • /
    • 2014
  • On going researches which are being made on the welded joints at the intersections of closed ribs such as U-ribs with floor-beams in ortho-tropic steel decks still have been used the shape of scallops with or with not diaphragm inside. Stress Relief Hole(SRH) being presented in this study was investigated in order to reduce the fatigue damage in the intersections of U-rib with floor-beam. Finally, it is verified that circular SRHs sufficiently relief the concentration stress at the intersections of U-rib with floor-beam and shows that SRH can be offer one of the methods that can prevent the fatigue damage in these structural details.

Information Delivery Requirements of Steel Structure according the Structural Design Stages using IDM (IDM을 이용한 강구조의 구조설계 단계별 정보전달 요구 분석)

  • Lee, Jae-Cheol
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.3
    • /
    • pp.1467-1473
    • /
    • 2013
  • In construction project, it is important to exchange and share the digital information generated by their own professional softwares. So this paper analyzed the information delivery requirements of steel structure according the structural design stages using IDM methodology. For schematic design stage and detailed design stage, the structural design information to share in each design stages is abstracted by defining the PM, ER, and FP. The new ERs and FPs are proposed by defining the new property sets(Psets), suchlike bolt gauge line, weld, scallop, and cope, to complement the structural design information of $IFC2{\times}3$. Finally, the reasonability of the proposed new ERs, FPs are verified by applying them to represent the standard steel connection sample in detailed design stage. As a result, the structural design information of standard steel connection could be stored and managed sufficiently by using the proposed new ERs and FPs.