• Title/Summary/Keyword: Weather Conditions

Search Result 1,782, Processing Time 0.03 seconds

The Study on the Frontal Thunderstorm during Winter Time in the Korean Peninsula (우리나라 동계 전선성 뇌우에 관한 연구)

  • Kim, Jong-Seok;Park, Sang Hwan;Ham, Sook Jung;Ban, Ki-Song;Choi, Young Jean;Chang, Dong-Eon;Chung, Hyo-Sang
    • Atmosphere
    • /
    • v.16 no.4
    • /
    • pp.351-358
    • /
    • 2006
  • The structure of frontal thunderstorm in winter time is different from that of in summer time over the Korean peninsula, due to dry tongue and upward motion. The dry tongue, that is propagation of dry zone from upper level to lower level, was formed after front passage and the upward motion is intensified by the strengthened low level jet. Since this mechanism makes the structure more unstable, thunderstorm occurs at relatively low cloud top height. This study suggests a forecast guidance of winter time frontal thunderstorm that thunderstorms develop when one of the following conditions are satisfied: 1) total totals (TT) >40, 2) K index >-10, 3) mixing ratio ${\geq}$ 3.5 g/kg.

A Study on Anti-Icing Technique for Weather-Tight Door of Ice-Strengthened Vessels (내빙선박용 풍우밀 문의 결빙방지 기법 연구)

  • Jeong, Seong-Yeob;Chun, Eun-Ji;Cho, Seong-Rak;Lee, Chun-Ju
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.48 no.6
    • /
    • pp.575-580
    • /
    • 2011
  • Icing problem of ice-strengthened vessels is an important issue when operating in low temperature environment and it can cause damage to deck machineries and emergency equipments. Many ice-strengthened vessels have since been constructed and operated in accordance with the ice class rules such as Det Norske Veritas (DNV), Russian Maritime Register of Shipping (RS), American Bureau of Shipping (ABS) and so on. Therefore winterization is defined as the preparation of a ship for safe operation. In this research, anti-icing performance tests of weather-tight door have been carried out at various temperature conditions($5^{\circ}C$, $-10^{\circ}C$, $-20^{\circ}C$, $-30^{\circ}C$, $-40^{\circ}C$) in the low temperature cold room facility and then, ambient temperature, specimen temperature, electric current and temperature of heating cable were measured during the test operations. This research describes the construction guidelines of weather-tight door based on anti-icing test results to apply to the full-scale vessels.

A study on the analytical method for calculating the inside air temperature transient and energy consumption load of the building using two different controllers (두개의 제어기를 사용한 건물 내부의 온도변화와 에너지소비량을 계산하기 위한 해석적 연구)

  • Han, Kyu-Il
    • Journal of the Korean Society of Fisheries and Ocean Technology
    • /
    • v.48 no.1
    • /
    • pp.82-90
    • /
    • 2012
  • Four different buildings having various wall construction are analyzed for the effect of wall mass on the thermal performance and inside building air and wall temperature transient and also for calculating the energy consumption load. This analytical study was motivated by the experimental work of Burch et al. An analytical solution of one-dimensional, linear, partial differential equations is obtained using the Laplace transform method, Bromwich and modified Bromwich contour method. A simple dynamic model using steady state analysis as simplified methods is developed and results of energy consumption loads are compared with results obtained using the analytical solution. Typical Meteorological Year data are processed to yield hourly average monthly values. This study is conducted using weather data from two different locations in Korea: Daegu having severe weather in summer and winter and Jeju having mild weather almost all year round. There is a significant wall mass effect on the thermal performance of a building in mild weather condition. Buildings of heavyweight construction with insulation show the highest comfort level in mild weather condition. A proportional controller provides the higher comfort level in comparison with buildings using on-off controller. The steady state analysis gives an accurate estimate of energy load for all types of construction. Finally, it appears that both mass and wall insulation are important factors in the thermal performance of buildings, but their relative merits should be decided in each building by a strict analysis of the building layout, weather conditions and site condition.

Relationship Between Construction Productivity and the Weather Elements in the Reinforced Concrete Structure for the High-rise Apartment Buildings (기후요소와 생산성간의 상관관계 분석에 관한 연구 - 공동주택 철근콘크리트 골조공사를 중심으로 -)

  • Kim Shin-Tae;Kim Yea-Sang;Chin Sang-yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.80-89
    • /
    • 2004
  • Among the various factors influencing construction productivity, weather conditions or elements become very important factors in planning and executing construction project. It is especially true in Korea where the weather changes dramatically through few seasons. In this study, relationship between construction productivity of the reinforced concrete structure we for the high-rise apartment buildings and 5 weather elements including temperature, humidity, day time, rainfall, and wind velocity have been analyzed The results trough regression analysis showed that weather elements explain $58.8\%$ of productivity in total and temperature and day time were more important factors among them.

Competition between ICME and crustal magnetic field on the loss of Mars atmosphere

  • Hwang, Junga;Jo, Gyeongbok;Kim, Roksoon;Jang, Soojeong;Cho, Kyungsuk;Lee, Jaejin;Yi, Yu
    • The Bulletin of The Korean Astronomical Society
    • /
    • v.42 no.2
    • /
    • pp.62.3-63
    • /
    • 2017
  • The Mars Atmosphere and Volatile (MAVEN) mission has been providing valuable information on the atmospheric loss of Mars since its launch in November 2013. The Neutral Gass and Ion Mass Spectrometer (NGIMS) onboard MAVEN, was developed to analyze the composition of the Martian upper atmospheric neutrals and ions depending on various space weather conditions. We investigate a variation of upper atmospheric ion densities depending on the interplanetary coronal mass ejections (ICMEs). It is known that the Mars has a very weak global magnetic field, so upper atmosphere of Mars has been strongly affected by the solar activities. Meanwhile, a strong crustal magnetic field exists on local surfaces, so they also have a compensating effect on the upper atmospheric loss outside the Mars. The weak crustal field has an influence up to 200km altitude, but on a strong field region, especially east longitude of $180^{\circ}$ and latitude of $-50^{\circ}$, they have an influence over 1,400km altitude. In this paper, we investigated which is more dominant between the crustal field effect and the ICME effect to the atmospheric loss. At 400km altitude, the ion density over the strong crustal field region did not show a significant variation despite of ICME event. However, over the other areas, the variation associated with ICME event is far more overwhelming.

  • PDF

Numerical Prediction of Permanent Deformation of Automotive Weather Strip (자동차용 웨더스트립의 영구변형 예측)

  • Park, Joon-Chul;Min, Byung-Kwon;Oh, Jeong-Seok;Moon, Hyung-Il;Kim, Heon-Young
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.18 no.4
    • /
    • pp.121-126
    • /
    • 2010
  • The automotive weather strip has functions of isolating of water, dust, noise and vibration from outside. To achieve good sealing performance, weather strip should be designed to have the high contact force and wide contact area. However, these design causes excessive permanent deformation of weather strip. The causes of permanent deformation is generally explained to be the chemical material detrioration and physical variation and cyclic loading, etc. This paper introduces a numerical method to predict the permanent deformation using the time dependent viscoelastic model which is represented by Prony series in ABAQUS. Uniaxial tension and creep tests were conducted to obtain the material data. And the lab. test for the permanent deformation was accelerated during shorter time, 300 hours. The permanent deformation of weather strip was successfully predicted under the different loading conditions and different section shapes using the suggested numerical process.

Competing for the Responsibility of the Operational Meteorological Satellite Program: After the Launch of TIROS in 1960 (현업용 기상위성에 대한 주도권 다툼: 1960년 TIROS 발사 이후)

  • Ahn, Myoung-Hwan
    • Atmosphere
    • /
    • v.24 no.2
    • /
    • pp.265-281
    • /
    • 2014
  • Currently, Korea is developing a Cheollian follow-on satellite program, named as Geostationary Korea Multipurpose Satellite 2 (GK-2), which consists of two satellites. One satellite (GK-2A) is dedicated to the meterological mission, while the second one (GK-2B) hosts two main payloads for the ocean and environmental application. As GK-2A is dedicated to the meteorological mission unlike Cheollian, there have been discussions on the possibility of transferring the responsibilities of the GK-2A program to the Korea Meteorological Administration. To help resolve any consumptive disputes or to find an efficient way for the GK-2A program, the events happened after the successful launch of the first meteorological satellite TIROS-1 in the U.S. in April 1960 are investigated. With the successful demonstration of usefulness of TIROS-1 for the meteorological applications, organizations such as the Weather Bureau and the Department of Defense, responsible for the real time application of the TIROS 1 data, strongly requested for an operational meteorological satellite program which resulted in the plan for the National Operational Meteorological Satellite System (NOMSS). The plan was strongly supported by Kennedy Adminstration and was put forwarded for the new program under the responsibility of Weather Bureau to the Congress. However, the responsible Committee on Science and Aeronautics sided with NASA and requested major revision of the responsibility. Due to many unfavorable conditions, Weather Bureau accepted the requests and signed with NASA on the agreement for the operational meteorological satellite. However, with the delay of Nimbus satellite which is planned to be used for the prototype of the operational satellite and changes of the unfavorable situations, the Weather Bureau could draw a second agreement with NASA. The new agreement reflected most propositions requested by the Weather Bureau for the NOMSS plan. Until now the second agreement is regarded as the basic principles for the operational meteorological satellite program in the U.S. This study investigates the backgrounds and processes of the second agreement and its implications for the GK-2 program.

A Study on the Weavigation Service for Smart Devices that Reflects the Real-Time Weather Conditions in Vulnerable Area (취약지역 실시간 기상상황을 반영한 스마트기기용 웨비게이션 서비스 연구)

  • Bae, Kwang Yong;Lee, Jae Eun;Kim, Young Beom
    • Journal of Climate Change Research
    • /
    • v.4 no.4
    • /
    • pp.385-395
    • /
    • 2013
  • In this paper, we target to develop weather platform and services to use in smart devices which is in real-time mobility environment. The existing TPEG-based navigation service requires a dedicated terminal, DMB communication method, and service scalability, so there are limits. In this paper, we analyze, processing and storage the real-time weather information suitable for navigation on the end user's smart devices by weather information service platform has been developed that can provide a standardized. In addition, we develop weavigation services and API for the developer to develop weather services easily. And we introduce system for serving information of dangerous district forecast based on natural disaster dangerous district data.

A Stochastic Simulation Model for Estimating Activity Duration of Super-tall Building Project

  • Minhyuk Jung;Hyun-soo Lea;Moonseo Park;Bogyeong Lee
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.397-402
    • /
    • 2013
  • In super-tall building construction projects, schedule risk factors which vertically change and are not found in the low and middle-rise building construction influence duration of a project by vertical attribute; and it makes hard to estimate activity or overall duration of a construction project. However, the existing duration estimating methods, that are based on quantity and productivity assuming activities of the same work item have the same risk and duration regardless of operation space, are not able to consider the schedule risk factors which change by the altitude of operation space. Therefore, in order to advance accuracy of duration estimation of super-tall building projects, the degree of changes of these risk factors according to altitude should be analyzed and incorporated into a duration estimating method. This research proposes a simulation model using Monte Carlo method for estimating activity duration incorporating schedule risk factors by weather conditions in a super-tall building. The research process is as follows. Firstly, the schedule risk factors in super-tall building are identified through literature and expert reviews, and occurrence of non-working days at high altitude by weather condition is identified as one of the critical schedule risk factors. Secondly, a calculating method of the vertical distributions of the weather factors such as temperature and wind speed is analyzed through literature reviews. Then, a probability distribution of the weather factors is developed using the weather database of the past decade. Thirdly, a simulation model and algorithms for estimating non-working days and duration of each activity is developed using Monte-Carlo method. Finally, sensitivity analysis and a case study are carried out for the validation of the proposed model.

  • PDF

Degradation of Coatings under Atmospheric Tropical Conditions

  • To, Thi Xuan Hang;Pham, Gia Vu;Vu, Ke Oanh;Trinh, Anh Truc;Kodama, Toshiaki;Tanabe, Hiroyuki;Taki, Tohru;Nagai, Masanori
    • Corrosion Science and Technology
    • /
    • v.2 no.5
    • /
    • pp.207-211
    • /
    • 2003
  • The weather resistance of five coatings systems based on alkyd, chlorinated rubber, epoxy, polyurethane and fluoropolymer were studied by natural exposure test and accelerated test. The coatings were exposed at Hanoi station with urban industry atmosphere and at Baichay station with marine atmosphere. The degradation of coatings was evaluated by gloss measurement and surface analysis by scanning electronic microscopy. The results obtained show that among coatings tested the gloss of polyurethane and fluoropolymer coatings remained highly and those of alkyd, chlorinated rubber and epoxy coatings were very low after two years of atmospheric exposure. Under accelerating conditions the gloss of fluoropolymer coatings remained highly after 80 cycles of testing. By comparison with accelerating test in UV-condensation chamber the conditions at atmospheric stations are more aggressive.