• Title/Summary/Keyword: Weaspon systems

Search Result 1, Processing Time 0.014 seconds

Determination of Key Elements Using FTA/FMEA Safety Techniques for Precedent Research Stage of Defense R&D Programs (국방 선행연구단계에서 안전분석 기법 FTA/FMEA의 활용을 통한 핵심요소의 결정)

  • Choi, Se Keun;Kim, Young-Min;Lee, Jae-Chon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.9
    • /
    • pp.50-61
    • /
    • 2018
  • A precedent defense project study was carried out in the early stage of the project to support efficient determination of the acquisition method of the determined weapons system. A precedent study in the early stage of the project has been neglected, but lack of performance and increased costs are continuing problems. In a precedent study on a number of items within a limited time frame, expected risks during project implementation were not identified and reduced by failing to review the key review element in depth. Therefore, in this paper, we studied the application of the FTA/FMEA technique used in the system safety analysis process to identify key factors to be considered when carrying out the defense research project. The methodology for the development of the key review items was established through the improvement of the FTA/FMEA technique in order to meet specific conditions and given conditions. Based on the results of this study, we redefined core key factors in the precedent study stage, thereby eliminating unnecessary and anticipated risks that may arise in the future project management aspects of the defense project. It is anticipated that this will reduce costs and time in terms of the lifecycle of the weapon system and promote stable operation of the project through reduction of risk.