High precision voltages. currents. power factor and electrical power measurements wide range of frequency can be achieved by using the thermo-elements (thermal converters). This paper describes the development wattmeter. based on a thermal principle. The instrument has been performed measurement in the range of currents from 0 to 50 A, voltages up to 600 V, power factor 0.5. 1 and frequencies from 45 Hz to 3 kHz. The thermal converters with two heater are used in the functional element of the wattmeter.
High precision voltages, currents, and electrical power measurements in wide range of frequency can be achieved by using the thermo-elements(thermal converters). This paper describes a development wattmeter, based on a thermal principle. The instrument has been performed measurement in the range of currents from 0 to 50 A, voltages up to 480 V, power factor 0.5 (lag, lead), 1 and frequencies from 60 Hz to 3 KHz. It is intended to be used by electric utilities, standard laboratories, testing laboratories, and applications where high measurement accuracy are attractive consideration.
This paper suggests on-load torque measurement for 3 phase induction motors by input -voltage and current utilizing symmetric coordinate analysis technique on the basis of the induction motor equivalent circuit. In this paper, two cases are treated with, i.e, one is the case where the motors' exciting current and primary leakage impedance voltage drop are compensated automatically, adopting the ideal wattmeter whose current coil impedance and voltage coil impedance are 0 and .inf. respectively, and the other is the case where non-ideal wattmeter is adopted and the compensation above is made by computation. As a result of the case study, following conclusions are obtained. 1) By proper combination of the error propagation law and the limit of power consumption, the desirable overall measurement error of the apparatus can be obtained on the basis of the inherent errors of CT and PT. 2) The measurement error is larger in current simulation circuit than in voltage simulation circuit. 3) Between the two cases, the latter is more advantageous than the former from the viewpoint of feasibility and the measurement error. 4) As the attachment of Ammeter in the current simulation circuit influences the measurement error considerably, its internal impedance should be large considerably. 5) The larger the consumption power of the apparatus is, the easier the feasibility is.
This paper presents calculated and measured AC losses of the HTS pancake coil. Magnetic field in the HTS coil under operating conditions was calculated by FEM. Results of measured ac loss in 4-stacked short sample were used in the AC loss calculation. Various methods, such as, electric method, calorimetric method, wattmeter method, were used to measure the AC loss.
Journal of Advanced Marine Engineering and Technology
/
제11권4호
/
pp.33-40
/
1987
Arc power is consumed energy per unit time between welding electrodes. The relations between consumed energy and electrode distance, current, voltage are nonlinear characteristics. Therefore commercial A.C. wattmeter cannot be used for measurement of the arc power. Most of arc energy measuring systems are developed for relay contact arc measurement. Relaly arc requires integrated instantaneous power because relay arc finishes in a short instant. But most of welding powers are continually consumed powers, therefore instantaneous power must be continually indicated in the form of averagy value. The author propose a new measurement method of power in which the current and voltage of welding electrode is multiplied and the resultant signal is passed to low pass filter in order to remove higher order frequency components. After integrating, the signal is devided by the integral interval and the results are stored in a computer memory.
We propose a design method of high accuracy power measuring device and the method of securing the reliability of the measured data. As a design method for the development of the high accuracy power measuring device, the circuit was made by reflecting the high accuracy power measuring ICs and the CT (Current Transformer). To ensure the reliability of the power meter, we requested to the watt-hour meter certified testing organization to measure the error rate, and the error rate of active power based on the "Wattmeter Technical Standard(Revision notify 2014-283)" was measure, and the error rate was confirmed to be less than 0.1%.
The power comparison techniques have implemented power measurements, in which a power comparator is used to balance ac against a dc power obtained from known values. The developed power standard system using the comparison techniques consists of dc sources, ac source, control switches, resistive voltage dividers, resistive shunts and a power comparator. The total uncertainty of the power standard system was proved by analysis of the component instruments. Its expanded(k=2) uncertainty is evaluated to be less than 30 uW/VA at unit power factor and 42 uW/VA at power factor 0.5
The development of monitoring and analysis systems to increase productivity while saving energy is needed as a method to reduce huge amount of energy consumed in the process of producing large forged products. In this paper, we propose a system to monitor and analyze energy usage in real-time collected from gas-meter, wattmeter, and thermometer based on IoT installed in forging factories. The system consists of a data collection server for collecting and processing data from IoT- based platform and existing SCADA equipment and ERP/MES system in forging factories, and an application server for providing services to users. To develop the system, the overall system structure is logically diagrammed, and the databases configuration and implementation modules to efficiently store and manage data are presented. In the future, the system will be utilized to reduce energy consumption by analyzing energy usage pattern and optimizing process works with real-time energy usage and production process data for each facility.
Purpose: The underground air is the warm air discharged from the porous volcano bedrock 30-50m underground in Jeju, including excessive humidity. The temperature of the underground air is $15-20^{\circ}C$ throughout the year. In Jeju, the underground air was used for heating greenhouses by supplying into greenhouses directly. This heating method by supplying the underground air into greenhouses directly had several problems. The study was conducted to develop the heat pump system using underground air as heat source for resolving excessive humidity problem of the underground air, adopting the underground air as a farm supporting project by Ministry of Agriculture, Food and Rural Affairs(MAFRA) and saving heating cost for agricultural facilities. Method: 35kW scale(10 RT) heat pump system using underground air installed in a greenhouse of area $330m^2$ in Jeju-Special Self-Governing Province Agricultural Research & Extension Services, Seogwipo-si, Jeju. The inlet and outlet water temperature of the condenser, the evaporator and the thermal storage tank and the underground air temperature and the air temperature in the greenhouse were measured by T type thermocouples. The data were collected and saved in a data logger(MV200, Yokogawa, Japan). Flow rates of water flowing in the condenser, the evaporator and the thermal storage tank were measured by an ultrasonic flow meter(PT868, Panametrics, Norway). The total electric power that consumed by the system was measured by a wattmeter(CW240, Yokogawa, Japan). Heating COP, rejection heat of condenser, extraction heat of evaporator and heating cost were analyzed. Result: The underground air in Jeju was adopted as a farm supporting project by Ministry of Agriculture, Food and Rural Affairs(MAFRA) in 2010. From 2011, the heat pump systems using underground air as a heat source were installed in 12 farms(16.3ha) in Jeju.
전 세계적으로 지구 온난화 및 에너지 비용 상승으로 인해서 에너지 절감에 대한 관심이 증가하고 있다. 특히, 단조 공장들은 에너지를 많이 사용하기 때문에 에너지를 절감하면서 생산성을 향상시키는 방법에 대한 연구가 필요하다. 이러한 진입을 위한 한 가지 해결책으로 IoT 기반으로 각 설비의 에너지 사용량을 실시간으로 파악할 수 있는 시스템을 제안한다. 본 시스템은 생산 공장에서 사용하는 기존 기업자원관리시스템과 생산실행시스템과의 연동으로 작업일지 입력/관리, 설비/에너지 관리, 실시간 에너지 모니터링, 이력 검색, 데이터 분석 등으로 구성된다. 중심이 되는 실시간 에너지 모니터링 프로세스는 각 설비별로 기존 설치되어 있는 가스계량기와 전력계에 IoT 디바이스를 연결시켜 데이터를 실시간으로 수집한다. 그리고 수집된 에너지 사용량을 웹 또는 모바일에서 실시간으로 화면에 표출한다. 본 시스템의 장점은 생산 공정 단계에서 설비별 도시가스 및 전력 에너지 사용량의 변화, 사용요금, 에너지 환산, 온실가스 등의 정보를 웹 기반에서 실시간으로 파악할 수 있다는 것이다. 향후, 빅 데이터 기반에서 에너지 사용량을 수집하여 생산 공정별로 에너지 사용량을 분석함으로써 제품 생산 소요시간을 최소화할 수 있는 에너지 절감 방안 수립에 사용될 수 있다. 또한, 모바일 작업일지시스템과 생산 공정 최적화 모델과 융합하면 에너지를 절감하면서 생산성을 향상시키는 방안이 마련될 수 있다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.