• Title/Summary/Keyword: Watershed runoff rate

Search Result 141, Processing Time 0.03 seconds

Forecasting Long-Term Steamflow from a Small Waterhed Using Artificial Neural Network (인공신경망 이론을 이용한 소유역에서의 장기 유출 해석)

  • 강문성;박승우
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.43 no.2
    • /
    • pp.69-77
    • /
    • 2001
  • An artificial neural network model was developed to analyze and forecast daily steamflow flow a small watershed. Error Back propagation neural networks (EBPN) of daily rainfall and runoff data were found to have a high performance in simulating stremflow. The model adopts a gradient descent method where the momentum and adaptive learning rate concepts were employed to minimize local minima value problems and speed up the convergence of EBP method. The number of hidden nodes was optimized using Bayesian information criterion. The resulting optimal EBPN model for forecasting daily streamflow consists of three rainfall and four runoff data (Model34), and the best number of the hidden nodes were found to be 13. The proposed model simulates the daily streamflow satisfactorily by comparison compared to the observed data at the HS#3 watershed of the Baran watershed project, which is 391.8 ha and has relatively steep topography and complex land use.

  • PDF

The Characteristics on the Groundwater Level Change and Rainfall-Runoff in Moojechi Bog (무제치늪 지역의 지하수위 변동과 강우의 유출 특성)

  • 이헌호;김재훈
    • Korean Journal of Environment and Ecology
    • /
    • v.16 no.3
    • /
    • pp.239-248
    • /
    • 2002
  • This study was conducted to investigate the hydrological characteristics of groundwater level change and rainfall-runoff processes at the Moojechi Bog located in Mt. Jeungjok, Ulsan. The average runoff rate of bog was 0.58 which is similar to that of general mountainous watershed. In the short term hydrograph, runoff was increased slowly and It took a long time to arrive peak flow. After that time, the decreasing pattern of runoff was slower than that of general mountainous watershed. In case of the long term water budget, the Moojechi Bog had a abundant base flow and runoff was continued in spite of non rainfall period. The groundwater level was arrived peak flow immediately after rain stop but was decreased very slowly until the next rain. The change pattern of long term groundwater level was very similar to that of the amount of rain and discharge. The higher rainfall intensity was, the lower slope of recession curve on the groundwater level was and the longer rainfall duration was, the longer peak flow was. Judging from these results, Moojechi bog could be evaluated to have a constant groundwater level.

Urban Hydrologic Monitoring due to Internet Hydrologic Monitoring System (인터넷 수문관측시스템을 이용한 도시수문 모니터링)

  • Seo, Kyu Woo;Kim, Nam Gil;Na, Hyun Woo;Lee, In Rock
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2004.05b
    • /
    • pp.1321-1325
    • /
    • 2004
  • The continuous monitoring of the runoff in the small-scaled urban watershed and easily accessible experiment catchment is necessary to investigate the overall status of the development in the urban catchment and the varying aspects of the discharge characteristics due to the urbanization. However, the research on the management and the characteristics of the small-scaled model basin for discharge tests has not been actively performed up to now. This study selects the Dong-Eui university basin, which locates at Gaya-dong in Busan, as the experiment catchment to monitor the discharge rate in the urban watershed. EMS(DEMS, DATA-PCS EMS, mini rain gage & AWS(AWS-DEU, DATA-PCS AWS) monitoring system installed for the collection of hydrological data such as the rainfall and the waterlevel. This experiment catchment is the typical urban catchment and is under development, and it is possible to analyze the varying aspects of the discharge rate during and after the development.

  • PDF

Characteristics of Runoff Variation due to Watershed Urbanization (유역의 도시화에 따른 유출변화특성)

  • Heo, Chang-Hwan
    • Journal of Korea Water Resources Association
    • /
    • v.36 no.5
    • /
    • pp.725-740
    • /
    • 2003
  • Urbanization concerned with concentration of population, activity and expanding the urban changes a natural environmental, and human activity in urban area causes the appearance of a new hydrologic cycle system. This study is carried out the analysis for the characteristics of runoff variation in urban areas with progress of urbanization. To simulate the mechanics of runoffs on small urban watershed, the ILLUDAS model is used in this study. From the analysis of the urban-runoff processes in small urban area with the progress of urbanization, the following conclusions is obtained. It is found in the results of calculated geographical parameter that peak time is quickened by 15∼35 minutes rather than the urbanization before. Also, in the analysis of the peak rate of runoff, the peak flow rise by 60 % than the urbanization before.

Prediction of the Pollutant Loading into Estuary Lake according to Non-cultivation and Cultivation conditions of Reclaimed Tidal Land (담수호 유입 오염부하량의 간척농지 영농 전.후 변화 예측)

  • Yoon, Kwang-Sik;Choi, Soo-Myung;Yang, Hong-Mo;Han, Kuk-Heon;Han, Kyung-Soo
    • Journal of Korean Society of Rural Planning
    • /
    • v.7 no.1 s.13
    • /
    • pp.27-36
    • /
    • 2001
  • Estimation of current and future loading from watershed is necessary for the sound management of water quality of an estuary lake. Pollution sources of point and non-point source pollution were surveyed and Identified for the Koheung watershed. Unit factor method was used to estimate potential pollutant load from the watershed of current conditions. Flow rate and water qualify of base flow and storm-runoff were monitored in the main streams of the watershed. Estimation of runoff pollutant loading from the watershed into the lake in current conditions was conducted by GWLF model after calibration using observed data. Prospective pollutant loading from the reclaimed paddy fields under cultivation conditions was estimated using the modified CREAMS model. As a result, changes of pollutant loading into estuary lake according to non-cultivation and cultivation conditions of reclaimed tidal land were estimated.

  • PDF

Watershed Selection for Diffuse Pollution Management Based on Flow Regime Alteration and Water Quality Variation Analysis (유황분석과 수질변화 평가를 통한 비점오염원 관리대상지역 선정방법 연구)

  • Jung, Woohyeuk;Yi, Sangjin;Kim, Geonha;Jeong, Sangman
    • Journal of Korean Society on Water Environment
    • /
    • v.27 no.2
    • /
    • pp.228-234
    • /
    • 2011
  • The goal of water quality management on stream and watershed is to focus not on discharged loads management but on a water quality management. Discharged loads management is not goal of water quality management but way for perform with total maximum daily loads management. It is necessary to estimate the relation between non-point source with stromwater runoff (NPSSR) and water quality to select a watershed where it is required to manage NPSSR for water quality improvement. To evaluate the effects of NPSSR on stream's water quality, we compare the aspects of water quality in dry and wet seasons using flow duration curve analysis based on flow rate variation data by actual surveying. In this study we attempt to quantify the variation characteristic of water quality and estimate the Inflow characteristic of pollution source with water quality and flow rate monitoring on 10 watersheds. We try to estimate water quality and flow rate by regression analysis and try again regression analysis with each high and low water quality data more than estimations. An analysis of relation between water quality and flow rate of 10 watersheds shows that the water quality of the Nonsan and the Ganggyeong streams had been polluted by NPSSR pollutants. Other eight streams were important point source more than NPSSR. It is wide variation range of $BOD_5$ also high average concentration of $BOD_5$. We have to quantify water quality variation by cv1 in wet season and cv365 in dry season with comparing the estimate of high water quality and low water quality. This method can be used to indicator for water quality variation according to flow rate.

Evaluation and complementation of observed flow in the Hancheon watershed in Jeju Island using a physically-based watershed model (유역모형을 활용한 제주도 한천 유역의 관측유량 평가 및 보완)

  • Kim, Chul Gyum;Kim, Nam Won
    • Journal of Korea Water Resources Association
    • /
    • v.49 no.11
    • /
    • pp.951-959
    • /
    • 2016
  • This study was conducted to evaluate observed runoff data collected every 10 minutes at stream gauging stations in Jeju Island using a physically-based model, SWAT. The Hancheon watershed was selected as study area, and ephemeral stream algorithm suggested by previous research was incorporated into the model, which is able to simulate ephemeral runoff pattern of Jeju streams. Simulated runoff and runoff rates were compared to observations during 2008-2013, which showed 'very good' performance rating in Nash-Sutcliffe model efficiency (ME) and determination coefficient ($R^2$). Some observations had problems such that runoff rates were very high for some rainfall events with little amount of antecedent rainfall, and were very low or missing with much rainfall comparing to previous researches. Additionally, regression equation between precipitation and simulated runoff was generated with high degree of correlation. The equation can be utilized to simply predict reasonable runoff, or to investigate and complement the abnormal or missing data of observations on the assumption that modelling results were sufficiently reliable and satisfactory. As results, minimizing the error in calibrating the model by evaluation of observed data would be helpful to accurately model the rainfall-runoff characteristics and analyze the water balance components of watersheds in Jeju Island.

Estimation of Trigger Rainfall for Threshold Runoff in Mountain River Watershed (산지하천 유역의 한계유출량 분석을 위한 기준우량 산정)

  • Kim, Dong Phil;Kim, Joo Hun;Lee, Dong Ryul
    • Journal of Wetlands Research
    • /
    • v.14 no.4
    • /
    • pp.571-580
    • /
    • 2012
  • This study is on the purpose of leading Geomorphoclimatic Instantaneous Unit Hydrograph(GcIUH) by using GIS Techniques, and estimating trigger rainfall for predicting flash flood in Seolmacheon catchment, mountain river watershed. This study leads GcIUH by using GIS techniques, calculates NRCS-CN values for effective rainfall rate, and analyzes 2011 main rainfall events using estimated GcIUH. According to the results, the case of Memorial bridge does not exceed the amount of threshold runoff, however, the case of Sabang bridge shows that simulated peak flow, approximately $149.4m^3/s$, exceeds the threshold runoff. To estimate trigger rainfall, this study determines the depth of 50 year-frequency designed flood amount as a threshold water depth, and estimates trigger rainfall of flash flood in consideration of duration. Hereafter, this study will analyze various flood events, estimate the appropriateness of trigger rainfall as well as threshold runoff through this analysis, and develop prototype of Flash Flood Prediction System which is considered the characteristics of mountain river watershed on the basis of this estimation.

Comparison of Artificial Neural Network Model Capability for Runoff Estimation about Activation Functions (활성화 함수에 따른 유출량 산정 인공신경망 모형의 성능 비교)

  • Kim, Maga;Choi, Jin-Yong;Bang, Jehong;Yoon, Pureun;Kim, Kwihoon
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.63 no.1
    • /
    • pp.103-116
    • /
    • 2021
  • Analysis of runoff is substantial for effective water management in the watershed. Runoff occurs by reaction of a watershed to the rainfall and has non-linearity and uncertainty due to the complex relation of weather and watershed factors. ANN (Artificial Neural Network), which learns from the data, is one of the machine learning technique known as a proper model to interpret non-linear data. The performance of ANN is affected by the ANN's structure, the number of hidden layer nodes, learning rate, and activation function. Especially, the activation function has a role to deliver the information entered and decides the way of making output. Therefore, It is important to apply appropriate activation functions according to the problem to solve. In this paper, ANN models were constructed to estimate runoff with different activation functions and each model was compared and evaluated. Sigmoid, Hyperbolic tangent, ReLU (Rectified Linear Unit), ELU (Exponential Linear Unit) functions were applied to the hidden layer, and Identity, ReLU, Softplus functions applied to the output layer. The statistical parameters including coefficient of determination, NSE (Nash and Sutcliffe Efficiency), NSEln (modified NSE), and PBIAS (Percent BIAS) were utilized to evaluate the ANN models. From the result, applications of Hyperbolic tangent function and ELU function to the hidden layer and Identity function to the output layer show competent performance rather than other functions which demonstrated the function selection in the ANN structure can affect the performance of ANN.

Modification of TOPMODEL Considering Spatial Connectivity of Saturated Area (공간적 포화면적의 공간적 연결을 고려한 TOPMODEL의 개선과 적용)

  • Kim, Sang-Hyeon;Kim, Gyeong-Hyeon
    • Journal of Korea Water Resources Association
    • /
    • v.32 no.5
    • /
    • pp.515-524
    • /
    • 1999
  • A methodology to resolve a TOPMODEL problem has been suggested, which is associated with the spatial distribution of soil moisture behaviour in a runoff mechanism. A procedure to integrate the spatial information of saturation deficit in the TOPMODEL reflects the connectivity of saturated area in a watershed. The developed algorithm includes an improved basis in tracing the runoff path without increasing the number of parameters. The performance of the developed algorithm has been tested to an upland subwatershed, namely Dongok, which is the IHP watershed located at Wichon, Korea. Comparing with the original statistical version of the TOPMODEL, it has been found that the suggested algorithm can relax an overestimation of peak rate in the runoff simulation.

  • PDF