• 제목/요약/키워드: Watershed Management

검색결과 1,162건 처리시간 0.019초

농촌 소유역 수환경 개선을 위한 유역관리 협의체 구성방안 - 함평천 사례를 중심으로 - (Framework of Watershed Management Organization Consortium for Water Environment Improvement of Small Rural Watershed)

  • 이기완;김영주;윤광식
    • 농촌계획
    • /
    • 제11권4호
    • /
    • pp.59-65
    • /
    • 2005
  • Proper management of small rural watershed is important since it does affect water quality improvement of larger scale watershed. Therefore, effective small watershed management guideline including participatory program of local people is required to achieve water environment improvement. Feasibility of water quality goal, short and long-term watershed management plan and funding sources were investigated by field monitoring of Hampyungchun watershed which has characteristics of rural stream, and literature review. The relevant parties and their roles fer watershed management were identified and suggested. A hybrid model, that is mixture of government driven model and NGO model, is recommended for watershed management organization in this study.

수계 오염총량관리제와 환경영향평가제도의 통합운영방안 (Integration of Total Pollution Load Management System and Environmental Impact Assessment related System)

  • 이종호
    • 환경영향평가
    • /
    • 제12권5호
    • /
    • pp.359-367
    • /
    • 2003
  • The total pollution load management system of watershed has been implemented upon Special Law pertaining to the Han River Watershed Water Quality Improvement and Residents Support, Special Law pertaining to the Nakdong River Watershed Water Management and Residents Support, Special Law pertaining to the Youngsan River Watershed Water Management and Residents Support, and Special Law pertaining to the Seomjin River Watershed Water Management and Residents Support in Korea since 2002. But many other similar systems with total pollution load management system of watershed are being operated separately or independently, even though its purpose is nearly same with those of the total maximum pollutants load management in Law on Water Quality Environmental Protection, environmental impact assessment(EIA) in Law of Impact Assessment on Environment, Transportation and Disaster and Pre-environmental assessment of Environmental Policy Act. Therefore the contents of total pollution load management system of watershed and many other related systems could be overlapped and at some times have inconsistency among them. This study suggests first the integrated operation of total pollution load management system of watershed, EIA, pre-environmental assessment, urban planning, and sewage planning and secondly EIA system development by integration of EIA and pre-environmental assessment and strategic environmental assessment(SEA).

유역모형을 이용한 유량조건별 배출계수 산정 및 활용방안 연구 (Study on Estimation and Application of Discharge Coefficient about Nonpoint Source Pollutants using Watershed Model)

  • 황하선;이한필;박지형;김용석;이성준;안기홍
    • 한국물환경학회지
    • /
    • 제31권6호
    • /
    • pp.653-664
    • /
    • 2015
  • TPLMS (Total water pollutant load management system) that is the most powerful water-quality protection program have been implemented since 2004. In the implementation of TPLMS, target water-quality and permissible discharged load from each unit watershed can be decided by water-quality modeling. And NPS (Non-point sources) discharge coefficients associated with certain (standard) flow are used on estimation of input data for model. National Institute of Environmental Research (NIER) recommend NPS discharge coefficients as 0.15 (Q275) and 0.50 (Q185) in common for whole watershed in Korea. But, uniform coefficient is difficult to reflect various NPS characteristics of individual watershed. Monthly NPS discharge coefficients were predicted and estimated using surface flow and water-quality from HSPF watershed model in this study. Those coefficients were plotted in flow duration curve of study area (Palger stream and Geumho C watershed) with monthly average flow. Linear regression analysis was performed about NPS discharge coefficients of BOD, T-N and T-P associated with flow, and R2 of regression were distributed in 0.893~0.930 (Palger stream) and 0.939~0.959 (Geumho C). NPS Discharge coefficient through regression can be estimated flexibly according to flow, and be considered characteristics of watershed with watershed model.

오염총량관리 할당부하량 초과지역의 최종 평가기준에 관한 연구 (A Study on the Final Evaluation Criteria of Allocation Exceedance Regional in Total Maximum Daily Load)

  • 오승영;한미덕;김석규;안기홍;김옥선;김용석;박지형
    • 한국물환경학회지
    • /
    • 제32권5호
    • /
    • pp.450-457
    • /
    • 2016
  • The Total Maximum Daily Load (TMDL) is a watershed management system that involves the establishment of the target water quality, the calculation of permission loading (allocation loading), and the control of total pollutants for each unit watershed. Allocation loading is assessed through the comprehensive implementation assessment of the previous year's plan. Assessment results are used for follow-up management measures such as the limit of development and updating of TMDL Management Implementation Plans for the next planning period. Although detailed assessment criteria are important, they are not currently available. Therefore, we suggested assessment criteria by comparing two methods('integration method' and 'separation method') using combination point and non-point discharge loading. We also examined the penalty criteria considering controllable load local government and updating methods of the TMDL Management Implementation Plan for the next planning period.

수질오염총량관리를 위한 관리대상물질 (Applicable Water Quality Indicators for Watershed Management)

  • 박재홍;오승영;박배경;공동수;류덕희;정동일
    • 한국물환경학회지
    • /
    • 제22권6호
    • /
    • pp.1004-1013
    • /
    • 2006
  • To effective a watershed management, it is necessary to have one or more quantitative measures that can be used to evaluate the relationship between pollutant sources and their impact on water quality. Such measurable quantities are termed indicators. Once an indicator has been selected, a target value for that indicator must be established that seek to distinguish between the impaired and unimpaired state of the waterbody. Various factors will be considered for the selection of an appropriate watershed management indicator. For example, available data, application, management conditions, cost, etc. This paper lists various factors that should be addressed in choosing a watershed management indicators and investigates applicable indicators during watershed management period.

BASINS-SWAT 모델을 이용한 경안천 유역의 비점원 오염배출 중점관리 대상지역 결정 (Decision of Critical Area Due to NPS Pollutant Loadings from Kyongan Stream Watershed using BASINS-SWAT)

  • 장재호;윤춘경;정광욱;손영권
    • 한국농공학회논문집
    • /
    • 제51권5호
    • /
    • pp.69-78
    • /
    • 2009
  • In order to improve water quality of upper watershed of Paldang reservoir, it is necessary to evaluate non-point source pollution loads and identify critical watershed pollution sources. A GIS based Soil and Water Assessment Tool was applied to evaluate model application and reliability, estimate NPS pollution load, identify critical watershed by NPS pollution sources, and suggest various best management practices for Kyongan Stream watershed. Yearly NPS pollution loads were estimated 30.0% SS, 60.1% TN and 35.4% TP, respectably. The watershed pollution load is mainly decided by precipitation condition and SS and nutrients load have a significant regression relationship. Based on 10-year average yearly NPS pollution load, critical sub-watersheds were identified. The No. 5 and 17 which have lots of relatively intensive agricultural fields and scattered industrial area were vary critical sub-watersheds and under more intensive pollution load. In order to control critical watershed, watershed best management practices such as scientific fertilizer, contour farming and parallel terrace, transferring the sloppy farmland to grass or forest and constructing a buffer zone, and constructing wetlands and retention ponds will be applied. Overall the SWAT model can be efficiently used for identification of critical sub-watersheds in order to develop a priority watershed management plan to reduce water pollutions.

주민참여형 유역관리를 위한 하천모니터링 활동의 적용가능성 연구 - 무심천유역을 대상으로 - (A study on the application of River Monitoring Activities for Residents Participatory Watershed Management - Focusing on the Musim River Basins -)

  • 이은정
    • 환경영향평가
    • /
    • 제26권1호
    • /
    • pp.57-67
    • /
    • 2017
  • 최근 우리나라 유역관리정책을 보면, 조류 중점관리 지류 선정, 지류총량제 시범적용 등 중앙정부 주도의 본류중심 관리에서 소단위 지류 지천 관리를 위한 기반을 마련하고 있다. 이러한 시점에 발맞춰 소단위 하천을 대상으로 일상적, 자발적, 맞춤형 관리가 가능하도록 주민참여형 유역관리방안을 설계 및 제안한 후, 주민이 참여하는 하천모니터링 활동을 무심천유역에 시범적으로 적용해 보았다. 총 30개 구간으로 구분하여 주민 1명씩 배치하여 격주로 총 10회동안 모니터링을 수행한 결과, 문서화되지 않은 실제 유역현황을 파악할 수 있었다. 특히, 사각지대의 오염원 실태를 통해 소단위유역별 관리의 필요성을 확인할 수 있었으며, 이러한 조사 내용이 각종 계획에 반영될 수 있는 상향식 접근이 가능한 발판을 마련하는 것이 유역관리를 위한 선행조건으로 판단된다.

Evaluation and improvement of forest watershed management projects in Korea

  • Rhee, Hakjun
    • 농업과학연구
    • /
    • 제47권4호
    • /
    • pp.885-901
    • /
    • 2020
  • A forest watershed management project was introduced in 2004 to develop ecologically sound forest watersheds. It includes landslide prevention and erosion control, water resource management, landscape development, and forest resource management. However, it has been managed fragmentarily and inefficiently, far from the original intents. This study investigated current status, problems, and improvement measures of the project. Literature reviews were conducted on forest watershed management in Korea and other countries, and surveys were conducted on 201 erosion control experts. When introduced, the forest watershed management project was well planned and implemented as intended. It later turned to focus only on disaster prevention such as erosion control dams and stream conservation measures. The survey results showed that a majority (89% and 86%) of surveyees wanted increases in the project period and budget. They also responded that conflicts with local residents (51%) and determining project locations (32%) were the most difficult tasks when implementing the projects, and only 36% kept project records. To plan and implement the projects as intended, the following suggestions should be considered: (1) establishment of a solid legal foundation and improvement of the erosion control practices law; (2) increase in the project period (from 1 to 2 - 3 years) and budget; (3) development of a manual for project site selection and guidelines; (4) monitoring and systematic information management; and (5) development of spatial analysis tools for watershed analysis and management.

최적화 모델을 이용한 경제적인 총량관리 할당기법 연구 (The Allocation Methods for Economical Efficiency Using an Optimized Model)

  • 최인욱;신동석;김홍태;박재홍;안기홍;김용석
    • 한국물환경학회지
    • /
    • 제31권3호
    • /
    • pp.295-303
    • /
    • 2015
  • In Korea, Total Maximum Daily Loads(TMDLs) has been enforced to restore and manage water quality in the watersheds. However, some assesment of implementation plan of TMDLs showed that the achievement of the target water quality is not related to the proper allocation loads because difference of flow duration interval. In the United States, the discharge loads are determined by water quality modeling considering standard flow conditions according to purpose. Therefore, this study tried to develop the allocation method considering economical efficiency using water quality model. For this purpose, several allocation methods being used in the management of TMDLs is investigated and develope an allocation criteria considering regional equality and uniformity. Since WARMF(Watershed Analysis Risk Management Framework) model can simulate the time varying behavior of a system and the various water quality variables, it was selected for a decision support system in this study. This model showed fairly good performance by adequately simulating observed discharge and water quality in Miho watershed. Furthermore, the scenario simulation results showed that the effect of annual average water quality improvement to remove 1kg BOD is more than 25 times, even if point pollutants treatment facility is six times more expensive to operate than non-point pollutants treatment facility.

비모수 경향분석법 적용을 통한 금강수계 총량관리 단위유역의 수질변화 연구 (A Study on the Water Quality Changes of TMDL Unit Watershed in Guem River Basin Using a Nonparametric Trend Analysis)

  • 김은정;김용석;류덕희;류지철;박배경
    • 한국물환경학회지
    • /
    • 제30권2호
    • /
    • pp.148-158
    • /
    • 2014
  • In order to assess the effect of TMDLs management and improve that in the future, it is necessary to analyze long-term changes in water quality during management period. Therefore, long term trend analysis of BOD was performed on thirty monitoring stations in Geum River TMDL unit watersheds. Nonparametric trend analysis method was used for analysis as the water quality data are generally not in normal distribution. The monthly median values of BOD during 2004~2010 were analyzed by Seasonal Mann-Kendall test and LOWESS(LOcally WEighted Scatter plot Smoother). And the effect of Total Maximum Daily Loads(TMDLs) management on water quality changes at each unit watershed was analyzed with the result of trend analysis. The Seasonal Mann-Kendall test results showed that BOD concentrations had the downward trend at 10 unit watersheds, upward trend at 4 unit watersheds and no significant trend at 16 unit watersheds. And the LOWESS analysis showed that BOD concentration began to decrease after mid-2009 at almost all of unit watersheds having no trend in implementation plan watershed. It was estimated that TMDLs improved water quality in Geum River water system and the improvement of water quality was made mainly in implementation plan unit watershed and tributaries.