• Title/Summary/Keyword: Watering system

Search Result 52, Processing Time 0.017 seconds

Study on the Establishment of Project Duty of Water and Facility Capacity in Upland Irrigation - On the Estimation of Duty of Water for the Upland Crops by the Measurement of Evapotranspiration - (밭 관개의 계획용수량 및 시설용량의 정립에 관한 연구 -증발산량 실측에 의한 밭용수량의 추정에 관하여-)

  • 김시원;김선주
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.30 no.4
    • /
    • pp.23-44
    • /
    • 1988
  • The evaportranspiration of upland crops was measured by four types of lysimeter and water consumption characteristics together with the optimum irrigation point by the crops was defind. Among the evapotranspiration estimation formulas, the constant of wind function in the modified Penman equation was corrected to agree with the meteorological conditions of Korea. The evapotranspiration of the crops in the project standard year was estimated according to the cropping system of the project area in Chungju, and from the estimated evapotras - spiration, net duty of water per one time and irrigation in tervals were investigated. The results obtained are summarized as follows: 1. The evapotranspiration of the same crop measured at the same plot was slightly different by the lysimetric methods, and among the four types of lysimeter, the accuracy of the floating lysimeter was the highest. 2. The yields among the watering treatments showed the significance of 5% in the expe- riment with red cabbage and Chinese cabbage, and significance of 1% in the crisphead lettuce, and the optimum irrigation point for the tested crops was defined ad pF 2.0 by the least squre difference test. 3. The evapotranspiration of the crops in the mid-season stage showed maximum among the growing stages, and the average daily evapotranspiration by the crops over the growing seasons of cabbage, crisphead lettuce, Chinese cabbage, summer cucumber, tornato, salary and autumn cucumber was 4.18mm, 4.77mm, 3.9qrnm, 5.68mnn, joonim, 4.26mm and 3.3qrnn, respectively. 4. From the investigated soil moisture extration pattern(SMEP) of the crisphead lettuce, cucumber and tomato, the proportion of the first layer in the initial stage showed over so%, and the SMEP of the lowest fourth layer during the late-season stage in the experiment cabbage and Chinese cabbage was 15.8% and 16.9, respectively, with showed that the root elongated th the lowest soil layer. 5. The total available moisture(TAM) of clay loam was 21.2-23.3mm and that of sandy loam was 16.1 - 19.0mm under the optimum irrigation point of pF. 2.0, and the total readily available moisture( TRAM) of the crops cultivated in the clay loam soil was larger than that cultivated in the sandy loam soil, and the TRAM during the mid-and late-season were larger than that of the inital and crop development stage. 6. The estimated evapotranspration by the corrected Pennam equation, whkh corrected the constant of the wind function in the modified Penman equation, was nearly agreed with the actually measured evaporanspiration of grass. 7. Among the several evaportranspiration estimation methods, the evapotranspiration es- timated by the corrected Pennam equation was closed to the actual evapotranspiration of reference crop (grass) evapotranspiration, therefore it is suggested to use the corrected Penman equation to determine the duty of water of corps. 8. The average crop coefficient (Kc) of cabbage by the corrected Penman equation was 0.94 and that of crisphead lettuce, summer cucumber, tomato, salary, Chinese cabbage and autumn cucumber was 1.07, 1.22, 1.02, 1.01, 1.35, 1.09, respectively 9. The estimated total evapotranspiration of cabbage in the project area( Chungju) by the corrected Penman equation was 223.9mm and that of crisphead lettuce, Chinese cabbage, summer cucumber, tomato, salary and auturun cucumber was 215.7mm, 205.9mm, 359.Omrn, 300.9mm, 332.lmm and 202.7mm, respectively. 10. The net duty of water per one time of the crops cultivated in the sandy loam soil, and the net duty of water per one time in the mid-season & late-season showed larger than that of the initial stage. 11. The shortest irrigation interval of cabbage in the project area was 4.2 days, and that of crisphead lettuce, Chinese cabbage, cucumber, tomato and salary was 1.2days, 2.3days, 1.8days, 2.2days and 2.7days, respectively.

  • PDF

A Study on Improvement Methods of Cost Estimation in Order for the Proper Management of Street Trees (도시 가로수 관리 품셈 개선에 관한 연구)

  • Do, Yoon-Taek;Han, Bong-Ho;Park, Seok-Cheol
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.50 no.4
    • /
    • pp.20-36
    • /
    • 2022
  • This study aims to provide basic data for high-quality street tree management by setting reasonable management items and appropriate unit prices by reviewing the adequacy of current street tree management. Currently, street tree management items, except for street tree pruning, use general landscape tree quantity per unit for the street tree management quantity per unit. KEPCO (Korea Electric Power Corporation) applied pruning items from standard electric production infrastructure and carried out the activities at an average unit price of 51% lower for heavy pruning and 39% lower for light pruning than the standard estimate. This was judged to be a level that could not maintain or increase the quality of street tree management. It was determined that an appropriate standard unit price for street tree management was necessary. To improve the quantity per unit for the proper management of street trees, it was necessary to review costs in the field. However, due to the absence of data on actual construction costs in the domestic landscape field, detailed items of the US RSMeans Building Construction Cost Data (RSMeans) were reviewed, and the actual construction costs were calculated by applying personal domestic expenses. As a result, the standard of the estimated unit showed a good ratio of 107% for heavy pruning of street tree pruning compared to the actual construction cost, but light pruning was underestimated with a 59% ratio. Shrub pruning was 82%, weeding was 92%, tree fertilization was 87%, and windbreak wall installation was 91% under-engineered. In addition, it was also confirmed that the watering by sprinkler trucks and chemical spraying were over-designed compared to the actual construction cost at the rates of 118% and 124%, respectively. Due to the specificity of the street trees, the increase in personal expenses and the input cost of equipment, such as road safety controls, were judged to be the main cause of the underestimation of items. Therefore, it is necessary to add items related to street trees and general landscape trees to the landscape maintenance items of the standard of the estimated unit.