• 제목/요약/키워드: Water treatment plant

검색결과 2,071건 처리시간 0.028초

LAND FARMING OF WATER PLANT ALUM SLUDGE ON ACID MINERAL SOIL AFFECTED BY ACID WATER

  • Lee, Seung-Sin;Kim, Jae-Gon;Moon, Hi-Soo;Kang, Il-Mo
    • 한국지하수토양환경학회:학술대회논문집
    • /
    • 한국지하수토양환경학회 2001년도 총회 및 춘계학술발표회
    • /
    • pp.182-186
    • /
    • 2001
  • An acid forest surface soil as a land farming medium was treated with a water plant alum sludge at 0 to 18%. Indian mustard was grown in the treated soil in a greenhouse for 5 weeks and watered with pH 4 tap water adjusted with a mixed acid (1HNO$_3$: 2H$_2$SO$_4$) during plant growth. Changes in soil property, leachate chemistry, plant growth, and plant uptake of elements by the sludge treatment were determined. The alum sludge treatment increased buffer capacity to acidity, hydraulic conductivity, water holding capacity, and phosphate adsorption of the soil and decreased bulk density and mobility of small particles. The sludge treatment reduced leaching of Al, Mg, K, Na, and root elongation. Plant did uptake less amount of the cations and P but more Ca with the sludge treatment.

  • PDF

기존 하수처리장 성능개선을 위한 NPR공정의 적용 (An Application of the NPR Process for the Treatability Improvement of an Existing Sewage Treatment Plant)

  • 문태훈;고광백;송의열
    • 한국물환경학회지
    • /
    • 제23권5호
    • /
    • pp.756-760
    • /
    • 2007
  • Most of the sewage treatment plants in Korea are being operated by using the conventional activated sludge process. Recently, as the water criteria have been strict with regard to such main culprits of eutrophication, the existing sewage treatment plants are obliged to upgrade their treatment technology to meet the criteria. Under such circumstances, this study was aimed at analyzing the conditions of an existing sewage treatment plants in Korea, and thereupon, test its treatment performance for the actual sewage water by operating a pilot plant. When the pilot plant was operated with the NPR process at the capacity of $30m^3/day$, the average contents of BOD, $COD_{Mn}$, SS, T-N and T-P in the effluents were 7.0 mg/L, 9.7 mg/L, 5.1 mg/L, 8.0 mg/L and 0.23 mg/L, respectively, which were very stable in general. Accordingly, if the NPR process used for this pilot plant to upgrade the treatment technology for the sewage treatment plat could be adopted, the effluent water quality criteria effective beginning from 2008 would be met.

정수장내 염소요구량 자동결정시스템 개발 (Development of Automatic Decision System for Chlorination Demand in Water Treatment Plant)

  • 오석영
    • 대한기계학회논문집B
    • /
    • 제26권6호
    • /
    • pp.757-764
    • /
    • 2002
  • Chlorination dosage in water treatment plant of field is determined by chlorination demand experiment through two or three hours after raw water was sampled in inflow. It is impossible to continuously control for real time because the sampled water is adapted chlorination dosage after water treatment process had been proceeded. Therefore in this study, we will design informal chlorination demand system, this designed system will be experimented as to water quality and accuracy of control in various conditions. Throughout these experimental results, we will revise the system and the revised system is enable to optimal control of chlorination dosage. Finally, we have developed chlorination demand system, which can automatically determination of chlorination dosage to be determined according to variety of raw water quality inflow in water treatment plant.

정수장내 염소요구량 자동결정시스템 개발 (Development of Automatic Decision System for Cholrination Demand in Water treatment Plant)

  • 오석영;이성룡
    • 대한기계학회:학술대회논문집
    • /
    • 대한기계학회 2000년도 춘계학술대회논문집B
    • /
    • pp.807-812
    • /
    • 2000
  • Chlorination dosage in water treatment plant of field is determined by chlorination demand experiment through two or three hours after raw water was sampled in inflow. It is impossible to continuously control fer real time because sampled water is adapted chlorination dosage after water treatment process had been proceeded. Therefore in this study, we will design informal chlorination demand system this designed system will be experimented as to water quality and accuracy of control in various conditions. Throughout these. experimental results, we will revise the system and revised system is enable to optimal control of chlorination dosage. Finally, We have developed chlorination demand system, which can automatically determination of chlorination dosage to be determined according to variety of raw water quality inflow in water treatment plant.

  • PDF

고도 정수처리장에서의 과불화합물 거동 (Behavior of perfluorinated compounds in advanced water treatment plant)

  • 임채승;김형준;한개희;김호;황윤빈;김극태
    • 상하수도학회지
    • /
    • 제34권5호
    • /
    • pp.323-334
    • /
    • 2020
  • Adsorption by granule activated carbon(GAC) is recognized as an efficient method for the removal of perfluorinated compounds(PFCs) in water, while the poor regeneration and exchange cycles of granule active carbon make it difficult to sustain adsorption capacity for PFCs. In this study, the behavior of PFCs in the effluent of wastewater treatment plant (S), the raw water and the effluents of drinking water treatment plants (M1 and M2) located in Nakdong river waegwan watershed was monitored. Optimal regeneration and exchange cycles was also investigated in drinking water treatment plants and lab-scale adsorption tower for stable PFCs removal. The mean effluent concentration of PFCs was 0.044 0.04 PFHxS g/L, 0.000 0.00 PFOS g/L, 0.037 0.011 PFOA g/L, for S wastewater treatment plant, 0.023 0.073 PFHxS g/L, 0.000 0.00 PFOS g/L, 0.013 0.008 PFOA g/L for M1 drinking water treatment plant and 0.023 0.073 PFHxS g/L, 0.000 0.01 PFOS g/L, 0.011 0.009 PFOA g/L for M2 drinking water treatment plant. The adsorption breakthrough behaviors of PFCs in GAC of drinking water treatment plant and lab-scale adsorption tower indicated that reactivating carbon 3 times per year suggested to achieve and maintain good removal of PFASs. Considering the results of mass balance, the adsorption amount of PFCs was improved by using GAC with high-specific surface area (2,500㎡/g), so that the regeneration cycle might be increased from 4 months to 10 months even if powdered activated carbon(PAC) could be alternatives. This study provides useful insights into the removal of PFCs in drinking water treatment plant.

대규모 해수담수화 플랜트에서의 전처리공정 비용 분석 (Cost comparison of pretreatment processes in large SWRO desalination plant)

  • 김영민;김진호;이상호;이창규;박광덕;최준석
    • 상하수도학회지
    • /
    • 제27권5호
    • /
    • pp.555-560
    • /
    • 2013
  • A cost analysis method for pretreament processes of a large scale seawater desalination plant was considered using a cost estimation model, WaTER (Water Treatment Estimation Routine). This model is based on cost functions of U.S. EPA to conduct economic analysis of water treatment facilities. A virtual seawater desalination plant which has pretreatment production capacity of $100,000m^3$ per day was chosen as a model plant. Dual media filtration and microfiltration systems were compared as pretreatment process, and the following reverse osmosis process was modeled. As a result, microfiltration showed a price competitiveness in condition of operating with reverse osmosis process by reducing the loads of water treatment and membrane cleaning despite it's high annual cost.

Model based control of filter run time on potable water treatment plant

  • Jusic, Suvada;Milasinovic, Zoran
    • Coupled systems mechanics
    • /
    • 제4권2호
    • /
    • pp.157-172
    • /
    • 2015
  • Control of potable water treatment plant (PWTP) is nowadays based on experience. The aim of this article is to show that model based control of treatment process is more efficient than process operation based on experience. Stimela environment is used for modeling of processes of potable water treatment. Application of the model was conducted on PWTP "Crkvice" in Zenica (BiH). This plant has used conventional rapid sand filters. By effective application of the model it is determined the optimal filter run time for different input turbidity of raw water. This results in the possibility of reducing the consumption of backwashing water, lower costs for its pumping and reducing the amount of coagulants. In the existing practice, based on experience, these benefits are not used.

황토와 석회의 혼합처리에 의한 정수 슬러지의 개질화에 관한 연구 (Loess and Lime Treatment for Modification of Waterworks Sludges)

  • 임성진;조재준;이재복
    • 상하수도학회지
    • /
    • 제14권4호
    • /
    • pp.318-327
    • /
    • 2000
  • Sludge production from water treatment plants is increasing each year because water resources deterioration is proceeding and water supply facilities are growing due to water demand increase. Water treatment plant sludges can be modified to soil cover in sanitary landfilling site through the lime treatment and other alternatives. The compression strength of $1.0kg/cm^2$ is necessary for the dozer operation on soft son cover material at municipal landfilling site. Modified sludge was experimentally produced in this study with lime, bentonite, loess, and activated loess dosing. X-ray diffraction patterns of the limed water treatment plant sludge confirmed the presence of calcium carbonate and ettringite. Unconfined compression strength properties of modified sludges showed material property improvement applicable for soil cover alternatives. When adding 20-30% activated loess to water treatment plant sludges. the modified sludges could reach the compression strength for cover soil after 7 days solidification reaction, but decrease of compression strength was intentioned in 28 days reaction period. Solidification effect of the modified sludge with activated loess was observed through the scanning electron microscope.

  • PDF

식생피도가 식생여과대의 질소 및 인 처리효율에 미치는 영향 (Effect of Plant Coverage on the Treatment Efficiency of Nitrogen and Phosphorus in Vegetative Filter Strips)

  • 이병수;길경익
    • 한국물환경학회지
    • /
    • 제24권4호
    • /
    • pp.499-503
    • /
    • 2008
  • In order to control the non-point source pollution, a vegetative filter strips (VFS) was set up and the site-monitoring was performed. The objective of this study is to investigate the influence of the plant coverage on treatment efficiency of total nitrogen (T-N) and total phosphorus (T-P) using vegetative filter strips. According to the results, it seemed that the treatment efficiencies of T-N and T-P were closely related with the plant coverage ratio. The results showed that treatment efficiency of T-P average 50% at higher than 50% of the plant coverage and 20~23% at lower than 50% of the plant coverage. Also, the treatment efficiency of T-N increased with the increase of the plant coverage ratio.

취수원별 정수장 슬러지의 물리화학적 특성 (Characteristics of water treatment plant sludges on raw water source)

  • 문용택;김병군
    • 환경위생공학
    • /
    • 제21권3호
    • /
    • pp.37-43
    • /
    • 2006
  • Recently, needs for reuse of sludge produced from WTP(water treatment plant) have been increased with shortage of landfill sites and difficulties of the treatment and disposal processes. Therefore, Reusing is becoming an Increasingly popular waste management alternative to divert waste from landfills. In order to research the characteristics of WTP sludges, we used the sludges of C WTP which intake the lake Dae-Cheong and the sludges of S WTP which intake Keum river, The specific surface area of C and S WTP sludges were $0.9986m^2/cc\;and\;1.874m^2/cc$, respectively. The gravity was about $2.0{\sim}2.4$ which are scope of peat or loamy clay. The major minerals of C WTP sludges were kaolinite(48.4%), muscovite(19.5%), and quartz(16.7%). Also, muscovite(31.6%), quartz(30.3%), and kaolinite(17.3%) in S WTP sludges were major minerals.