• Title/Summary/Keyword: Water supply pipeline

Search Result 93, Processing Time 0.017 seconds

A Study on the Fire Prevention Activities and Suppression Measures of Utility-Pipe Conduit (지하공동구 화재예방활동 및 진압대책에 관한 연구)

  • Lee, Jung-Il
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.10 no.4
    • /
    • pp.63-68
    • /
    • 2010
  • Utility-Pipe Conduit is, Housing and city effectively accommodate what they absolutely need power, communications, gas, pipeline, water supply, drainage, energy facilities etc, according to expansion of urban infrastructure are derived, several ways to solve problems in, collection facilities in place are maintained and managed facility. If Utility-Pipe Conduit is damaged, as well as national security, because their impact on society as a whole, by introducing large vulnerability in the fire prevention activities and suppression measures and disaster for our situation by introducing measures, comprehensive analysis of the fire risk, it shall establish fire prevention activities and suppression through analysis of Utility-Pipe Conduit design, institutional issues, the problem of fire protection facilities, fire spread phenomenon etc. Because of Utility-Pipe Conduit is an enclosed place, so incomplete combustion due to lack of oxygen supply that there are problem such dark smoke, carbon monoxide etc, toxic combustion products and heat generation and visual impairment is an issue difficult to enter. As well as fire prevention activities, the fire In light of the particularity of the under ground than above ground fire, so this phenomenon is weak fire fighting that fire to become effective fire fighting tactics, basically it is necessary difficulty softening, non-burn softening and prevent combustion expansion of the cable is installed on the Utility-Pipe Conduit, having to considering the specificity of the response command system and relevant organizations to establish an on-site, Structural identification and other information gathering required to record of Response agencies, keep air conditioning system 24 hours and strengthening Virtual Total Training of Response agen

Estimation of the Optimum Number of Machines and Equipments for Professional Dairy Farm (낙농 전업농의 기계장치 최적 규모 추정)

  • 유병기;이용범;장진택;이동현;권두중;기광석;성시흥;이대원
    • Journal of Animal Environmental Science
    • /
    • v.2 no.1
    • /
    • pp.27-39
    • /
    • 1996
  • A survey was conducted for dairy farmer to estimate the optimum number of machine and equipment in 1994. Labor hours, operation costs and operation methods for each dairy processing were investigated and analyzed for the farmers to find the expected numbers of machine and equipment on the basis of the desired farm scale. And also, the estimated models were compared and analyzed with the conventional models which more than half dairy farmers used bucket milker in tie stall barn. Some of the results are as follows : 1. Analysis results of conventional model showed that a dairy farm could raise to 15 heads of dairy cow with family labor of 1.5 men, labor hours of 2, 700 in you and total operation costs of 734 thousand won per head. 2. The result, used in conjunction with minimum operation costs in tie stall barn, showed that 28 dairy cows could be raised by using concentrates feeding by hoppers, water supply by water cups, milking by pipeline milker, and manure cleaning by barn cleaner with total operation costs of 520 thousands won per head. 3. The total operation costs of a loose barn system is higher than those of tie stall barn system to raise about 30 heads. For the loose barn system, the herringbone parlour was used for milking, concentrate feeding by automatic concentrate feeder, water supply by thermal insulation feeder, and manure cleaning by scraper with total operation costs of 582 thousands won per head every year.

  • PDF

A numerical study on the characteristics of small underground cavities in the surrounding old water supply and sewer pipeline (노후 상하수관 주변지반의 소규모 지하공동 형상 특성을 고려한 수치해석에 관한 연구)

  • An, Joon-Sang;Kang, Kyung-Nam;Song, Ki-Il;Kim, Byung-Chan
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.2
    • /
    • pp.287-303
    • /
    • 2018
  • In recent years, the occurrence of ground subsidence phenomenon is frequent in Korea. The Korean government has enacted a special law on underground safety and the law will be enforced from January 1, 2018. Under this new law, underground excavation should be assessed for underground safety impacts. After excavation construction, periodic geophysical surveys should be conducted to investigate the occurrence of underground cavities. When underground cavities were discovered, the underground safety was assessed through numerical analysis. However, it is controversial because the method of numerical modeling the discovered underground cavity is due to be established. In this study, the effect of the depth of the underground cavity from the shape of the underground cavity to the underground cavity was studied using a continuum analysis program. In this study, a method to reflect the shape of the underground cavity to the numerical modeling is presented. The relationship between the shape and depth of the underground cavity, and the factor of safety calculated by the shear strength reduction method (SSR) is presented. The results of this study are expected to form the basic data on underground safety impact assessment.