• Title/Summary/Keyword: Water pipe

Search Result 1,710, Processing Time 0.031 seconds

Application analysis of advanced sewage treatment on the separated sewer pipe (분류식 하수관거에서의 고도하수처리공법 적용성 해석)

  • Park, Soo-Jin;Ko, Jeong-Sup;Baek, Kyung-Won;Choi, Han-Kuy
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2012.05a
    • /
    • pp.772-777
    • /
    • 2012
  • In order to examine the tailorability of advanced sewage treatment of a separated sewer pipe, we observed the quality of leaked water in a reactor. A2C affiliation and MBR affiliation decreased by over 78% in cases of BOD, COD, and SS. SBR affiliation decreased by 79.1% in a case of T-N. Overall, the efficiency of T-N on the above affiliations was low. SS had the high efficiency in MBR affiliation. In the end, examination of water quality improvement showed that the quality was improved from 20% to 90%; hence, it is expected that this treatment can protect the water resources of the Hongcheon River and makes it easier to use the water of the river.

  • PDF

Prediction of Short-term Behavior of Buried Polyethylene Pipe (지중매설 폴리에틸렌 관의 단기거동 예측)

  • Park, Joonseok;Lee, Young-Geun;Kim, Sunhee;Park, Jung-Hwan;Kim, Eung-Ho
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.26 no.6
    • /
    • pp.907-914
    • /
    • 2012
  • Flexible pipes take advantage of their ability to move, or deflect, under loads without structural damage. Common types of flexible pipes are manufactured from polyethylene (PE), polyvinyl chloride (PVC), steel, glass fiber reinforced thermosetting polymer plastic (GFRP), and aluminum. In this paper, we present the result of an investigation pertaining to the short-term behavior of buried polyethylene pipe. The mechanical properties of the polyethylene pipe produced in the domestic manufacturer are determined and the results are reported in this paper. In addition, vertical ring deflection is measured by the laboratory model test and the finite element analysis (FEA) is also conducted to simulate the short-term behavior of polyethylene pipe buried underground. Based on results from soil-pipe interaction finite element analyses of polyethylene pipe is used to predict the vertical ring deflection and maximum bending strain of polyethylene pipe.

Corrosion Behaviour of Water Pipes (수도관의 부기거동에 관한 연구)

  • 김원만;박영식
    • Journal of environmental and Sanitary engineering
    • /
    • v.7 no.1
    • /
    • pp.1-16
    • /
    • 1992
  • Corrosion of pipes Is one of the most serious problems in the maintenance of water worlds. Corrosion is promoted not only by physical factors such as temperature, but also by electrochemical factors including concentration of soluble metal ions, chlorine ion, pH, DO and microorganisms. Corrosion products also affect corrosion rate. In this research, study results are summarized as follows ; 1) Corrosion test was performed for 4 weeks at $70^{\circ}C$, pH 7.0 with specimens of 4 types of metal materials used as service pipes. Corrosion rate and S.E.M were analyzed. The results were showed that corrosion 1.ate of carbon steel pipe was 4.10~5.22 $mg/\textrm{cm}^2$ . week, galvanized steel pipe 0.98~1.34$mg/\textrm{cm}^2$. week, Copper pipe 0.02~0.04$mg/\textrm{cm}^2$. week, stainless steel pipe 0.05~ 0.10$mg/\textrm{cm}^2$ . week. 2) When corrosion rate was tested for tile types of pipes at pH 7 and both $25^{\circ}C$ and $75^{\circ}C$, avaerage corrosion rate for 6 weeks at $25^{\circ}C$ Ivas 2.26$mg/\textrm{cm}^2$ . week in carbon steel pipe, 1.99$mg/\textrm{cm}^2$. week in galvanized steel pipe, 0.26 $mg/\textrm{cm}^2$. week in stainless steel pipe. At $87^{\circ}C$, average corrosion rate for 4 weeks u.3s 4.56 $mg/\textrm{cm}^2$. week in carbon steel pipe,

  • PDF

Risk analysis of road cave-in of storm sewer lateral using zoom camera (줌카메라를 활용한 빗물받이 연결관의 도로함몰 리스크 분석)

  • Han, Sangjong;Hwang, Hwankook
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.28 no.6
    • /
    • pp.681-690
    • /
    • 2014
  • It is known that sewer problems are the major causes of road cave-in. The objective of this study is to analyze the risk of road cave-in due to storm sewer laterals. We investigated 174 storm sewer laterals using a zoom camera at O-dong area in Seoul. The causes of road cave-in were classified into five cases: breakage of rigid pipe, deformation of flexible pipe, out of pipeline alignment, changing pipe material or changing pipe diameter, and a poor linkage between lateral and sewer. In addition, all defects were sorted into five grades based on the severity rating at storm sewer laterals. In this study, the most fragile pipe materials were found to be concrete pipe and polyethylene pipe, which recorded 2.3 and 1.69 defect rates. With regard to the causes of road cave-in, deformation of flexible pipe has a large influence on road cave-in at present. On a long-term basis, the two causes, out of pipeline alignment and a poor linkage between lateral and sewer, could have more influence on road cave-in.

The Determination of Optimal Steel Pipe Wall Thickness Considering Ground Condition (지반 조건을 고려한 최적강관두께의 결정)

  • Park, Jaesung;Oh, Bungdong;Lee, Hojin
    • Journal of the Korean GEO-environmental Society
    • /
    • v.9 no.3
    • /
    • pp.11-15
    • /
    • 2008
  • By considering manufacture and economic factor, the steel pipes have been employed for water supply pipeline with large diameter. The standard to decide a thickness of pipe was provided by the waterworks standard (Ministry of Construction & Transportation, 1992) in South Korea. However, there was no the systematic standard to confirm a thickness of pipe in it. Thus, it should be able to apply to unsuitable the Stewart formula for the buried pipe to design for an optimum thickness of pipe. In order to meet revised the waterworks standard (The Ministry of Environment, 1997), it has been considered both the ground condition and all of the stresses to compute a thickness of pipe. As a results, a method is suggested to determine thickness of pipe after comparing and validating the obtained results with the established results from the Stewart formula.

  • PDF

Explicit Design of Commercial Pipe on a Slope with Pumping Power (동력경사 상용관의 양해법 설계)

  • Yu, Dong-Hun;Gang, Chan-Su
    • Journal of Korea Water Resources Association
    • /
    • v.30 no.5
    • /
    • pp.495-501
    • /
    • 1997
  • Pumping power being given, traditional method requires an iteration process for the solution of discharge and pipe diameter. Yoo and Kang (1996) have developed explicit equations for the estimation of discharge and pipe diameter for the cases of uniformly rough pipe on a sloping bed with a pumping power. The use of poser law for the estimation of friction factor enabled to develop the explicit form of equations. Yoo (1995a) has suggested the mean friction factor method for the estimation of friction factor of commercial pipe or composite surface pipe. With the same approach, the present work has developed the explicit equations of discharge or pipe diameter for the general case of commercial pipe on a sloping bed with a pumping power by adopting the mean friction factor method.

  • PDF

Development of High Performance Bubble Jet Loop Heat Pipe for Hot Water Floor Heating System (온수 가열 바닥 난방 시스템용 고성능 버블젯 루프 히트파이프 개발)

  • Kim, Jong-Soo;Kwon, Yong-Ha;Kim, Jeong-Woong
    • Journal of Power System Engineering
    • /
    • v.18 no.4
    • /
    • pp.23-28
    • /
    • 2014
  • In order to increase the performance of conventional hot water floor heating system, the bubble jet loop heat pipe for the system was developed. This experiment was conducted under next conditions : Working fluid was R-134a, charging ratio was 50%. A temperature of hot water, room temperature and flow rate were $60^{\circ}C$, $15^{\circ}C$ and 0.5~1.5 kg/min, respectively. The experimental results, show that bubble jet loop heat pipe had a high effective thermal conductivity of $4714kW/m^{\circ}C$ and a sufficient heat flux of $73W/m^2$ to heat the floor to $35^{\circ}C$ in case of the 1.5 kg/min of flow rate. So the bubble jet loop heat pipe has a possibility for appling of the floor heating system. Additionally, the visualization of bubble jet loop heat pipe was performed to understand the operating principle. Bubbles made by the narrow gap between inner tube and outer tube of evaporating part generate pulsation at liquid surface of working fluid. The pulsation had slug flow and wavy flow. So working fluid circulates in the bubble jet loop heat pipe as two phase flow pattern. And large amount of heat is transferred by the latent heat from evaporating part to condensing part.

A Study on the Chilling Start-up Characteristics and Performance of a Gas Loaded Heat Pipe (가스내장 히트파이프의 냉시동특성과 성능에 관한 연구)

  • Hong, Sung-Eun;Kang, Hwan-Kook
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.18 no.11
    • /
    • pp.915-922
    • /
    • 2006
  • Considering heat pipe design principles in fabrication and operational performances, water is one of the most recommended working fluids to make mid to low tempera lure heat pipes. But the conventional water heat pipes might encounter the failure in a cold start-up operation when socked at a chilling temperature lower than the freezing point. If they are subjected to a heat supply for start-up at a temperature around $-20^{\circ}C$, the rate of the vapor flow and the corresponding heat transfer from the evaporator to the condenser is so small that the vapor keeps to stick on the surface of the chilling condenser wall, forming an ice layer, resulting in a liquid deficiency in the evaporator. This kind of problems was resolved by Kang et al. in 2004 by adopting a gas loading heat pipe technology to the conventional water heat pipes. This study was conducted to examine a chilling start-up procedure of gas loading heat pipes by investigating the behaviors of heat pipe wall temperatures. And the thermal resistance of the gas loaded heat pipe that depends on the operating temperatures and heat loads was measured and examined. Two water heat pipes were designed and fabricated for the comparison of performances, one conventional and the other loaded with $N_2$ gas. They were put on start-up test at a heat supply of 30 W after having been socked at an initial temperature around $-20^{\circ}C$. It was observed that the gas loaded one had succeeded in chilling start-up operation.

A Study on the Effect of Corrosion Prevention in Water Distribution System by Galvanized Zinc-Brass Pipe (아연-황동관에 의한 배관 부식 억제 효과에 관한 연구)

  • Song, Seung-Joon;Cho, Young-Guen;Kim, Jin-Han
    • Journal of Urban Science
    • /
    • v.7 no.1
    • /
    • pp.23-27
    • /
    • 2018
  • This research was carried out to investigate the corrosion prevention effect in the water distribution system by galvanized zinc-brass pipe which is using potential between brass and zinc. As a result of this study, pH and conductivity of influent were constant in spite of its installation, and it was difficult to estimate the effect of the installation with temporary increased and reduced concentration of Zn and Fe ions, respectively. However, since the corrosion rate of the steel coupon with galvanized zinc-brass pipe was relatively low, it has an effect of inhibiting corrosion.

Deposition Properties of Dredged Materials of Kun-Jang Industrial Complex (군산지역 준설토의 퇴적특성)

  • 한영철;송정락
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1992.10a
    • /
    • pp.61-64
    • /
    • 1992
  • Recently, by the lack of fill material, the dredg and fill(hydraulic fill) method is commonly used in reclamation projects. Hydraulic fill method dredges the soil and send it with water through the transportation pipe to the site. The intial state of the hydraulic fill material is accordingly the mixture of water and soil skeleton which settles with time forming a new soil layer. The properties of new soil layer is governed the size of the soil skeleton, the flow velocity of mixing water, salt concentration, the distance from the discharge pipe outlet, and other dredging conditions when settling process occur. In this study, the effects of gradation of derdged soil on the deposition properties (with emphasis on the optimum spacing of the discharge pipes) was investigated by field test. It was found that the soft fine graind soil was forme at 350m from the discharge pipe outlet when the dredged material was classified as CL, while the soft fine grained soil was not formed even at the distance farther than 400m from the diacharge pipe outlet when the dredged material was classified as SM.

  • PDF