• Title/Summary/Keyword: Water discharge performance

Search Result 289, Processing Time 0.035 seconds

Design and Implementation of Fluid Flow Generation System by using Water Captures (물받이를 이용한 유수발전장치의 설계 및 구현)

  • Son, Young-Dae;Jung, Hyun-Seok
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.61 no.3
    • /
    • pp.413-421
    • /
    • 2012
  • This paper proposes the design and implementation of fluid flow generation system by using polypropylene(PP) water capture, which harvests electric energy from the kinetic energy of tidal current or water flow and drives the desired load, and applies it to the discharge drain of Hadong thermal power plant. This experimental system is composed of water captures, driving wheel, gear trains, 10[kW] synchronous generator, and three phase rectifying circuit which drives lamp load for test. The proposed water capturing system which is composed of water captures, rope and driving wheel, rotates as caterpillar according to water flow. This system is very easy to manufacture and more economical than another type of tidal current turbines such as conventional propeller and helical type. Also, we estimated the available fluid flow energy that can be extracted from the cooling water in discharge drain based on drain's cross-sectional area. Therefore, this paper confirms the validity of proposed fluid flow generation system with water captures and the possibility of its application for renewable energy generation in discharge drain of thermal power plant, from the obtained performance characteristic of this energy conversion system.

The performance evaluation of dam management by using Granger causal analysis (그랜저 인과분석을 통한 댐관리 성과평가)

  • Cho, Sung-Min;Yoo, Myoung-Kwan;Lee, Deokro
    • Journal of Korea Water Resources Association
    • /
    • v.54 no.2
    • /
    • pp.135-144
    • /
    • 2021
  • This paper attempted to find implications for water resource management and water quality improvement by analyzing the causal relationship among discharge, water temperature and pollution index, which were expected to have a great effect on water quality with the rise of water temperature and precipitation change as the warming effect in recent years. For this purpose, the unit root test, cointegration test, and Granger causal test were carried out for 10 multi-purpose dams in Korean major water systems using time series data on discharge, water temperature, BOD, COD and DO. It was analyzed that the fluctuation of water temperature affected the pollution index more than the fluctuation of discharge volume. Also, Hapcheon dam and Chungju dam were the best water quality management dams based on the high causal relationship between water quality and discharge. The second rank was Daecheong dam. The third-ranking group were Yongdam and Andong dam, whose causal relationships between water quality and discharge were low. The last group were the remaining five dams.

Analysis of Performance Enhancement of a Microturbine by Water Injection (수분사를 통한 마이크로터빈 성능향상 해석)

  • Jeon, Mu-Sung;Lee, Jong-Jun;Kim, Tong-Seop
    • The KSFM Journal of Fluid Machinery
    • /
    • v.12 no.2
    • /
    • pp.46-51
    • /
    • 2009
  • Recently, microturbines have received attention as a small-scale distributed power generator. Since the exhaust gas carries all of the heat release, generating hot water is usual method of heat recovery from microturbine CHP (combined heat and power) systems. The power of microturbines decreases as ambient temperature increases. This study predicted micoturbine power boost by injecting hot water generated by heat recovery. Influence of injecting water at two different locations was examined. Water injection improves power, but efficiency depends much on the injection location. Injecting water at the compressor discharge shows a much higher efficiency than the combustor injection. However, the combustor injection may have as much available cogeneration heat as the dry operation, while the available heat in the compressor discharge injection is much smaller than the dry operation.

A Study on the Microorganism Disinfection and Characteristics of Discharged Water of Dielectric Barrier Discharge Plasma Systems (유전체 장벽 방전 플라즈마 방전수의 특성과 미생물 소독에 관한 연구)

  • Kim, Dong-Seog;Park, Young-Seek
    • Journal of Environmental Health Sciences
    • /
    • v.38 no.2
    • /
    • pp.159-165
    • /
    • 2012
  • Objectives: This experiment was carried out to elucidate the effect of discharged water on the disinfection of $Phytophthora$ $capsici$ and evaluate the water characteristics. Methods: The dielectric barrier discharges (DBD) plasma reactor system used in this study consisted of a plasma component [discharge, ground electrode and quartz dielectric tube], high voltage source, and air supply. The effects of water characteristics such as pH, ORP and conductivity and the disinfection effect of discharged water were investigated. Results: Experimental results showed that in the process of discharge, the pH decreased, whereas ORP and electric conductivity increased. When the discharge time was 30 min, $Phytophthora$ $capsici$ of 2.94 log was disinfected within 300 seconds. Disinfection performance of stored discharged water was maintained for three days; however the disinfection effect vanished after five days. When $Phytophthora$ $capsici$ was injected into the discharged water, the disinfection effect decreased after two days. Conclusions: It is considered that the main disinfection parameters of the discharged water were chemically active species such as $H_2O_2$ and $O_3$ and high ORP.

Discharge Coefficients of Orifice Hole in the Cartridge of Constant Flow Control Valve (정유량 밸브의 카트리지의 오리피스 구멍의 유출계수)

  • Yoo, Seon-Hak;Kang, Seung-Duk;Yang, Eui-Seok;Park, Kyung-Am
    • 유체기계공업학회:학술대회논문집
    • /
    • 2004.12a
    • /
    • pp.305-308
    • /
    • 2004
  • The constant flow control valve is used to control the flow rate of heating water in the large apartment complex and buildings. It is important to have similar heating flow rate in the apartments, even though the apartment is top or bottom floors. To achieve those purposes, the constant flow control valve was developed. The performance of this control valve is effected by hole area and discharge coefficients of the cartridge holes. The discharge coefficients of orifice hole in the cartridge were testes with various sizes of holes and various flow direction in the holes. The discharge coefficients decreased as the hole size increased due to the collision at the cartridge wall of water jet. The effects of the flow direction at the hole were not significant on the discharge coefficients.

  • PDF

Experiment on the Charge and Discharge of Thermal Energy for Under-Water Harvest-Type Ice Storage System (수중 하베스트형 빙축열시스템의 축방냉 특성 실험)

  • Kim, J.D.
    • Journal of the Korean Solar Energy Society
    • /
    • v.22 no.2
    • /
    • pp.11-17
    • /
    • 2002
  • This paper is concerned with the development of a new method for making, separating ice and storage floated ice by installing an evaporation plate at under-water within a storage tank. In a conventional harvest-type ice storage system, a tank saves ice by separating an ice from an installed evaporation plate, which is located above an ice storage tank as an ice storage system. Developed new harvest-type method shows good heat transfer efficiency than a convectional method. It is because the evaporation panel is directly contacted with water in a storage tank. Also, at a conventional system a circulating pump, a circulating water distributor and a piping are installed, however these components are not necessary in a new method. In this study ice storage systems are experimentally investigated to study the charge and discharge of thermal energy. The results show the applicable possibility and performance enhancement of a new type.

Application of Air Lift Pump for Sludge Discharger (공기 양정(air lift) 펌프를 응용한 슬러지 배출장치에 대한 연구)

  • Ahn Kab-Hwan;Park Young-Seek
    • Journal of Environmental Science International
    • /
    • v.13 no.10
    • /
    • pp.929-938
    • /
    • 2004
  • Sludge discharger applied the principle of the air lift pump was investigated experimentally for the different design( diameter of discharge pipe, diameter and height of the inside and outside wall) and operating parameters(air flow rate, water level). And it was conducted that performance comparison about sludge discharger and conventional air lift pump. The result indicated that discharged liquid were increased with the increase of air flow rate and water level and decrease distance between inside and outside wall. The discharge pressure was increased with an increase of air flow rate and a decrease of the diameter of the discharge pipe, for both the sludge discharger and the airlift pump. The discharge pressures of the sludge discharger were 3-6 times higher than those of the air lift pump.

Sewage Treatment Using Natural Systems and Effluent Reuse for Crop Irrigation in Small Communities

  • Ham, Jong-Hwa;Yoon, Chun-G.;Jeon, Ji-Hong;Hwang, Ha-Sun
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.45 no.7
    • /
    • pp.70-82
    • /
    • 2003
  • A pilot study was performed from July 1998 to December 2002, including winter performance, to examine seasonal performance of a constructed wetland and subsequent pond system for treatment of sewage in small communities of Korea. Pond was operated as a intermittent-discharge pond during winter period, and continuous flow system during growing season; its effects was evaluated from December 2001 to April 2003. The subsurface flow (SSF) wetland was satisfactory for treating sewage with good removal efficiency even during the winter period. The wetland effluent concentrations of $BOD_5$ and TSS were often higher in winter than in the growing season, but this was explained by the higher loading rates, rather than lower removal efficiency. The relatively poor-quality wetland effluent was further polished during winter in the pond. The upper layer of the pond water column became remarkably clear immediately after ice melt. In the growing season, ponds could be operated as a continuous flow system to remove nutrients and pathogens, and the effluent of pond could be reused as a supplemental irrigation water without risk of infection by sewage-borne pathogens as well as causing adverse effect on growth and yield. Overall, the wetland system was found to be adequate for treating sewage with stable removal efficiency, and the intermittent-discharge pond was found to be effective for further polishing if necessary. Therefore, the combination of a wetland and subsequent pond system and reuse of effluent as crop irrigation water is recommended as a practical alternative to treat sewage in Korean small communities, and partial discharge of pond water in March is suggested.

Development of a new system for measurement of total effluent load of water quality

  • Keiji, Takase;Akira, Ogura
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2015.05a
    • /
    • pp.221-221
    • /
    • 2015
  • Sustainable use of water resource and conservation of water quality are essential problems in the world. Especially, problems of water quality are serious one for human health as well as ecological system of all creatures on the earth. Recently, the importance of total effluent load as well as the concentrations of pollutant materials has been recognized not only for the conservation of water quality but also for sustainable water use in watersheds. However, the measurement or estimation of total effluent load from non-point source area such as farm lands or forests may be more difficult because both of concentration and discharge of the water are greatly changed depending on various factors especially metrological conditions such as rainfall, while the measurement from a point source area may be easy because the concentration of pollutant materials and amount of discharge water are relatively steady. Therefore, the total effluent load from a non-point source is often estimated by statistical relationships between concentration and discharge, which is called as L-Q equation. However, a lot of work and time are required to collect and analyze water samples and to get the accurate relationship or regressive equation. So, we proposed a new system for direct measurement of total effluent load of water quality from non-point source areas to solve the problem. In this system, the overflow depth at a hydraulic weir is measured with a pressure gage every hourly interval to calculate the amount of hourly discharge at first. Then, the operating time of a small electric pump to collect an amount of water which is proportional to the discharge is calculated to intake the water into a storage tank. The stored water is taken out a few days later in a case of storm event or several weeks later in a case of non-rainfall event and the concentrations of water quality such as total nitrogen and phosphorous are analyzed in a laboratory. Finally, total load of the water quality can be calculated by multiplying the concentration by the total volume of discharge. The system was installed in a small experimental forestry watershed to check the performance and know the total load of water quality from the forest. It was found that the system to collect a proportional amount of water to actual discharge operated perfectly and a total load of water quality was analyzed accurately. As the result, it was expected that the system will be very available to know the total load from a non-point source area.

  • PDF

Performance evaluation of nitrate removal in high TDS wet scrubber wastewater by ion exchange resin with dissolved air flotation (DAF) process

  • Kim, Bongchul;Yeo, Inseol;Park, Chan-gyu
    • Membrane and Water Treatment
    • /
    • v.13 no.1
    • /
    • pp.1-6
    • /
    • 2022
  • The regulations of the International Maritime Organization (IMO) have been steadily strengthened in ship emissions. Accordingly, there is a growing need for development of related technologies for the removal of contaminants that may occur during the treatment of SOx and NOx using a wet scrubber. However, this system also leads to wastewater production when the exhaust gas is scrubbed. In this research, we evaluated the performance of an ion selective resin process in accordance with scrubber wastewater discharge regulations, specifically nitrate discharge, by the IMO. Accelerated real and synthetic wastewater of wet scrubbers, contained high amounts of TDS with high nitrate, is used as feed water in lab scale systems. Furthermore, a pilot scale dissolved air flotation (DAF) using microbubble generator with ion exchange resin process was combined and developed in order to apply for the treatment of wet scrubber wastewater. The results of the present study revealed that operating conditions, such as resin property, bed volume (BV), and inlet wastewater flow rate, significantly affect the removal performance. Finally, through a pilot test, DAF with ion exchange resin process showed a noticeable improvement of the nitrate removal rate compared to the single DAF process.