• Title/Summary/Keyword: Water Supply Facility

Search Result 204, Processing Time 0.026 seconds

Estimation of Domestic Water Supply Benefit Using Demand Function Approach (수요함수 접근법을 이용한 생활용수 공급편익 산정)

  • Yeo, Kyu Dong;Yi, Choong Sung;Kim, Gil Ho;Lee, Sang Won
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.4B
    • /
    • pp.233-242
    • /
    • 2012
  • In the past, the domestic water supply benefit of dam has been estimated by replacement dam cost approach. But it is logically inappropriate that we use the second priority dam as a replaced facility. Therefore, this study aims to suggest the estimation method of the domestic water supply benefit by using demand function, which is deduced from Willingness-To-Pay (WTP) of consumers. For this purpose, a survey concerning the marginal WTP is carried out according to the change of water use amount used, targeted 1,000 households in metropolitan area. And by using the marginal WPT, we estimated the demand function of a family. Finally, the monthly benefit equation is derived. The approach is demonstrated and discussed for an example, the Song-Li-Won dam project which is now renamed Young-Ju dam. From the example study, the total benefit for the durable years (50 years), was about 90 billion won. The method proposed herein is expected to be practical and useful in the economic analysis of the domestic water supply project including dam construction, as well as in further studies.

A Study on the Effect to Reduce the Greenhouse Gas with a Pump Scheduling System in Water Supply Plant : Energy Efficiency Improvement CDM Project in Paldang Pumping Station(III) (펌프 스케쥴링 시스템을 적용한 수도사업장의 온실가스 저감효과 분석 : 팔당3 취수장 에너지효율향상 CDM 사업을 중심으로)

  • Kim, Min Su;Lee, Hyung Muk;Park, Min Su;Gwon, Gi Beom
    • Journal of Climate Change Research
    • /
    • v.4 no.1
    • /
    • pp.63-75
    • /
    • 2013
  • The purpose of this study is to analyze the green-house gas emission reduction of the pump scheduling system applied to the water-supply facilities in all objectivity with AMS-II.C/Version 13 in CDM methodology. To calculate the baseline and project emission in Paldang Pumping Station (III) the data about water flow, water level, electricity consumption, etc. before and after the implementation of project was used. This study considers internal facility (mostly for lighting) electricity consumption and grid loss in order to get more accurate emission reductions. The methodology used in this study will be able to apply to different energy improvement techniques to calculate emission reductions in water supply facilities.

Analysis of the effect of long-term water supply improvement by the installation of sand dams in water scarce areas (물부족 지역에서 샌드댐 설치에 의한 장기 물공급 개선 효과 분석)

  • Chung, Il-Moon;Lee, Jeongwoo;Lee, Jeong Eun;Kim, Il-Hwan
    • Journal of Korea Water Resources Association
    • /
    • v.55 no.12
    • /
    • pp.999-1009
    • /
    • 2022
  • The Chuncheon Mullori area is an underprivileged area for water welfare that does not have a local water supply system. Here, water is supplied to the village by using a small-scale water supply facility that uses underground water and underground water as the source. To solve the problem of water shortage during drought and to prepare for the increasing water demand, a sand dam was installed near the valley river, and this facility has been operating since May 2022. In this study, in order to evaluate the reliability of water supply when a sand dam is assumed during a drought in the past, groundwater runoff simulation results using MODFLOW were used to generate inflow data from 2011 to 2020, an unmeasured period. After performing SWAT-K basin hydrologic modeling for the watershed upstream of the existing water intake source and the sand dam, the groundwater runoff was calculated, and the relative ratio of the monthly groundwater runoff for the previous 10 years to the monthly groundwater runoff in 2021 was obtained. By applying this ratio to the 2021 inflow time series data, historical inflow data from 2011 to 2020 were generated. As a result of analyzing the availability of water supply during extreme drought in the past for three cases of demand 20 m3/day, 50 m3/day, and 100 m3/day, it can be confirmed that the reliability of water supply increases with the installation of sand dams. In the case of 100 m3/day, it was analyzed that the reliability exceeded 90% only when the existing water intake source and the sand dam were operated in conjunction. All three operating conditions were evaluated to satisfy 50 m3/day or more of demand based on 95% reliability of water supply and 30 m3/day or more of demand based on 99% of reliability.

Study on Seismic Fragility Analysis of Water Supply Facilities (상수도 시설물의 지진 취약도)

  • Lee, Changsoo;Shin, Deasub;Lee, Hodam
    • Journal of the Society of Disaster Information
    • /
    • v.11 no.1
    • /
    • pp.35-43
    • /
    • 2015
  • In this study, The failure of water supply facilities is categorized into two phases: functional failure and complete collapse. The fragility curve of water supply facilities under PGA has been developed for two loading cases: actual overseas earthquake and Korean artificial earthquake. The seismic fragility of water supply facilities has been analyzed and compared about failure phases and PGA. From the analysis results, the probability of failure of the wrapped steel pipe and ductile case iron pipe under Korean artificial earthquake has been shown as lower than that under actual overseas earthquake in the range from 0.1 to 0.4. The suggested seismic fragility curve by using Korean artificial earthquake can be exploited in a reasonable seismic design reflecting Korean local ground condition.

Analysing the Effect of Residual Chlorine Equalization for Water Quality Improvement in Water Distribution System (공급과정 수질개선을 위한 잔류염소 균등화 효과분석)

  • Choi, Taeho;Lee, Doojin;Bae, Cheolho;Moon, Jiyoung
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.30 no.5
    • /
    • pp.587-596
    • /
    • 2016
  • This study attempts to draw factors for an analysis of the operation effect of a rechlorination facility and autodrain equipment for residual chlorine equalization by installing and operating a rechlorination facility and autodrain equipment in P City and analyzing the practical evaluation method and operation effect. For this purpose, this study selected three indicators for an analysis of the effectiveness of residual chlorine equalization and conducted a comparative analysis before and after the implementation of the residual chlorine equalization. As a result of estimation, (1) the reduction of the residual chlorine concentration range from a water treatment plant to the pipe end was 16.0%; (2) the total reduction of chlorination input was 18.0%; and (3) the reduction of the generation of disinfection by-products was 19.5%. In addition, this achieved enough residual chlorine equalization in the supply process and shows that it could successfully achieve the economic feasibility of investment in equipment and the reduction of the generation of disinfection by-products. Like this, it is judged that the three indicators suggested in this study will be used sufficiently as indicators of an analysis of the effectiveness of residual chlorine equalization according to the operations of the rechlorination facility and autodrain equipment.

A study on the economical life of large-diameter water pipe: case study in P waterworks (대구경 상수도관로의 경제적수명 산정 연구: P상수도 사례연구)

  • Kim, Kibum;Seo, Jeewon;Choi, Taeho;Koo, Jayong
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.32 no.1
    • /
    • pp.37-45
    • /
    • 2018
  • This study develops a model to estimate the economic life of the large-diameter water supply pipeline in Korea by supplementing existing methods used to perform similar calculations. To evaluate the developed methodology, the model was applied to the actual target area with the conveyance pipe in P waterworks. The application yielded an economic life computation of 39.7 years, considering the cost of damages, maintenance, and renewal of the pipeline. Based on a sensitivity analysis of the derived results, the most important factor influencing the economic life expectancy was the predicted failure rate. The methodology for estimating the economic life of the water supply pipeline proposed in this study is one of the core processes of basic waterworks facility management planning. Therefore, the methods and results proposed in this study may be applied to asset management planning for water service providers.

A Study on LSTM-based water level prediction model and suitability evaluation (LSTM 기반 배수지 수위 변화 예측모델과 적합성 평가 연구)

  • Lee, Eunji;Park, Hyungwook;Kim, Eunju
    • Smart Media Journal
    • /
    • v.11 no.5
    • /
    • pp.56-62
    • /
    • 2022
  • Water reservoir is defined as a storage space to hold and supply filtered water and it's significantly important to manage water level in the water reservoir so as to stabilize water supply by controlling water supply depending on demand. Liquid level sensors have been installed in the water reservoir and the pumps in the booster station facilitated management for optimum water level in the water reservoir. But the incident responses including sensor malfunction and communication breakdown actually count on manager's inspection, which involves risk of accidents. To stabilize draining facility management, this study has come up with AI model that predicts changes in the water level in the water reservoir. Going through simulation in the case of missing data in the water level to verify stability in relation to the field application of the prediction model for water level changes in the reservoir, the comparison of actual change value and predicted value allows to test utility of the model.

The Promotion of Experiential Marine Sports by Developing aPlan for Fishing Village and Port (어촌·어항을 활용한 해양스포츠 체험관광 활성화 방안)

  • JI, Sam-Up;KIM, Yong-Jae;LEE, Jae-Hung
    • Journal of Fisheries and Marine Sciences Education
    • /
    • v.17 no.1
    • /
    • pp.86-105
    • /
    • 2005
  • The plan of developing a fishing village and port will be indirectly funded by the government. In the short term, there will be five different multi-functional fishing village models which are based on the first industry to attach to the third industry of marine sports experience tourism. In the long run, they have to be reached gradually. The popular scenic spot of the marine sports experience tourism is made by human resources and fundamental installations considering that it must be done in unpolluted water. It is necessary to separate the fish harbor into two sides. One side is an existing fishing industry. The other side is made up of several pontoons for the marine sports equipment of the marine mooring. It is necessary to build facilities, such as the mooring facility, the storage facility, the repair-check facility, supply-cleaning facility, information booth, accommodations, education facility, and a marine culture exchange facility.

Assessment of the Potential Water Supply Rate of Agricultural Irrigation Facilities Using MODSIM - For Geum River Basin - (MODSIM을 이용한 농업용 수리시설의 용수공급율 평가 - 금강권역을 중심으로 -)

  • Ahn, So-Ra;Park, Geun-Ae;Shin, Young-Ho;Kim, Seong-Joon
    • Journal of Korea Water Resources Association
    • /
    • v.42 no.10
    • /
    • pp.825-843
    • /
    • 2009
  • To prepare for agricultural droughts, the potential discharge to the water supply of irrigation facilities during drought periods is important. Using the MODSIM (Modified SIMYLD) model, water balance networks that consider irrigation facilities were designed for the Geum River Basin, and the potential discharge to the agricultural water supply of irrigation facilities were evaluated by running the model using data for 36 years (1967-2002). It was found that agricultural water deficiencies occurred during the drought years more than in the other years. The agricultural water deficiencies in 1994, 1995, and 2001, the representative drought years, were 745.8 million m$^3$, 661.1 million m$^3$, and 696.8 million m$^3$, respectively. The average potential discharge to the water supply of the sub-basin was 99.1 % in the cases of municipal and industrial water, and 84.4 % in the case of agricultural water. The potential discharge to the water supply in 1994, 1995, and 2001 were 74.8 %, 79.2 %, and 77.9 %, respectively, which are lower than those of the other years' sub-basin average. In the analysis of the contribution of each irrigation facility, the contributions of pumping stations and diversions were calculated as 32.5 %, and of culverts and wells, 4.0 %. During the drought periods, the pumping stations and diversions contributed to a certain level.

An Experimental Study on Two Parameter Control for Radiant Floor Heating System

  • Cho, Sung-Hwan;Tae, Choon-Seob;Jang, Chel-Yong
    • International Journal of Air-Conditioning and Refrigeration
    • /
    • v.6
    • /
    • pp.136-147
    • /
    • 1998
  • An experimental facility consisting of two 3$\times$4.4$\times$2.8m rooms identical in construction is built. Each room has a control system and storage tank supplying hot water to the radiant floor heating system. The facility enables simultaneous comparison of two different control strategies each implemented in a separate room. The operating performance of three kinds of flow control scheme is tested and compared in this study: (ⅰ) conventional on-off control based on feedback from room air temperature (ⅱ) TPSC(two parameter switching control )(ⅲ) TPOC(two parameter on-off control). Results show that TPSC and TPOC using room air and surface temperature sequentially as feedback signal to control hot water supply is the better temperature regulation scheme than conventional control based on feedback from only room air temperature. They are good candidates for the room with radiant floor heating system under continuous and intermittent heating mode.

  • PDF