Life Cycle Assessment (LCA) on Sludge Treatment System (Life Cycle Assessment(LCA)를 도입(導入)한 오니처리(汚泥處理)시스템의 평가(評價))

  • Hwang, Yong-Woo;Kwon, Bong-Kee;Ryu, Seong-Ho
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.11 no.2
    • /
    • pp.50-64
    • /
    • 1997
  • Life cycle assessment (LCA) on total sewage sludge treatment system from thickening to incineration and melting was performed for estimating global environmental impact as $CO_2$. In general, the life cycles of actual treatment facilities consist of construction, operation and dismantlement. In this study, the amount of $CO_2$ produced from both whole and each life cycle step of currently used unit sludge treatment processes were calculated by inventory analysis. In addition, in the all processes investigated in this study, individual $CO_2$ production unit (CPU), i.e. total produced $CO_2$ by treating a unit weight of sludge was also calculated. By using the CPU matrix of the unit processes, it was possible to simulate the $CO_2$ production for any type of complex-system as well as to trace a dominant cause of $CO_2$ production in each process. Four selected alternatives examined here, each involve the same disposal way but differ substantially in the $CO_2$ exhaust.

  • PDF

Evaluation of the Middle Part of the Nuclear Fuel Cycle

  • Kovac, Michal
    • Nuclear Engineering and Technology
    • /
    • v.48 no.1
    • /
    • pp.169-174
    • /
    • 2016
  • This article describes a comprehensive methodology for the evaluation of the middle part of nuclear fuel cycles. Evaluation of fuel cycles is basically divided into two parts. The first comprises nuclear calculation, i.e., creation of the strategy for nuclear fuel reloading and core design calculations. The second part is the business-economic evaluation of the selected reloading strategy, which can be done either by financial analysis or economic analysis. The financial analysis incorporates the perspectives of a company while the economic analysis can be used primarily by national economists or politicians. This methodology was applied to a case study that is focused on impacts of switching from a 12-month to an 18-month fuel cycle strategy for Water-Water Energetic Reactor (VVER)-1000 reactors.

Design Value Analysis and LCC Analysis Model of Water Supply System Project (수도시설의 설계VA 및 LCC 분석모델)

  • Lim Jong-Kwon;Jung Pyung-Ki;Seo Jong-Won;Lee Jae-Sun;Cho Kook-Rae
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.469-472
    • /
    • 2003
  • A life cycle cost analysis model for public water supply systems should be different from the ones for other civil and architectural facilities as the operation and the maintenance cost of the water supply systems mainly come from the various mechanical systems and the pipeline systems of the collecting/treating/distributing facilities. This paper presents a cost classification scheme and a life cycle cost analysis model for public water supply systems. A value analysis (VA) procedure that is well suited for practical purposes is also presented. The presented life cycle model and the value analysis procedure were applied to a real world project, and this case study is discussed in the paper. The model and the procedure presented in this study can greatly contribute to the value-oriented design alternative selection, the estimation of the maintenance cost, and the allocation of budget for water supply system construction projects.

  • PDF

Performance Characteristics of a Mixed Refrigerant OTEC Power Cycle Using Hot Waste Water (온배수를 이용한 혼합냉매용 해양온도차 발전 사이클의 성능 특성)

  • Yoon, Jung-In;Son, Chang-Hyo;Heo, Jeong-Ho;Ye, Byoung-Hyo;Kim, Hyun-Ju;Lee, Ho-Saeng
    • Journal of Power System Engineering
    • /
    • v.17 no.6
    • /
    • pp.102-107
    • /
    • 2013
  • In this paper, the performance analysis for evaporation capacity, total work and efficiency of the ocean thermal energy conversion(OTEC) power system using mixed refrigerant(R32,R152a) is conducted to find the effect of hot wasted water on OTEC power system. The system in this study is applied with two stage turbine, regenerator, cooler and separator on Organic Rankine Cycle. The commercial program HYSYS is used for the performance analysis. The main results were summarized as follows : The efficiency of the OTEC power cycle has a largely effect on the evaporation capacity and total work. As increasing temperature of heat source water, evaporator's capacity is decreased but total work increase. Otherwise, using hot wasted water bring effects not only increasing system efficiency but also declining evaporator's capacity. Thus With a thorough grasp of these effect, it is necessary to find way to use hot wasted water emitted by power plant and so on.

Experimental Study on the Cooling and Heating Operation Characteristics of a Sea Water Source Heat Pump (해수열원 히트펌프 시스템의 냉난방 운전 특성에 관한 실증 연구)

  • Kim, Ji-Young;Baik, Young-Jin;Chang, Ki-Chang;Ra, Ho-Sang
    • Proceedings of the SAREK Conference
    • /
    • 2009.06a
    • /
    • pp.544-549
    • /
    • 2009
  • The purpose of this study is to investigate the field Operation Characteristics of a sea water heat source cascade heat pump system and system applicable to Building. Cascade heat pump system is composed R410A compressor, R134a compressor, EEV, cascade heat exchanger, Plate heat exchanger etc. Building area is $890m^2$ and has five floors above ground. R410A is used for a low-stage working fluid while R134a is for a high-stage. The system could runs at dual mode. One is mode of general R410A refrigeration cycle in summer and the other is cascade cycle. In order to gain a high temperature supply water in winter season, the system is designed to perform a cascade cycle. The filed test results show that the sea water heat source heat pump system exhibits a COP of about 5.5 in cooling mode along with a heating COP of about 4.0 in 1-stage heating mode. Cascade 2-stage heat pump system is enough to supply $60^{\circ}C$ water and heating COP is about 3.0

  • PDF

A Study of the Feature Classification and the Predictive Model of Main Feed-Water Flow for Turbine Cycle (주급수 유량의 형상 분류 및 추정 모델에 대한 연구)

  • Yang, Hac Jin;Kim, Seong Kun;Choi, Kwang Hee
    • Journal of Energy Engineering
    • /
    • v.23 no.4
    • /
    • pp.263-271
    • /
    • 2014
  • Corrective thermal performance analysis is required for thermal power plants to determine performance status of turbine cycle. We developed classification method for main feed water flow to make precise correction for performance analysis based on ASME (American Society of Mechanical Engineers) PTC (Performance Test Code). The classification is based on feature identification of status of main water flow. Also we developed predictive algorithms for corrected main feed-water through Support Vector Machine (SVM) Model for each classified feature area. The results was compared to estimations using Neural Network(NN) and Kernel Regression(KR). The feature classification and predictive model of main feed-water flow provides more practical methods for corrective thermal performance analysis of turbine cycle.

Analysis of Water Cycle at Main Streams in Ulsan Using CAT Model (CAT 모형을 이용한 울산지역 주요 하천유역의 물순환 분석)

  • Lee, Sang Hyeon;Cho, Hong Je
    • Journal of Korea Water Resources Association
    • /
    • v.47 no.1
    • /
    • pp.1-10
    • /
    • 2014
  • This study aimed to analyze water cycle at Taehwa river, Dongcheon, Hoiya river and Cheongryang cheon in Ulsan city using CAT model developed by Korea Institute of construction technology. To apply CAT model, we separated Teahwa river into 25, Dongcheon into 11, Hoiya river into 17 and Cheongryangcheon into 5 subbasins and discriminated between contribution runoff basins and source basins. The results of water cycle analysis performed using rainfall datas measured from 1975 and 2008 and hydrologic datas of change of land use etc. were that surface runoff increase and interflow decrease, caused by the increase of impervious area. The increases of surface runoff at the basin of Taehwa river and Dongcheon which is a tributary of Taehwa river were small and similar to each other respectively as 1.7% and 2.4%, and increased high rate of 3.2% and 7.7% in Hoiya river and Cheongryangcheon including subbasins which are having high rate of urbanization.

A Study on the Design Value Analysis Model Using Probabilistic LCC Analysis of Water Supply System Project (확률적 LCC분석기법을 활용한 수도시설물의 설계VA모델에 관한 연구)

  • Jung Pyung-Ki;Seo Jong-Won;Lim Jong-Kwon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.181-193
    • /
    • 2004
  • A life cycle cost analysis model for public water supply systems should be different from the ones for other civil and architectural facilities as the operation and the maintenance cost of the water supply systems mainly come from the various mechanical systems and the pipeline systems of the collecting/treating/distributing facilities. This paper presents a cost classification scheme and a probabilistic life cycle cost analysis (PLCCA) model for public water supply systems. A value analysis (VA) procedure that is well suited for practical purposes is also presented. The presented probabilistic life cycle model and the value analysis procedure were applied to a real world project, and this case study is discussed in the paper. The model and the procedure presented in this study can greatly contribute to the value-oriented design alternative selection, the estimation of the maintenance cost, and the allocation of budget for water supply system construction projects.

Performance Characteristics and Economic Assessment of Heat Pump Systems with the Various Heat Source (열원에 따른 열펌프의 성능 비교 및 경제성 평가)

  • Park, Cha-Sik;Park, Kyoung-Woo;Kwon, Oh-Kyung
    • Journal of the Korean Society for Geothermal and Hydrothermal Energy
    • /
    • v.7 no.1
    • /
    • pp.23-31
    • /
    • 2011
  • The objectives of this study are to analyze the performance of a heat pump system with the various heat source and to carry out economic assessment for the heat pump system. The COP of the river water and ground source heat pump system was 20% higher than that of the air source heat pump system because river water and geothermal provide stable operating temperature compared with air temperature throughout the year. In addition, the economic assessment of a heat pump system using air, river water, and geothermal as a heat source was carried out. The ratio of the life cycle operating cost to the life cycle cost increased with the increase of building capacity. The payback period was found to be less than 3.3 and 4.5 years, respectively when the capacity of the river water and ground source heat pump was larger than 10 RT.

Effectiveness Analysis of Alternatives to Rehabilitate the Distorted hydrologic Cycle in the Anyangcheon Watershed using HSPF (HSPF 모형을 이용한 안양천 유역의 물순환 건전화 대안기술 효과분석)

  • Chung, Eun-Sung;Lee, Joon-Seok;Lee, Kil Seong;Kim, Sang-Ug;Kim, Kyung-Tae
    • Journal of Korean Society on Water Environment
    • /
    • v.23 no.6
    • /
    • pp.973-984
    • /
    • 2007
  • This study developed and calculated alternative evaluation index (AEI) from the effectiveness analyses of alternatives for rehabilitation of distorted hydrologic cycle. The feasible alternatives for the poor-conditioned region in the Anyangcheon watershed were proposed and quantitatively analyzed using continuous water quantity/quality simulation model, Hydrological Simulation Program-Fortran (HSPF). The effectiveness analyses include 355th flow and 275th flow of flow duration curve and number of increased days to satisfy the target monthly flow for water quantity and BOD average concentration, total daily loads and number of increased days to satisfy the target concentration and total daily loads. The feasible alternatives are restoration of covered stream, prevention of streamflow loss through sewers, redevelopment of existing reservoir, reuse of treated wastewater, use of groundwater collected by subway stations and construction of small wastewater treatment plant. Therefore, alternative priority ranking was derived from AEIs. It will be effective to make an integrated watershed management for sustainable development.