• 제목/요약/키워드: Wastewater plant treatment (WWPT):

검색결과 1건 처리시간 0.01초

SWAT 모형과 EMC 산정결과를 이용한 안양천의 수량 및 수질 특성 (Characteristics of Water Quantity and Quality of the Anyangcheon using SWAT Model and Calculation Result of EMC)

  • 정은성;이길성;신문주
    • 한국물환경학회지
    • /
    • 제22권4호
    • /
    • pp.648-657
    • /
    • 2006
  • Characteristics of water quantity and quality of the Anyangcheon were analyzed through many field measurements and the distributed hydrologic simulation model, Soil and Water Assessment Tool (SWAT). Event mean concentrations (EMCs) and baseflow mean concentrations were calculated from the data and the daily runoff were simulated by SWAT. The runoff was divided into the direct runoff and the baseflow. Using those values and quantity and quality data of release from the wastewater treatment plant (WWPT), unit loads of BOD, COD, SS, $NO_2-N$, $NO_3-N$, $NH_3-N$, and Dis-P were derived. EMCs of BOD and SS were even higher than the baseflow mean concentrations. The total runoff from October to April (7 months) of 2004 was just 13.5%, since the rainfall usually is concentrated in summer season. Futhermore BOD and SS were loaded during the event by 50.9% and 70.9%, respectively and over three quarters of total COD, $NO_2-N$, $NO_3-N$, $NH_3-N$, and Dis-P were flowed into the Anyangcheon during the remaining period. Therefore, the efficiency of WWPT for COD, $NO_2-N$, $NO_3-N$, $NH_3-N$, and Dis-P should be intensified from Oct. to Apr. and the runoff quality management of BOD and SS should be planned during the summer season.