• Title/Summary/Keyword: Waiting time for hot water

Search Result 2, Processing Time 0.016 seconds

A Study on the Performance Evaluation of Recirculation System for Individual Hot Water Supply System in Residential Buildings (주거건물의 개별급탕방식 환탕배관 적용에 따른 급탕성능 평가에 관한 연구)

  • Cha, Min-Chul;Yeo, Myoung-Souk;Seok, Ho-Tae
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.19 no.12
    • /
    • pp.857-864
    • /
    • 2007
  • In the current residential building, hot water supply system consumes the second largest energy in order to make the thermal comport condition of residential space. The more residential environment improves the more the demand for hot water and water consumption is increasing gradually. So this study examines the possibility of applying the recirculation for individual hot water supply system compared with the existing method for waiting time for hot water, wasted water and energy consumption. The results are as follows. (1) In case of recirculation system method the waiting time for hot water can be reduced up to $69\sim85%$ in spring and fall period and so dose up to $77\sim85%$ in winter period. (2) The total wasted water has a little change compared with the existing method which can make the total wasted water reduced about $77\sim86%$. (3) The efficiency of hot water supply system can be improved, if the method which blocks the inflow of cold water is applied, when return pump is operated to recirculate hot water in recirculation system.

RPSMDSM: Residential Power Scheduling and Modelling for Demand Side Management

  • Ahmed, Sheeraz;Raza, Ali;Shafique, Shahryar;Ahmad, Mukhtar;Khan, Muhammad Yousaf Ali;Nawaz, Asif;Tariq, Rohi
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.14 no.6
    • /
    • pp.2398-2421
    • /
    • 2020
  • In third world countries like Pakistan, the production of electricity has been quickly reduced in past years due to rely on the fossil fuel. According to a survey conducted in 2017, the overall electrical energy capacity was 22,797MW, since the electrical grids have gone too old, therefore the efficiency of grids, goes down to nearly 17000MW. Significant addition of fossil fuel, hydro and nuclear is 64.2%, 29% and 5.8% respectively in the total electricity production in Pakistan. In 2018, the demand crossed 20,223MW, compared to peak generation of 15,400 to 15,700MW as by the Ministry of Water and Power. Country faces a deficit of almost 4000MW to 5000MW for the duration of 2019 hot summer term. Focus on one aspect considering Demand Side Management (DSM) cannot oversea the reduction of gap between power demand and customer supply, which eventually leads to the issue of load shedding. Hence, a scheduling scheme is proposed in this paper called RPSMDSM that is based on selection of those appliances that need to be only Turned-On, on priority during peak hours consuming minimum energy. The Home Energy Management (HEM) system is integrated between consumer and utility and bidirectional flow is presented in the scheme. During peak hours of electricity, the RPSMDSM is capable to persuade less power consumption and accomplish productivity in load management. Simulations show that RPSMDSM scheme helps in scheduling the electricity loads from peak price to off-peak price hours. As a result, minimization in electricity cost as well as (Peak-to-Average Ratio) PAR are accomplished with sensible waiting time.