Water quality of the Lake Youngrang in the Sokcho City is eutrophic. Jangcheon is the largest inflow source to the lake. Major pollutant sources are stormwater runoff from resort areas and various land uses in the Jangcheon watershed. A storm sewer on the southern end of the lake is also an important pollution source. In this study, water quality modelling for Lake Youngrang was carried out considering the rainfall-runoff pollution loads from the watershed. The rainfall-runoff curves and the rainfall-runoff pollutant load curves were derived from the rainfall-runoff survey data during the recent 4 years. The rainfall-runoff pollution loads and flow from the Jangcheon watershed and the storm sewer were estimated using the two kinds of curves, and they were used as the flow and the boundary data of the WASP model. With the measured water quality data of the year 2005 and 2006, WASP model was calibrated. Non-point pollution control measures such as wet pond and infiltration trench were considered as the alternative for water quality management of the lake. The predicted water quality were compared with those under the present condition, and the improvement effect of the lake water quality were analyzed.
In South Korea, minimum reserve rate, which is to satisfy reliability standard, has been determined by simulation result using WASP. But, it is still controversial whether the level of minimum reserve rate is adequate. Thus, in this study, various analyses of minimum reserve rate are being conducted. WASP uses the probabilistic simulation technique to evaluate whether reliability standard is satisfied. In this process, forced outage rate and maintenance periods of each generator play important roles. Especially, the long-term plan can be varied depending on how maintenance periods deal with. In order to model maintenance periods in the probabilistic simulation technique, WASP uses derating method. However, broad analyses have to be conducted because there are various ways including derating method to model maintenance periods which result in different results. Therefore, in this paper, 3 different maintenance outage rate modeling methods are applied to arbitrarily modeled system based on the basic plan for long-term electricity supply and demand of South Korea. Results show impact of each modeling method on minimum reserve rate.
Lately water quality of Daechong Reservoir has become more eutrophicated than ever before and there has been much concern over especially the eutrophication of the embayment near Daejon and Chongju Water Intake Tower every summer. The purpose of this study is to predict the impact of change in the pollutant loading, flowrate, nitrogen and phosphorus release from sediment, SOD(sediment oxygen demand) upon the water quality of Daechong Reservoir by WASP5/EUTR05 in order to suggest water quality management alternatives. The data of Sep. 1995 were used for the calibration of the model and those of Sep. 1997 was for verification. The result of the modeling can be summarized as follows. 1. The 50% increase(decrease) of pollutant loading has caused that of T-N concentration by 0.10-0.14 mg/l, T-P concentration by 0.003-0.005 mg/l, and CBOD concentration by 0.16-0.18 mg/l. But the ratio of DO change by the change of pollutant loading was relatively small. 2. The sensitivity test of NH4 flux to T-N and that of P04 flux to T-P shows that T-N and T-P concentration were changed more in the epilimnion segments (SEG4, SEG5, SEG6, SEG7) than the other segments. As SOD increases, DO was predicted to decrease more especially in the hypolimnion (SEG9-SEG14). 3. As flowrate increase, the concentration of T-N, T-P, and CBOD were predicted to decrease, but DO concentration increased especially in the hypolimnion segments(SEG11, SEG12, SEG13, and SEG14). As the flowrate changed from $119m^3/sec$ to $50m^3/sec$, the concentration of T-N and CBOD in the hypolimnion was predicted to decrease.
본 연구에서는 도암댐 유역을 대상으로 유역모형과 호소 및 하천모형의 연계를 통해 통합모델링시스템을 구축하였다. 국내 기후 특성상 하절기에 집중되는 강우로 인해 댐의 건설은 홍수조절, 용수확보 및 전력생산 등의 목적에 있어서 불가피하다. 특히 이러한 목적의 댐 형태가 하천과 하천 사이에 위치할 경우에는 연계된 구간을 하나의 유역으로 보고 이를 통합적으로 모의 및 관리 할 수 있는 시스템이 필요하다. 본 연구에서는 도암댐 유역을 대상으로 유역모형인 SWAT 모형을 구축하고 저수지 및 하천의 수리 및 수질 모의를 위해 EFDC-WASP 모형을 구축하였다. 또한 현재 도암댐 상부에서 시범가동 중인 수질개선장치 효율이 반영된 시나리오를 모의하여 통합모델링시스템의 적용성을 검토하였다.
WASP5 모형을 새만금호에 적용하여 모형의 매개변수 추정을 수행하였다. 추정방법으로는 수질항목 및 매개변수들을 몇 개의 군으로 나누어, 각 군의 매개변수들을 시행착오법에 의하여 순차적으로 추정하는 방법을 사용하였다. 모의 수질항목으로서 엽록소 a, 질소 순환요소들, 인순환요소들, BOD 및 DO 등을 포함하였으며, 복잡도 4에서 수질을 모의하였다. 새만금 담수호의 전체유역을 수 개의 물수지 단위 소유역으로 구분하여 물수지 분석을 하였다. 본 연구에서는 물수지 분석모형에 의한 1975년부터 1996년까지 22년간 월별 평균유입량을 산정하여 모형의 상류경계단에서의 유량 입력자료로 이용하였다. 1997 및 1998년의 수질측정자료는 계절별 평균치와 함께 계절별 매개변수의 보정 및 검증에 각각 사용하였다. 수질항목 및 관련 매개변수들을 계열별로 분류하여 추정하는 것이 많은 수의 매개변수 추정에 있어서 효율적인 방법임을 알 수 있었다. 모형의 보정 및 검증 결과, 유기물의 비점오염원에 대한 정량적 평가가 필요함을 알 수 있었다.
경인아라뱃길은 한강하류와 서해를 잇는 국내 첫 인공운하이다. 아라뱃길 내에는 한강갑문으로부터 유입되는 담수와 서해갑문으로부터 유입되는 해수가 혼합됨으로써 염분 분포 및 성층특성이 발달되면서 복잡한 수리동역학적 특성을 나타낼 수 있으며 그에 따라 수질 특성도 크게 영향을 받을 것으로 판단된다. 본 연구에서는 운하 내의 염분 및 수온을 고려하여 3차원적인 수리동역학적 특성을 예측할 수 있는 EFDC (Environmental Fluid Dynamics Code)모델과 이에 따른 수질현상을 고려할 수 있는 WASP (Water Quality Analysis and Simulation Program)모델을 연계하여 사용함으로써 갑문 운영에 따른 3차원 시공간적 수리 및 수질특성을 예측할 수 있는 시스템을 구축하였다. 해수가 유입되는 서해갑문 측의 수질은 대체적으로 양호한 것으로 나타났으나 한강갑문 방향으로 이동할수록 수질은 점점 악화되는 것을 확인할 수 있었다. 또한 봄철 및 가을철에 경인아라뱃길 주운수로 내에서는 DO가 2 mg/L 이하로 감소되는 등 빈 산소층이 형성되었으며, 체류시간 증가에 의한 BOD에 의한 DO소모가 가장 큰 원인으로 작용하는 것으로 추정된다. 따라서 운하 내의 빈산소 현상을 제어하기 위해서 자체적으로 BOD 농도를 개선하기 어려운 경우 수체의 체류시간을 단축시켜서 운영하는 방법을 선택하는 것이 바람직할 것으로 판단된다.
Investigated was the effectiveness of a constructed wetland system on water quality in Hwa-Ong estruarin reservoir, located in Hwasung-Gun, Kyunggi-Do. Procedures for estimation of pollutant loading from watershed and required area for natural systems, and simulation of corresponding reservoir water quality were reviewed. Generally, simulated reservoir water quality was within the reasonable range, and about 15% of total polder farmland was required to meet the agricultural water quality standards. The model was applied based on the current loading condition without additional treatment systems. Wetland system is an ecologically sound treatment system. Therefore, natural systems can be an alternative measure for water quality improvement in polder projects. The area for natural systems was estimated using literature value which might be acceptable at the planning stage. However, pilot system and its experimental data are requisite for large scale field application. WASP5 was proved to be a useful and versatile model, and its application to estuarine reservoir water quality simulation was thought to be appropriate.
Recently reservoir is polluted by concentrative development of urbanization. Accordingly, the prediction of water quality has import meaning for protecting of water quality pollution. This study was carried out to predict water quality of Gyung Cheon reservoir by WASP5. We have established an integrated system on the basis of web, which predicts the future quality of water through water quality model, WASP5 based on information of water environment in a reservoir for agriculture, uniting expert system which supports the determination to set up measures for improving the quality of water to cope with the result.
The Anyang stream is one of the Han river in Seoul Metropolitan area. It is 35.1km long, has a basin area of $282.26km^2$ and touches seven cities of Kyounggido and some of Seoul Metropolitan area. The situations of Anyang stream have resulted in severe stream water pollution problems. The purpose of this study were to measure the hydraulic characteristics and water quality, to make the countermeasures to achieve the stream water quality, to suggest the future conditions to improve water quality trough the Hydrodynamic and Water Quality Modal(WASP4). As the result of Anyang stream water quality forecsat, they are follows. Sewerage systems in the watershed of the Anyang stream have to be amended for wrong systemn and constructed in the upstream area of Anyang. The discharge of industrial wastewater has to be throughly controlled from the upstream area of the Anyang stream. Hydrodynamic and Water Quality Model(WASP4) for this study revealed the future water quality of the Anyang stream by computer simulation.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.