In this study, WASP6 was used to predict the water quality of the reservoir and the lake. This can help the managers make the right choice of water quality policy. The results through studying are below. Raw pollutant load caused by the tourists in pollutant load of the study area takes 91.66% and 92.75% in total amount T-N, T-P. It showed high value when compared to raw pollutant load by land and stock farm and it seems that the main contamination is the population of tourists. From the result of the prediction model, BOD will increase about 1.5 times, T-N and T-P will be 1.5 times in 2012. It means that some counter plan is needed to reduce pollutant load. Enviroment grade of Suokjeong reserver is in I~II grade which is in good condition comparatively. However, the water contamination will be in poor as the year passes. when considering T-N T-P, which are the nutrients to control eutrophication, the concentrated administration about contamination sources is in urgent.
Journal of Korean Society of Coastal and Ocean Engineers
/
v.5
no.3
/
pp.221-231
/
1993
WASP4. an estuarine or lake water quality model, wat applied to simulate future water qualities at alternative withdrawal sites for capital areas. Simulated water quality constituents were Chlorophyll a, nitrogen cycles, Phosphorus, BOD End DO. A Water budget analysis Using the monthly records of reservoir inflows and outflows between 1986 and 1990 was made to determine seasonally-averaged flowrates at model boundaries. Estimated flowrates were used. together with the seasonal water quality inputs simulated by the QUAL2E model, for the simulation of future water qualities. Sensitivities to the future pollutant inputs and possible future withdrawal alternatives were also analyzed. From simulations or future water qualities it is found that among the candidate withdrawal sites. the one located at the downstream end of the North Han River has the best future water quality in all quality constituents and the one at the downstream end of the South Han River has the worst Possible future withdrawal from the North Han River brings a slight increase or pollutant concentrations at existing withdrawal sites. but the aggravation of water quality is not significant.
Kim, Ji-Hoon;Song, Chang-Geun;Kim, Young-Do;Seo, Il-Won
Journal of Korea Water Resources Association
/
v.45
no.3
/
pp.331-347
/
2012
The downstream of the Nam River Dam is crucial region for long-term water resource planning for Busan and Gyeongnam Province. Thus, the analysis of flow behavior and water quality is necessary for the sustainable surface water management and the control of pollutant source. In this study, the flow field and BOD transport at the downstream of Nam River Dam were analyzed by incorporating 2-D water quality model, RAM4 and 3-D water quality model, WASP with the hydrodynamic model, RAM2 and EFDC, respectively. The application of 2-D flow analysis model, RAM2 showed that velocity distributions at the five transverse sections of the meandering part closely followed the measured values by ADCP, and the flow field and overflow characteristic at the submerged weir showed satisfactory performance compared with the result of 3-D EFDC model. In addition, the BOD concentration field obtained by RAM2-RAM4 coupled modeling was in good agreement with the result by EFDC-WASP model throughout the computational domain. The hydrodynamic characteristic and water quality at the downstream reach of Nam River Dam are mainly influenced by the Dam discharge, and the water quantity is closely related to the water quality control and fishery environment at the lower part of Nakdong River. Therefore, when further quantitative analysis is necessary regarding these issues, 2-D semi-coupled modeling is recommended in terms of computational effectiveness and model application aspect.
The Transactions of The Korean Institute of Electrical Engineers
/
v.58
no.3
/
pp.462-466
/
2009
The power expansion planning is large and capital intensive capacity planning. In the past, the expansion planning was established with the proper supply reliability in order to minimize social cost. However, the planning can't use cost minimizing objective function in the power markets with many market participants. This paper proposed the power expansion planning model using multi-criteria decision rule. This model used multi objective function considering not only cost minimizing but also GENCO's intension. This paper compared proposed model with WASP model in order to verify the result of proposed model.
Proceedings of the Korea Water Resources Association Conference
/
2010.05a
/
pp.1079-1083
/
2010
Due to summer rainfall is concentrated in the construction of the reservoir and the dam was inevitable. The character of these structures are different from the common rivers have been characterized. According to this problem, we need to adopt to this area with three dimensional model. Construction of dams for preservation of land, utilization of water resources, and exploitation of energy potential, which is a basic element of countries' development, is regarded as indispensable for peoples. In addtion, the development of the Nakdong River nutrient and pathogen Total Maximum Daily Loads (TMDL) required that the full range of pollutants, sources, and flow conditions, typical of heavily urbanized areas, be addressed for a single water body with 1-D simulation model (river) and 3-D simulation model (reservoir). The objective of this study is to simulate the applicability of reservoir with the coupling of 3-D hydrodynamic and water quality models to estimate water balance and pollutant loading in Namgang Dam(Jinyang reservoir).
The current industrial development and the increase of population in Daecheong Reservoir basin have produced a rapid increase of wastewater discharge. This has resulted in problem of water quality control and management. Although many efforts have been carried out, reservoir water quality has not significantly improved. In this sense, the development of water quality management system is required to improve reservoir water quality. The goal of this study is to design a GIS-based water quality management system for the scientific water quality control and management in the Daecheong Reservoir. For general water quality analysis, WASP5 model was applied to the Daecheong Reservoir. A sensitivity analysis was made to determine significant parameters and an optimization was made to estimate optimal values. The calibration and verification were performed by using observed water quality data for Daecheong Reservoir. A water quality management system for Daecheong Reservoir was made by connecting the WASP5 model to ArcView. It allows a Windows-based Graphic User Interface(GUI) to implement all operation with regard to water quality analysis. The proposed water quality management system has capability for the on-line data process including water quality simulation, and has a post processor far the reasonable visualization for various output. The modeling system in this study will be an efficient NGIS(National Geographic Information System) far planning of reservoir water quality management.
Park, Kyung-Chul;Ahn, Kyu-Hong;Yeon, Ick-Tae;Kang, Seon-Hong
Journal of Korean Society of Water and Wastewater
/
v.14
no.2
/
pp.174-180
/
2000
In this study two water quality models, widely used in Korea, WASP5 and SWRRB were applied to Lake Paldang. The simulated results were compared with the measured data. The simulation results using WASP5 showed that this model could reasonably predict the concentrations of $NO_3$-N, Organic N, and Organic P. In order to investigate the effect of pollution by non-point source SWRRB was simulated and the concentrations of nutrients were predicted. The results from WASP5 and SWRRB are not directly comparable because their input data are different and output values are differently presented. Therefore, if these two simulation models were applied simultaneously, many valuable data and information could be obtained due to their own applicabilities and advantages.
Ho Jong-Kwang;Oh Kyung Seok;Kim Kyung-Won;Hwang Byung-Gi
Proceedings of the KAIS Fall Conference
/
2004.06a
/
pp.300-302
/
2004
감천의 지류인 부항천 유역에 조성될 댐 건설로 인한 인공호의 호수내 수질변화를 예측하기 위하여 WASP5 모형을 이용하였다. 모의결과 현재 수준으로 오염부하가 지속될 경우 2011, 2016, 2021년에 대하여 COD 기준으로 2.07mg/L, 1.93mg/L, 1.84mg/L로 각각 감소하는 것으로 예측되었으며 호소 수질기준 2등급 수준으로 나타났다. 따라서, 수질농도를 원하는 수준으로 낮추기 위하여 유역의 수질보존 대책이 이행되어야 하며, 수질보존 대책이 이행되었을 경우는 COD농도는 1.06mg/L로 감소하는 것으로 나타났다.
This paper presents an engineering approach to derive the optimum price levels of transacted power. In this paper, with the assumption that power import is possible through the system connection in Northeast Asia regions, the upper price limit of imported power deserving economic efficiency was derived with respect to the time and amount of power import. The proposed approach was demonstrated based on the data from the National Power Development Planning in 2004 with the WASP model.
Kim, Yang-Il;Chung, Koo-Hyung;Han, Sock-Man;Kim, Bal-Ho
The Transactions of The Korean Institute of Electrical Engineers
/
v.56
no.3
/
pp.481-490
/
2007
WASP which is used to plan generation expansion has disadvantages that can't manage environmental factors and regional supply-demand planning. But with the effectuation of the United Nations Framework Convention on Climate Change (UNFCCC) and Kyoto Protocol, it is expected that reducing greenhouse gases affects power system in its long-term generation expansion planning. Therefore national countermeasures is needed. This paper formulates a mathematical model considering CO2 emission constraints and Emission Trading that will be enforced. This model is based on the MEFISET (Model for Economic Feasibility of Interstate Electrical Ties) which was made by Korea Energy Economics Institute and Hong-ik university and manages generation expansion planning. And this mathematical model is verified by studying a case system.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.