Development of design chart for estimating penetration depth of dynamically installed Hall anchors in soft clays

  • Haijun Zhao;Zhaohan Zhu;Jiawei Che;Wanchun Chen;Qian Yin;Dongli Guo;Haiyang Hu;Shuang Dong
    • Geomechanics and Engineering
    • /
    • v.34 no.2
    • /
    • pp.209-220
    • /
    • 2023
  • In this study, a series of three-dimensional numerical analyses were carried out to investigate the penetration performance of a dynamically installed Hall anchor. The advanced coupled Eulerian-Lagrangian (CEL) technique was adopted to accurately simulate the large soil deformation during the vertical penetration of a Hall anchor. In total, 52 numerical analyses were conducted to investigate the relationship between anchor penetration depth and the initial kinematic energy. Moreover, a sensitivity analysis was performed to investigate the effects of soil shear strength and soil type on the penetration mechanism of a drop anchor under self-weight. There is a monotonic increase in the penetration depth with an increasing anchor weight when the topsoil of the riverbed is not subjected to erosion. On the other hand, all the computed depths significantly increase when soil erosion is taken into consideration. This is mainly due to an enhanced initial kinematic energy from an increased dropping depth. Both depths increase exponentially with the initial kinematic energy. An enhanced shear strength can potentially increase the side resistance and end-bearing pressure around a drop anchor, thus significantly reducing the downward penetration of a hall anchor. Design charts are developed to directly estimate penetration depth and associated plastic zone due to dynamically installed anchor at arbitrary soil shear strength and anchor kinematic energy.

Crack Damages in Exterior Wall Structures of Korean High-Rise Apartment Buildings Based on Nonlinear Finite Element Analysis (비선형 유한요소해석 기반 국내 고층아파트 외벽구조의 균열손상 특성 분석)

  • Kim, Sung Hyun;Mo, Sang Yeong;Kim, Si Hyun;Choi, Kyoung Kyu;Kang, Su Min
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.28 no.1
    • /
    • pp.47-57
    • /
    • 2024
  • Recently, in newly constructed apartment buildings, the exterior wall structures have been characterized by thinness, having various openings, and a significantly low reinforcement ratio. In this study, a nonlinear finite element analysis was performed to investigate the crack damage characteristics of the exterior wall structure. The limited analysis models for a 10-story exterior wall were constructed based on the prototype apartment building, and nonlinear static analysis (push-over analysis) was performed. Based on the finite element (FE) analysis model, the parametric study was conducted to investigate the effects of various design parameters on the strength and crack width of the exterior walls. As the parameters, the vertical reinforcement ratio and horizontal reinforcement ratio of the wall, as well as the uniformly distributed longitudinal reinforcement ratio and shear reinforcement ratio of the connection beam, were addressed. The analysis results showed that the strength and deformation capacity of the prototype exterior walls were limited by the failure of the connection beam prior to the flexural yielding of the walls. Thus, the increase of wall reinforcement limitedly affected the failure modes, peak strengths, and crack damages. On the other hand, when the reinforcement ratio of the connection beams was increased, the peak strength was increased due to the increase in the load-carrying capacity of the connection beams. Further, the crack damage index decreased as the reinforcement ratio of the connection beam increased. In particular, it was more effective to increase the uniformly distributed longitudinal reinforcement ratio in the connection beams to decrease the crack damage of the coupling beams, regardless of the type of the prototype exterior walls.

Study on the Improvement of Stow Net Fishing Technique and the Enlargement of Fishing Ground to the Distant Waters - 1 . Model Experiment of the Net - (안강망어법의 개량과 어장의 원해로의 확대를 위한 연구 - 1 . 어구의 모형실험 -)

  • Lee, Byoung-Gee;Kim, Jin-Kun;Lee, Ju-Hee
    • Journal of the Korean Society of Fisheries and Ocean Technology
    • /
    • v.24 no.2
    • /
    • pp.55-64
    • /
    • 1988
  • Stow nets have widely been used in the western sea of Korea from the olden age. The original structure of a stow net is a large square-sectional bag net made of 4 netting panels, and the front fringes of top and bottom panels are connected to the top and bottom beams respectively. Wire ropes, which is originated from the holding anchor are gradually forked and biforked, and finally 4 pieces of wire rope (biforked pendants) are jointed to each beam. Much convenience caused by long and heavy beams were problemed, then some studies have been carried out to improve the net since 1930's. The most effective improvement were achieved in 1980 by Mr. Han and his colleagues. The key point of improvement was that the beams were removed and the belt shaped shearing device made by canvas was attached to the side panels, the head rope and ground rope to the front fringe of top and bottom panel, and biforked pendants are joined to the shearing device. Even though this is the epoch-making improvement of a stow net, the further study should be required to find out more effective method. The authors carried out a model experiment on the stow net to determine the vertical and horizontal opening of a net mouth, and also examine the front, top and side-view configuration of the net. The model net was constructed depending on the Similarity Law of Fishing Gear in 1/10 and 1/20 scale and set against to the current at shallow and speedy flowing channel. The vertical and horizontal openings were determined by using scaled bamboo poles, and the configuration was observed by using specially prepared observation platform and underwater observation glass, and also photographed by using specially prepared underwater photographic equipment. The results obtained can be summarized as follows: 1. The opening height and width of the shearing device varied in accordance with the relative length of the biforked pendants. Considering the height and width of shearing device in 6 cases of the arrangement system of biforked pendants, the best result was obtained in the case that the 2nd, 3rd and 4th pendents from the bottom-most was 5%, 9% and 4% longer than that. 2. On the top-view configuration the excessive deformation of head rope and ground rope were observed. In the actual net, 54m long head rope and ground rope were attached to the front fringe of top and bottom panels so that the head rope may be lifted to make the net mouth open highly. But actually the head rope and the ground rope are streamed backward without any lift, and also the netting followed the ropes were deformed until the 2/5 in the whole length of the net. This deformation may be guessed to disturb the entrance of fish school into the net and also caused the net to get caught by obstacles in the sea bed and to be broken largely. 3. Hydrodynamic resistance R of the actual net may be deduced as R(kg)=29.2$\times$103 v1.65. It is also expressed as R(kg)=5.9$\times$d/l$\times$ab v1.65. depending on the formula deduced by Koyama to estimate the resistance of trawl nets, where d/l denote the ratio between diameter of netting twine and length of mesh leg in every part of side panel, a and b, the stretched circumference of the mouth and the stretched length of the net, respectively.

  • PDF

Evaluation of Construction Operation and Design Properties of CLSM for Corrugated Pipe in Underground (파형강관을 이용한 지하매설물용 뒤채움재 설계 및 시공성 평가)

  • Lee Kwan-Ho;Park Jae-Heon
    • International Journal of Highway Engineering
    • /
    • v.8 no.2 s.28
    • /
    • pp.63-74
    • /
    • 2006
  • During the construction of circular underground pipe, the non-proper compaction along the pipe and the decrease of compaction efficiency have been the main problems to induce the failure of underground pipe or facility. The use of CLSM (controlled low strength materials) should be one of the possible applications to overcome those problems. In this research, the full-scaled field test and the numeric analysis using PENTAGON-3D FEM program were carried out for three different cases on the change of backfill materials, including the common sand, the soil from construction site, and the CLSM. From the full-scaled test in field, the use of in-situ CLSM as backfill materials reduced the vertical and lateral deformation of the pipe, as well as the deformation of the ground surface. The main reason for reducing the deformation would be the characteristics of the CLSM, especially self-leveling and self-hardening properties. The measured earth pressure at the surround of the corrugated pipe using the CLSM backfills was the smaller than the other cases, and the absolute value was almost zero. Judging from the full-scaled field test and FEM analysis, the use of CLSM as backfill materials should be one of the best choices reducing the failure of the underground pipes.

  • PDF

Experimental study on the ground subsidence due to the excavation of a shallow tunnel (경사지반에서 얕은터널의 굴착에 따른 지표침하에 대한 실험적 연구)

  • Park, Chan Hyuk;Lee, Sang Duk
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.5
    • /
    • pp.761-778
    • /
    • 2017
  • The need of the underground space for the infrastructures in urban area is increasing, and especially the demand for shallow tunnels increased drastically. It is very important that the shallow tunnel in the urban area should fulfill not only its own safety conditions but also the safety condition for the adjacent structures and the surrounding sub-structure. Most of the studies on the behavior of shallow tunnels concentrated only on their behaviors due to the local deformation of the tunnel, such as tunnel crown or tunnel sidewall. However, few studies have been performed for the behavior of the shallow tunnel due to the deformation of the entire tunnel. Therefore, in this study the behavior of the surrounding ground and the stability caused by deformation of the whole tunnel were studied. For that purpose, model tests were performed for the various ground surface slopes and the cover depth of the tunnel. The model tunnel (width 300 mm, height 200 mm) could be simulationally deformed in the vertical and horizontal direction. The model ground was built by using carbon rods of three types (4 mm, 6 mm, 8 mm), in various surface slopes and cover depth of the tunnel. The subsidence of ground surface, the load on the tunnel crown and the sidewall, and the transferred load near tunnel were measured. As results, the ground surface subsided above the tunnel, and its amount decreased as the distance from the tunnel increased. The influence of a tunnel ceased in a certain distance from the tunnel. At the inclined ground surface, the wider subsidence has been occurred. The loads on the crown and the sidewall were clearly visible, but there was no effect of the surface slope at a certain depth. The load transfer on the adjacent ground was larger when the cover depth (on the horizontal surface) was lager. The higher the level (on the inclined surface), the wider and smaller it appeared. On the shallow tunnel under inclined surface, the transfer of the ambient load on the tunnel sidewall (low side) was clearly visible.

Shear Behavior of Reinforced Concrete Beams Strengthened with Unbonded-Type Wire Rope Units (비 부착형 와이어로프로 보강된 철근콘크리트 보의 전단 거동)

  • Kim, Sun-Young;Byun, Hang-Yong;Sim, Jae-Il;Chung, Heon-Soo;Yang, Keun-Hyeok
    • Journal of the Korea Concrete Institute
    • /
    • v.19 no.1
    • /
    • pp.83-90
    • /
    • 2007
  • The present study reports a simple unbonded-type shear strengthening technique for reinforced concrete beams using wire rope units. Fifteen beams failed in shear were repaired and strengthened with wire rope units, and then retested to failure. Influence of the prestressing force, orientation and spacing of wire rope units on the shear behavior of strengthened beams having shear span-to-depth ratios of 1.5, 2.5, or 3.25 were investigated. Test results showed that beams strengthened with wire rope units exhibited a higher shear strength and a larger post-failure deformation than the corresponding original beams. Inclined wire rope units was more effective for shear strength enhancement than vertical wire rope units. The increase of the prestressing force in wire rope units causes the decrease of the principal tensile stress in concrete, as a result, the diagonal tensile cracking strength of strengthened beams was higher than that of the corresponding original beams. Shear capacity of strengthened beams is compared with predictions obtained from ACI 318-05 and EC 2. Shear capacity of strengthened beams having shear span-to-depth ratio below 2.5 is reasonably predicted using ACI 318-05 formula. On the other hand, EC 2 overestimates the shear transfer capacity of wire rope units for beams having shear span-to-depth ratio above 2.5.

Behavior of Quaywall Pile by Lateral Movement of Revetment on Soft Ground (연약지반 호안의 측방유동에 따른 안벽 말뚝의 거동)

  • Shin, Eunchul;Park, Jeongjun;Ryu, Ingi
    • Journal of the Korean GEO-environmental Society
    • /
    • v.7 no.4
    • /
    • pp.53-62
    • /
    • 2006
  • Recently, the lateral displacement of the passive piles which are installed under the revetment on the soft ground is very important during the land reclamation work along the coastal line. The revetment on the soft clay develops the lateral displacement of ground when the revetment loading exceeds a certain limit. The lateral displacement of ground causes an excessive deformation of underground structure itself and develops lateral earth pressure against the pile foundation. The subject of study is to investigate the lateral displacement of pile foundation during the construction of container terminal at the ${\bigcirc}{\bigcirc}{\bigcirc}{\bigcirc}$ port in Incheon. The displacement of pile and the vertical settlement were measured in the field and finite element method(FEM) analysis for each construction sequence was performed using AFFIMEX(Ver 3.4). From the comparison of the results from field measurement and the finite element analysis, the settlement of the reventment has already occurred at the time of field measurements. Since then, the noticeable lateral displacement of piles and settlement were occurred during the filling of dredged soil inside the revetment dredging and reclaiming work. After completing filling, the lateral displacement and field settlement were reduced remarkably. Generally, the results from the finite element analysis show larger than those from the measurement.

  • PDF

Wave Forces Acting on Large Vertical Circular Cylinder and Consequent Wave Transformations by Full-Nonlinear Analysis Method after Wave Breaking (강비선형해석법에 의한 대형연직원주구조물에 작용하는 쇄파후의 파력 및 파랑변형)

  • Lee, Kwang-Ho;Shin, Dong-Hoon;Kim, Do-Sam
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.20 no.4
    • /
    • pp.401-412
    • /
    • 2008
  • Simulations of three-dimensional numerical wave tank are performed to investigate wave force acting on a large cylindrical structure and consequent wave deformation, which are induced by bore after breaking waves. The numerical model is based on the three-dimensional Navier-Stokes equations with a finite-difference method combined with a volume of fluid(VOF) method, which is capable of tracking the complex free surface, including wave breaking. In order to promote wave breaking of the incident wave, the approach slope was built seaward of the structure with a constant slope and a large cylindrical structure was installed on a flat bed. The incident waves were broken on the approach slope or flat bed by its wave height. In the present study, all waves acting on the large cylindrical structure were limited to breaking bore after wave breaking. The effects of the position of the structure and the incident wave height on the wave force and wave transformations were mainly investigated with the concern of wave breaking. Further, the relations between the variation of wave energy by wave propagation after wave breaking and wave force acting on the structure were discussed to give the understanding of the full-linear wave-structure interactions in three-dimensional wave fields.

Numerical Analysis for Fault Reactivation during Gas Hydrate Production (가스하이드레이트 개발과정에서의 단층 재활성화 해석)

  • Kim, Hyung-Mok;Kim, A-Ram
    • Tunnel and Underground Space
    • /
    • v.26 no.2
    • /
    • pp.59-67
    • /
    • 2016
  • In this paper, we perform a numerical analysis to evaluate the potential of fault reactivation during gas production from hydrate bearing sediments and the moment magnitude of induced seismicity. For the numerical analysis, sequential coupling of TOUGH+Hydrate and FLAC3D was used and the change in effective stress and consequent geomechanical deformation including fault reactivation was simulated by assuming that Mohr-Coulomb shear resistance criterion is valid. From the test production simulation of 30 days, we showed that pore pressure reduction as well as effective stress change hardly induces the fault reactivation in the vicinity of a production well. We also investigated the influence of stress state conditions to a fault reactivation, and showed that normal fault stress regime, where vertical stress is relatively greater than horizontal, may have the largest potential for the reactivation. We tested one simulation that earthquake can be induced during gas production and calculated the moment magnitude of the seismicity. Our calculation presented that all the magnitudes from the calculation were negative values, which indicates that induced earthquakes can be grouped into micro-seismic and as small as hardly perceived by human beings. However, it should be noted that the current simulation was carried out using the highly simplified geometric model and assumptions such that the further simulations for a scheduled test production and commercial scale production considering complex geometric conditions may produce different results.

A Study on 8-Stage Loading Method of the Scaffolding Module for LNG Carriers (LNG 운반선 비계 모듈의 8단 탑재 방안 연구)

  • Shin, Sang-Hoon;Ko, Dae-Eun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.11
    • /
    • pp.78-85
    • /
    • 2020
  • The scaffolding system, which is a construction workbench of the cargo containment for a membrane LNG carrier, is a large truss structure composed of various members. To shorten the installation period and process of the scaffolding system, it is effective to enlarge the mounting unit from the existing two stages to eight stages. Owing to the increase in lifting load according to the large size of the module, the stresses around the pin and hole will be increased significantly. In this study, a tensile strength test and contact stress analysis were performed to confirm the structural safety. The relatively large hole deformation was observed visually near the average load generated in the vertical pipe at the top through tensile strength tests. A contact stress calculation confirmed the stress distribution around the hole. The contact problem was dealt with in terms of the Herzian contact stress. The possibility of 8-stage loading was examined by comparing the yield strength and contact stresses of failure critical locations. As a result, the 8-stage loading method of the existing scaffolding material was inadequate, and a new loading method with proper safety is proposed.