• 제목/요약/키워드: Variable Construction

검색결과 830건 처리시간 0.026초

건설장비의 탄소배출량 산정에 미치는 유휴시간의 영향 분석 (Analysis of the Impact of Idle Time on the Estimation of Carbon Emissions of Construction Equipment)

  • 오상민;이동윤;강고운;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2017년도 춘계 학술논문 발표대회
    • /
    • pp.193-194
    • /
    • 2017
  • Effect of variable factors on carbon emissions in construction industry is hard to analysis. Therefore this study analyzies effect of variable factors on carbon emissions. This study shows importance of variable factors and emphasizes need of estimation of carbon emissions considering variable factors.

  • PDF

가변요인을 고려한 철골세우기 작업의 탄소배출 인과지도 개발 (Development of Carbon Emission Casual Map Considering Variable Factors in Steel Erection Work)

  • 남철우;이동윤;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 추계 학술논문 발표대회
    • /
    • pp.75-76
    • /
    • 2016
  • Because of variable factors in construction phase, measurement of carbon emission in construction industry is more difficult than in other industries. To enhance accuracy of the measurement, the impact of variable factors must be considered. In this paper, to understand the influence of variable factors in steel erection work, a carbon emission casual map was developed. The map demonstrates that the considerations of variable factors in measurement of carbon emission improves the accuracy. The results of this paper are expected to contribute to development of carbon emission casual map and carbon emission measurement model for the entire construction phase.

  • PDF

공공공사 기술형 입찰에서의 낙찰가격에 미치는 요인 분석 (Analysis of Factors Affecting Successful Bid Price in Public Construction Technical Bidding)

  • 이정웅;이성욱
    • 아태비즈니스연구
    • /
    • 제13권1호
    • /
    • pp.213-230
    • /
    • 2022
  • Purpose - The purpose of this study is to find out any potential factors for explanatory variables when calculating the virtual successful bid rate in case of no collusion. Design/methodology/approach - An empirical analysis was conducted in this study with a regression analysis that included 725 bid samples under the public construction technical type bidding. Findings - The result of the basic analysis showed that there are several factors affecting the successful bid rate. First, collusion variable; second, government variable; third, successful bidder design score variable and the number of bidder variable among bidding features; fourth, turnkey variable based on the alternative method; fifth, civil works variable and plant works variable based on building work; sixth, asset variable and the fourth-quarter performance difference variable. However, the technical proposal method variable among bidding features was found to be statistically insignificant in column(4). Research implications or Originality - The significance of this research is that new variable such as the government variable and the fourth-quarter performance difference variable were added in the regression model, which showed statistically significant research results.

인프라건설 프로젝트 리스크 분석에 따른 손실 정량화 모델 개발 연구: 교량프로젝트를 중심으로 (Development of Loss Model Based on Quantitative Risk Analysis of Infrastructure Construction Project: Focusing on Bridge Construction Project)

  • 오규호;안성진
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2022년도 봄 학술논문 발표대회
    • /
    • pp.208-209
    • /
    • 2022
  • This study aims to analyze the risk factors caused by object damage and third-party damage loss in actual bridge construction based on past insurance premium payment data from major domestic insurers for bridge construction projects, and develop a quantitative loss prediction model. For the development of quantitative bridge construction loss model, the dependent variable was selected as the loss ratio, and the independent variable adopted 1) Technical factors: superstructure type, foundation type, construction method, and bridge length 2) Natural hazards: flood anf Typhoon, 3) Project information: total construction duration, total cost and ranking. Among the selected independent variables, superstructure type, construction method, and project period were shown to affect the ratio of bridge construction losses, while superstructure, foundation, flood and ranking were shown to affect the ratio of the third-party losses.

  • PDF

비정형 초고층 건물의 골조공사를 위한 가변형 테이블폼 (A Variable Table Form for Concrete Structural Frame Work of Irregular-Shaped Tall Buildings)

  • 임현수;김태훈;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 추계 학술논문 발표대회
    • /
    • pp.35-36
    • /
    • 2011
  • Recently, an irregular-shaped super tall building has been increased, aiming toward landmarks of cityscape. However, the complex floor plan derived from an irregular shape requires considerable resources including time, cost, and effort to meet complex structural framework. Based on the motivation, the study proposes a table-form system that is variable slab form appropriate to an irregular shaped floor through improving limitations of an existing table-form system. The variable table-form is expected to reduce construction resources and improve constructability on an irregular floor plan of super tall buildings as well.

  • PDF

공기지연요소분석을 이용한 회귀분석 기반 초고층 내부공사의 생산성 예측 (Regression Technique-based Productivity Estimation conducting Construction Delay Factor Analysis on Interior Works in High-rise Building Construction)

  • 김현미;김태형;신영근;김영석;한승우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 춘계 학술논문 발표대회 1부
    • /
    • pp.191-192
    • /
    • 2011
  • The construction projects contain a lot of variables and risk affecting productivity. The duration of the project must be recognized important as for quality, unit cost and safety. There is need for improving work efficiency by investigating relationship of works to prevent delay. This study focuses on analysing the delay factors of steel staircase system to suggest regression model that enables construction productivity estimation. The position of the observers and construction delay factors were expressed by the independent variable of the regression model and productivity was expressed by a dependent variable. This paper suggests quantitative productivity and it is expected that will be helpful estimating application in construction new technologies.

  • PDF

An interpretable machine learning approach for forecasting personal heat strain considering the cumulative effect of heat exposure

  • Seo, Seungwon;Choi, Yujin;Koo, Choongwan
    • 한국건설관리학회논문집
    • /
    • 제24권6호
    • /
    • pp.81-90
    • /
    • 2023
  • Climate change has resulted in increased frequency and intensity of heat waves, which poses a significant threat to the health and safety of construction workers, particularly those engaged in labor-intensive and heat-stress vulnerable working environments. To address this challenge, this study aimed to propose an interpretable machine learning approach for forecasting personal heat strain by considering the cumulative effect of heat exposure as a situational variable, which has not been taken into account in the existing approach. As a result, the proposed model, which incorporated the cumulative working time along with environmental and personal variables, was found to have superior forecast performance and explanatory power. Specifically, the proposed Multi-Layer Perceptron (MLP) model achieved a Mean Absolute Error (MAE) of 0.034 (℃) and an R-squared of 99.3% (0.933). Feature importance analysis revealed that the cumulative working time, as a situational variable, had the most significant impact on personal heat strain. These findings highlight the importance of systematic management of personal heat strain at construction sites by comprehensively considering the cumulative working time as a situational variable as well as environmental and personal variables. This study provided a valuable contribution to the construction industry by offering a reliable and accurate heat strain forecasting model, enhancing the health and safety of construction workers.

DEA와 PCA를 이용한 건설기업의 핵심 투입-산출변수 추출에 관한 연구 (A Study on the Extracting the Core Input and Output Variables in Construction Company using DEA and PCA)

  • 이경주;박정로;김재준
    • 한국건설관리학회논문집
    • /
    • 제13권5호
    • /
    • pp.94-102
    • /
    • 2012
  • 최근 글로벌 금융위기, 미분양 주택의 증가 등으로 인해 건설기업의 효율성 분석이 요구되고 있다. 기업에 대한 효율성 분석시 가장 중요한 것은 효율성 측정에 사용된 투입-산출변수이다. 하지만 건설기업의 효율성 분석에 중요한 영향을 미치는 핵심적인 투입-산출변수를 추출하기 위한 체계적인 연구는 미흡하였다. 따라서 본 연구에서는 건설기업의 효율성 분석을 위한 핵심 투입-산출변수를 추출을 위해 투입-산출변수 별로 모든 조합을 제시한 모형을 제시하고 DEA모형과 PCA분석을 통하여 건설기업의 효율성을 분석에 중요한 요소인 투입-산출변수를 추출하고자 한다. 본 연구를 위해 기존 연구 및 이론적 고찰을 하고, 효율성 측정을 위한 변수 및 21개 모형을 설정하였다. 다음으로 효율성 및 PCA분석을 하고 결과를 도출하였다. 연구 결과, 핵심적인 투입 및 산출변수는 2006년의 경우 투입변수는 종업원수, 산출변수는 매출액, 2008년의 경우 투입변수는 자본금, 산출변수는 당기순이익, 2010년의 경우 투입변수는 고정자산, 산출변수는 매출액으로 나타났다. 건설기업 효율성 결과에 중요한 영향을 주는 변수 추출을 통해 개별 건설기업들이 효율성을 향상하기 위한 중점전략을 마련할 수 있을 것으로 판단된다.

LED 도로전광표지 시스템에 대한 시인성 분석 및 성능 인자 연구 (A Study on the Performance Index and visibility for LED Variable Message Sign)

  • 최숙양;김면중;조한익;문학룡;변상철;류승기
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2002년도 하계학술대회 논문집 B
    • /
    • pp.1286-1288
    • /
    • 2002
  • 본 연구에서는 차세대 교통체계인 첨단교통 시스템(ITS)에서 차량 운전자 및 도로이용자에게 도로 및 교통정보를 제공하기 위하여 설치 및 운영되고 있는 도로전광표지(Variable Message Sign : VMS)의 시인성을 분석하기 위하여, 가장 중요한 기초 변수인 휘도와 색도를 측정하였다. 측정치를 통하여 VMS의 휘도와 색도가 시인성을 판별할 수 있는 성능 인자로써 가능한지를 검토하고, 향후 VMS 시스템의 설치 및 관리 기술에 실무요령의 활용 여부를 검토한다.

  • PDF