• Title/Summary/Keyword: VE성과

Search Result 74, Processing Time 0.021 seconds

Value Engineering Idea Generation for Temporary Construction Designs through Conflict Resolution (가시설 공사 설계VE 대안검토시 모순충돌 해결을 통한 아이디어 창출)

  • Hong, Soonheon;Baeg, Hangee;Moon, Sungwoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.6
    • /
    • pp.30-37
    • /
    • 2013
  • Idea creation is the most important step in the overall value engineering (VE) process. Usually the activity is done mostly relying on the experience and knowledge of the experts in the VE team. A more organized approach is needed to find the chance of design improvement during a VE workshop. This study presents an organized approach to increasing the chance of idea creation during the VE workshop. The concept of conflict resolution in TRIZ (Theory of Inventive Problem Solving) is applied to understand the problem area during design improvement. The technical parameters were identified in the problem area to explain the conflicts in design improvement. These technical parameters were used to assist problem solving and improve design functions. A case study was done on a temporary construction operation, and demonstrated that the organized idea creation can help improve the design value of the temporary construction operation.

Efficient Problem-Solving Idea Generation in the Design Phase VE of Construction Projects using Business Creativity Codes(BCC) (건설 설계VE의 효율적 문제해결 아이디어 도출을 위한 비즈니스 창의성 코드(BCC) 활용방안)

  • Kim, Huy-Qyou;Park, Young-Taek
    • Journal of the Korea Institute of Building Construction
    • /
    • v.16 no.4
    • /
    • pp.367-379
    • /
    • 2016
  • Although the importance of creative thinking is rapidly increasing in the new century, the generation of creative ideas and its application in the construction industry have been considered relatively difficult. Thus there have been a few studies on the subject that how to apply creative thinking tools with empirical evidence in the construction industry. Value engineering(VE) has been widely applied in the design phase of construction projects due to the government regulation, Brainstorming has been the most prevalent idea generation techniques in the VE activities during the past several decades. Contrary to popular belief, the performance of brainstorming is not so good. It is known as the brainstorming myth. This paper proposes the business creativity codes(BCC) as an alternative idea generation tool in the design phase VE of construction projects. In order to examine the effectiveness of the BCC, 50 successful field cases awarded in the design VE competition of government agency are used. The result shows that the BCC can be used as an effective idea generation tool in the design phase VE construction projects.

A Case Study of Construction Management for Pusan National University Children's Hospital (부산대학교 어린이병원 건립사업 CM 수행사례)

  • Yang, Jin-Kook;Ri, Min-Hyeon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.13-18
    • /
    • 2007
  • The construction by the ministry of health and welfare support of the first special hospital for only children in busan and gyeong-nam is under building with YPNUH(Yangsan Pusan National University Hospital) for the best medical treatment town and is to improve the productivity and efficiency by eliminating unproductive and inefficient fact through the construction management, systemic and scientific management technique. So in this study we would like to suggest the generated effect to apply project management technique to all stage such as from pre-design phase, turn-key enterprise choice, construction, design VE(Value Engineering), PMIS (Project Management Information System) construction to maintenance phase and cost and schedule reduction effect through basic, execution design VE by using engineer of field.

  • PDF

A Study on the Influence Factors for Virtual Enterprise (가상기업의 성과요인에 관한 연구)

  • Park, Kyung-Hye;Choi, Se-Yeon
    • Journal of Information Technology Applications and Management
    • /
    • v.14 no.1
    • /
    • pp.117-135
    • /
    • 2007
  • Globalization changes in market structures and consumer needs, as well as technology innovations force organizations to adopt new structures and collaborative networks to cope with rapidly changing environments. These Collaborative Networks are based on the Idea of virtual enterprise. A virtual enterprise(VE) is a temporary alliance of globally distributed independent enterprises that share core competencies and computer networks. This paper presents a proposal for a methodology to measure a key factor of success and risk First of all, we chose thirty experts' defines on virtual enterprise, fifteen are academic specialist and other fifteen are from industry. For this study we define twenty two factors determining VE's success and seventeen factors determining VE's risk using by Delphi method. And we built the influence model on virtual enterprise. A research model was established according to preceeding research and consensus on experts then the revised model of key factors on virtual enterprise. This survey was based on the Analytical Hierarchy Process (AHP). AHP is an approach to decision making that involves structuring multiple choice criteria into a hierarchy, the assessing the relative important of these criteria, comparing alternative for each criteria, and determining an overall ranking of the alternatives. A model was constructed as 3 level hierarchy. The hierarches are organizational, strategic, technical criteria. for success model on VE has 22 factors and 17 factors for risk model. They are selected by all 30 experts. 14 copies among 30 copies distributed to carry out on the Analytical Hierarchy Process (AHP). Consistency ratio confirm high validity and reliability of instrument and support theoretical model. The results of this study are summarized as follows. (1) This study presented success on VE influenced strategic criteria, and essential factor is Creating a value. Risk on VE influenced strategic criteria, and essential factor is Outcome/Distribution. (2) Its enable that ranking the criteria influence on VE. These are supported VE management and using guideline of VE.

  • PDF

An In-depth Analysis of Enhancing the Core Blueprint of Architectural Constructs Leveraging Value Engineering(VE) Techniques (VE 기법을 활용한 건축 구조물 코어 형식 개선 방안에 관한 연구)

  • Lee, Jae-Taek;Kim, Gyu-Yong;Lee, Jae-Hyun;Nam, Jeong-Soo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.5
    • /
    • pp.571-581
    • /
    • 2023
  • The contemporary domestic construction landscape has witnessed a contraction, primarily attributed to the operational challenges faced by construction entities and a downtrend in the initiation of new projects. In light of this, domestic construction enterprises are ardently seeking avenues to economize whilst simultaneously amplifying the quality across diverse construction genres. Value engineering (VE), heralded for its prowess in not only cost mitigation but also in accelerating project timelines and bolstering construction quality, has been extensively adopted in refining finishing tasks. However, its application to framework enhancements remains conspicuously limited. Particularly in factory edification, framing emerges as a pivotal process exerting significant influence over the entire construction continuum. Thus, it becomes imperative to integrate VE techniques at the inception phase of framing. This would facilitate a meticulous examination of design schematics and on-site conditions, paving the way for alternative strategies that condense construction durations, economize on costs, and augment work efficiency, all the while upholding paramount standards of quality and safety. Such a venture stands to be foundational in expediting construction timelines, fostering economic efficiency, and buttressing construction safety protocols.

A Model of Time Dependent Design Value Engineering and Life Cycle Cost Analysis for Apartment Buildings (공동주택의 시간의존적 설계VE 및 LCC분석 모델)

  • Seo, Kwang-Jun;Choi, Mi-Ra;Shin, Nam-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.133-141
    • /
    • 2005
  • In the resent years, the importance of VE (value engineering) and LCC (life cycle cost) analysis for apartment building construction projects has been fully recognized. Accordingly theoretical models, guidelines, and supporting software systems were developed for the value engineering and life cycle cost analysis for construction management including large building systems. However, the level of consensus on VE and LCC analysis results is still low due to the lack of reliable data on maintenance. This paper presents time dependent LCC model based value analysis method for rational investment decision making and design alternative selection for construction of apartment building. The proposed method incorporates a time dependent LCC model and a performance evaluation technique by fuzzy logic theory to properly handle the uncertainties associated with statistics data and to analyze the value of alternatives more rationally. The presented time dependent VE and LCC analysis procedure were applied to a real world project, and this case study is discussed in the paper. The model and the procedure presented in this study can greatly contribute to design value engineering alternative selection, the estimation of the life cycle cost, and the allocation of budget for apartment building construction projects.

A Case Study on the Development of an urinary incontinence-preventive equipment (요실금 예방 치료기 제품 개발 사례 연구)

  • Park, Roh Gook
    • Asia-Pacific Journal of Business Venturing and Entrepreneurship
    • /
    • v.7 no.4
    • /
    • pp.143-148
    • /
    • 2012
  • The problem of common difficulties for the implemented business that imposing the Value Engineering(VE) is crucial. Because of the difference in effect of VE by how an abstract concept as function digitize. Furthermore, to improve achievement of VE,, the advancement of VE is demanded. The most of business conducting the VE is pushing this method with the purpose of cost reduction. As explaining this product, the cost occupies the desktop of F1 and the component of product 54% with the result of analyzing the coefficient of functional requirement. Then the functional cost can be confirmed. Through the result of this study, the fact that the desktop, the bluetooth, the probe occupy the most of products with satisfying the function is able to confirm. An effort for cost reduction in purchasing through adjusting a stable quality demanded for the cost reduction is needed. Also, another effort of proper price reduction by diversification of buyer business is needed also.

  • PDF

A Case of Successful IMC Strategy Implementation focusing on both On-line and Off-line Promotion Plan (On-Line과 Off-Line을 결합한 IMC 전략의 성공적 실행사례 -두산건설과 웹넷코리아와의 공동마케팅 사례를 중심으로)

  • 안광호;임병훈
    • Asia Marketing Journal
    • /
    • v.4 no.1
    • /
    • pp.101-115
    • /
    • 2002
  • 현재 국내외의 많은 기업들이 고객과의 효율적인 커뮤니케이션을 위해 IMC 전략을 수립하고 있으며, 최근에는 인터넷 기술과 합쳐져 IMC 전략의 효율성 증대에 많은 변화를 가져오고 있다. 본 연구에서는 국내 주택시장에서 두산건설과 인터넷 패션전문업체인 웹넷코리아가 공동으로 We've 아파트 분양과정에서 시행된 on-line과 off-line 판매촉진의 통합적 활용과정과 성과에 대해 설명하였다. Off-line 행사와 함께 진행된 3차례에 걸친 판촉행사는 site traffic 증대, 판촉행사 참여, 그리고 분양현장으로의 고객유인과 구매에 이르기까지 높은 성과를 거둔 것으로 나타났다.

  • PDF