• Title/Summary/Keyword: University Cooperation Project

Search Result 566, Processing Time 0.026 seconds

A Post Assessment of Streetscape Improvement Projects Based on District Unit Plans (환경정비형 지구단위계획의 효과분석 - 건대앞 노유거리, 성신여대앞 하나로거리, 이대앞 찾고싶은거리를 중심으로 -)

  • Kang, Junmo;Park, Hyun Shin
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.1D
    • /
    • pp.89-98
    • /
    • 2010
  • The goal of this study is to investigate the achievement of street improvement projects based on district unit plans aiming at improving the urban streetscape. Post assessments are conducted for three streetscape improvement projects - Noyu street improvement project, Hanaro street improvement project next to Sungshin women's university, Chatgoshipun street improvement project in front of Ehwa women's university. The results of the post assessment indicate that the initial quality of streetscape has been improved after the projects. The long-term sustainability of the streetscape, however, was not achieved for the street improvement project applied at the street next to Sungshin women's university due to the lack of support from the community. It is found that the key component of success for the street improvement project is the strong cooperation between public and private parties.

A Study on Stable Operating for Buan S/S Byunsan D/L (2728 02) Power Distribution Area Connected with Wind Power Generator (부안 S/S 변산 D/L(2728 02) 공급구역을 대상으로 한 풍력발전시스템 계통연계 시 보호협조 방안)

  • Jang, Mi-Hye;Shin, Baek-Sik;Song, Weon-Jin;Kim, Yeong-Min;Kim, Dong-Yong
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2008.06a
    • /
    • pp.508-509
    • /
    • 2008
  • A creation of large and small scale wind farm was considered to proper already, as according to real Jeonbuk Saemangeum project. A grow larger to be construction of the new and renewable energy thema park as well as creation possibility of large scale wind farm afterward. Therefore, in this paper was proposed a counterplan on D/L protection cooperation of Buan S/S Byunsan D/L (2728 02) power distribution line in case of connected with wind power generator.

  • PDF

Characteristics of SocioExperimental Container Architecture for the Sustainable Urban Regeneration Focusing on WaiWai Container Project in Saga Prefecture, Japan - (지속가능한 도시재생을 위한 사회-실험적 컨테이너 활용특성 연구 -일본 사가현 와이와이 컨테이너 프로젝트를 중심으로-)

  • Choi, Soon-Sub;Oh, Joon-Gul
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.6
    • /
    • pp.176-187
    • /
    • 2018
  • The Korean government has been encouraging 'continuous' post-pump priming project management through relevant local personnel planning, action, and management, upon the selection of 68 sites for urban regeneration as part of the New Deal Project. This study assessed the utilization characteristics of containers, the socio-experimental temporary occupation facilities, as a tool for 'sustainable' urban regeneration. This is to identify the potential limitations of urban regeneration by the utilization of containers as public sector temporary occupation facilities and to provide adequate directions based on its efficacy. By comparing three Korean cases with the Japanese WaiWai project, in terms of 10 elements, the preoccupations with the social trend and scenery, and undifferentiated functions of the facilities focusing on the commercial or working aspects have been identified as limitations of Korean cases. Based on the analyses, the following are suggested as plausible approaches to utilize socio-experimental containers for sustainable urban regeneration: 1. Planning and management should be done by the same organization because the absence of the planning party's participation in the management likely leads to the pursuit of only profits. 2. Diversification and combinations of different utilization purposes of a single site and numerous planning of experimental container uses are in need. 3. Accommodations of heavy commercial uses lead to a decline in the continuity of follow-up projects and a change in the urban regeneration directions. Therefore, it is important to include a public socio-experimental program rather than a simple commercial or promotion program for the following urban renewal project.

Risk Factors Affecting Equipment Management in Construction Firms

  • PHAM, Cuong Phu;NGUYEN, Phong Thanh;PHAN, Phuong Thanh;NGUYEN, Quyen Le Hoang Thuy To;LE, Loan Phuc;DUONG, My Tien Ha
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.7 no.11
    • /
    • pp.347-356
    • /
    • 2020
  • Mechanization and automation constitute an essential stage in the production and operation of any company, as one of the determinants of increase in labor productivity and decrease in product price, while significantly contributing to shortening of the lead time. Businesses are, therefore, able to quickly put projects into operation, improving economic efficiency, quality, and aesthetics, which speeds up the national economic growth. For the construction industry to be the most effective, modern construction equipment is a necessity. It is one of the five main resources of a construction project. Thus, effective construction equipment management contributes to the success of a project and benefits the relevant construction companies economically. This paper presents the critical risk factors affecting equipment management and proposes suitable solutions. The questionnaire-based survey with experienced experts in the construction sector on the management of the likelihood and consequence of risk factors revealed thirty-two risks for equipment management in construction companies. These factors fell into six groups: (i) site organization-related risks; (ii) management-related risks; (iii) owner-related risks; (iv) supplier-related risks; (v) legal risks, and (vi) site condition-related and external risks. The results showed that management-related factors contributed to the most significant risks and problems for equipment management in construction companies.

Exploring Critical Risk Factors of Office Building Projects

  • NGUYEN, Phong Thanh;PHAM, Cuong Phu;PHAN, Phuong Thanh;VU, Ngoc Bich;DUONG, My Tien Ha;NGUYEN, Quyen Le Hoang Thuy To
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.8 no.2
    • /
    • pp.309-315
    • /
    • 2021
  • Risks and uncertainty are unavoidable problems in management of projects. Therefore, project managers should not only prevent risks, but also have to respond and manage them. Risk management has become a critical interest subject in the construction industry for both practitioners and researchers. This paper presents critical risk factors of office building projects in the construction phase in Ho Chi Minh City, Vietnam. Data was collected through a questionnaire survey based on the likelihood and consequence level of risk factors. These factors fell into five groups: (i) financial risk factors; (ii) management risk factors; (iii) schedule risk factors; (iv) construction risk factors; and (v) environment risk factors. The research results showed that critical factors affecting office building projects are natural (i.e., prolonged rain, storms, climate effects) and human-made issues (i.e., soil instability, safety behaviors, owner's design change) and the schedule-related risk factors contributed to the most significant risks for office buildings projects in the construction phase in Ho Chi Minh City. They give construction management and project management practitioners a new perspective on risks and risk management of office buildings projects in Ho Chi Minh City and are proactive in the awareness, response, and management of risk factors comprehensively.

Implementation of Web based Project Management System (웹기반 프로젝트 관리 시스템 개발 및 구현)

  • Kwon, Soon-Do;Lee, Myung-Soo;Cho, Dae-Jea
    • Proceedings of the KAIS Fall Conference
    • /
    • 2010.11a
    • /
    • pp.180-183
    • /
    • 2010
  • 프로젝트 관리란 프로젝트 요구사항을 충족시키는데 필요한 지식, 기량, 도구 및 기법 등을 프로젝트 활동에 적용하는 것을 말하며 현재 사회에서의 프로젝트의 복잡성과 다양성으로 인해 체계적인 관리의 필요성이 제기되고 있다. 본 논문에서는 현재 PMS 시장의 동태에 대해서 알아보고, 사용자 편의성에 기반을 둔 웹기반 Project Management System(이하 PMS)를 설계한다. 본 논문에서 설계한 PMS는 사업수행자용으로, 프로젝트 현황정보에 있어서는 복수 프로젝트를 지원토록 하고 주요기능은 단위 프로젝트용으로 설정하도록 웹기반 일반관리 및 공정관리 시스템의 구조를 설계하고 구현하였다.

  • PDF

A Research on the Importance of Decision Making in Process of Promoting an Urban Regeneration Project -Focused on Cheong-ju City- (도시재생 사업추진과정에서의 의사결정기준 중요도 -청주시를 중심으로-)

  • Kim, Joonghun;Oh, Hyoungseok;Baik, Minseok;Hwang, Jaehoon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.9
    • /
    • pp.431-439
    • /
    • 2016
  • Urban regeneration projects involve various stakeholders, which result in decision making processes that require long periods of time and cause many conflicts. This study aims to identify important factors in decision making for promoting an urban regeneration project. The analysis results utilizing AHP are as follows: Firstly, the analysis results identify the main considerations in the process of promoting urban regeneration projects as residents' opinion(0.393), involvement of local government(0.231), opinions of related experts(0.206) and master plan(0.169). Secondly, the key drivers of stakeholders' qualitative decision making were found to include sustainability(0.325), economic feasibility(0.277), ease of project implementation(0.232) and equity(0.166). Lastly, meaningful differences in the relative importance of key aspects of decision making were identified when respondents were grouped according to being aware or not aware of the urban regeneration project, as well as living on or living off the project site. The results of this study can be used to implement successful urban regeneration projects in the future.

Marine Tourism Development Strategy of the South Sea through Sustainable Management of Coastal Environment

  • Yhang, Wii-Joo
    • Journal of Navigation and Port Research
    • /
    • v.30 no.4
    • /
    • pp.295-302
    • /
    • 2006
  • This study is to integratedly examine coastal management policy and marine tourism development project for Korean coasts, especially for the South Sea of high development pressure, presenting sustainable tourism development policies for the future. To do so, it is examined central government-level coastal development projects set up by the Ministry of Culture and Tourism, the Ministry of Maritime Affairs and Fisheries and the Ministry cf Construction and Transportation, setting the direction of south coastal management and tourism development at a level of national territory planning. The problems of coastal management first and then the problems of the South Coast Tourism Belt Project are analyzed in order to present political and administrative alternatives. To overcome such problems and make Korea a marine tourism base in East Asia, there is a need for re-recognition of the value of the project and its continuous push through cooperation between central and local governments. Also, under the presupposition of consensus building among local people and the sustainable development of environments, there should be are-recognition that the future cf Korean marine tourism in the 21st-century and the success of an inverted $\pi-axis$ national development depend on the South coastal Tourism Belt Development Project.

A Study on Policies of the Ordering and Receiving System for Public e-Learning Project in Korea (공공 이러닝 프로젝트 수발주시스템 정책에 관한 연구)

  • Noh, Kyoo-Sung;Ju, Seong-Hwan
    • Journal of Digital Convergence
    • /
    • v.12 no.3
    • /
    • pp.29-36
    • /
    • 2014
  • The purpose of this study is to suggest a proper improvement direction of the public ordering and receiving system in related with e-Learning. The research methods for this paper are derived from survey about e-Learning companies and the written materials of the present public e-Learning project. According to the study, in most cases, the public e-Learning projects don't affect positively e-Learning company's businesses. It indicates that the public e-Learning project has three problems or improvement items. And as a solution to the problems, it presented the policy alternatives the policy alternatives as the concept of ordering and receiving system.

Migration Trajectories of North Korean Defectors: Former Returnees From Japan Becoming Defectors in East Asia

  • Han, Yujin
    • Journal of Contemporary Eastern Asia
    • /
    • v.19 no.2
    • /
    • pp.61-83
    • /
    • 2020
  • From 1959 to 1984, over 93,000 Koreans moved to North Korea from Japan as part of a repatriation project conducted during this time. Among them were people who had escaped from North Korea and immigrated to Japan and South Korea as well as the descendants of such people. This research examines the immigration trajectories of North Korean defectors related to the repatriation project and its effects on international relations in East Asia in a migration systems context. Specifically, it focuses on 26 North Korean defectors who have connections with Japan and settled in Japan and South Korea. It argues that the migration pathways of North Korean defectors linked with the repatriation project have been constructed with the cooperation of and amidst conflict between East Asian countries. To respond to the situation, North Korean defectors used their connections with Japan in amicable relations between Japan and China. However, after the relations went sour, defectors turned to informal transitional networks. If these strategies were unavailable, the defectors faced difficulties, unless they received social or capital support from the destination countries. After entering the destination country, those who settled in Japan have experienced different situations due to the inconsistency in administrative proceedings, while those in South Korea have been treated equally as other defectors. In this sense, some defectors have faced precarious situations in their immigration.