• Title/Summary/Keyword: Unit Load Method

Search Result 510, Processing Time 0.026 seconds

An Experimental Study on a Performance Evaluation of Internal Insulation of Buildings Over 20 Years Old (20년 이상 경과된 노후건축물의 단열재 성능평가에 관한 실험적 연구)

  • Kim, Hyun-Jin;Choi, Se-Jin
    • Journal of the Korea Institute of Building Construction
    • /
    • v.19 no.6
    • /
    • pp.539-547
    • /
    • 2019
  • Recently, the international community signed a climate change agreement to prevent global warming. Yet currently, the fossil fuels have been widely used in to supply building energy for cooling and heating. The Green Building certification (G-SEED), an energy efficiency rating for new or existing buildings requires that buildings meet certain conditions. Insulation is used as a building material to reduce the energy supply to buildings and to improve the thermal insulation, and it accounts for more than 90% of the total heat resistance provided by the building surface components that meet the energy-saving design standards of new buildings. In this investigation, a performance evaluation study was conducted through an experimental study by directly extracting the foam polystyrene insulation on-site during the remodeling of a building that was in the range of 22~38 years old. Through tests, it was found that the thermal conductivity of the extrusion method insulation (XPS) was reduced by 48% and the compressive strength of XPS decreased by 36% compared to KS M 3808, which is the initial quality standard. For bead method insulation (EPS) with a thickness of 50mm, the thermal conductivity, the compressive strength, and flexural failure load were similar to the initial quality standard. Therefore, in the calculation of the primary energy requirement per unit area per year, the performance of bead method insulation can be estimated simply by considering the thickness of the insulation, while a correction factor that considers its performance deterioration should be applied when extrusion method insulation is used.

A Study on Loading Method of Large Scaffolding Module for LNG Carriers Using TRIZ (TRIZ를 이용한 LNG 운반선 대형 비계 모듈의 탑재 방안 연구)

  • Park, Myeong-Chul;Shin, Sang-Hoon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.22 no.3
    • /
    • pp.94-100
    • /
    • 2021
  • To improve the productivity of cargo containment construction for a membrane LNG carrier, it is important to shorten the installation period and process of the scaffolding system, which is a construction workbench of a cargo containment for a membrane LNG carrier. As an effective method, opinions are being gathered to enlarge the lifting unit from the existing two stages to eight stages. On the other hand, the stresses around the pin and hole will increase significantly because of the increase in lifting load according to the large size of the module. The purpose of this study was to establish a new large module-lifting plan by introducing TRIZ to solve these problems. This study adopted a method to utilize 40 inventive principles, which is one of the various problem-solving tools of TRIZ. First, technical contradictions were derived, the engineering parameters were selected. Second, efficient inventive principles were selected to overcome the technical contradictions using a contradiction matrix. Finally, the general and specific solutions were derived through the selected inventive principle, and structural analysis confirmed that the stress generated in the structure was low. The utility of TRIZ was confirmed by the successful lifting of large modules using the established lifting method.

Development and Field Application of Apparatus for Determination of Limit State Design Strength Characteristics in Weathered Ground (한계상태설계법 지반정수 산정을 위한 풍화대 강도특성 측정장치의 개발 및 현장적용에 관한 연구)

  • Kim, Ki Seog;Kim, Jong Hoon;Choi, Sung-oong
    • Tunnel and Underground Space
    • /
    • v.30 no.2
    • /
    • pp.164-179
    • /
    • 2020
  • Applying the limit state design method to geotechnical structures, accuracy and reliability of its design are mainly affected by parameters for geotechnical site characteristics, such as unit weight, Poisson's ratio, deformation modulus, cohesion and frictional angle. When the structures are located in weathered ground, especially, cohesion and frictional angle of ground are closely related with decision of parameters for structures' load and ground's resistance. Therefore, the accurate determination of these parameters, which are commonly obtained from field measurement, such as borehole shear test, are essential for optimum design of geotechnical structures. The 38 case studies, in this study, have been analyzed for understanding the importance of these parameters in designing the ground structures. From these results, importance of field measurement was also ascertained. With these evaluations, an apparatus for determining the strength characteristics, which are fundamental in limit state design (LSD) method, have been newly developed. This apparatus has an improved function as following the ASTM suggestion. Through the field application of this apparatus, the strong point of minimizing the possibility of error occurrence during the measurement has been verified and authors summarized that the essential parameters for LSD can be qualitatively obtained by this apparatus for determination of strength characteristics of weathered ground.

Applicability of Composite Polyurea Method Considering the Required Performance in Underground Parking Lot Upper Slab (공동주택 지하주차장 상부슬래브의 요구성능을 고려한 복합형 폴리우레아 공법의 적용성 검토)

  • Lee, Jung-Hun;Choi, Eun-Kyu;Song, Je-Young;Kim, Soo-Yeon;Oh, Sang-Keun
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.7 no.3
    • /
    • pp.243-254
    • /
    • 2019
  • In this study, problems of the waterproofing methods in which water leakage occurs in the upper slab of the underground parking lot of apartment houses and the requirements considering the characteristics of the upper slab, and selected the appropriate performance(proposal) for the composite polyurea process are reviewed. As a result of the study, it is necessary to review performance such as responsiveness to upper slab of the multi-unit underground parking lot that is comprised of (1) crack and behavior responsiveness, (2) surface integrity, (3) vertical watertight stability, (4) pressure layer construction, (5) impact and pressure response and (6) vehicle moving load. As a result of evaluating 5 items corresponding to the requirements for the soft and hard complex polyurea, all of them were found to meet the conditions, and each materials were improved by compounding the materials that had problems when applying a single-ply method, thereby clarifying the advantages and disadvantages of the material property. However, in order to apply to the actual site, additional evaluation on site applicability such as mock-up evaluation should be conducted, and subsequent studies on the applicability of the market through review of economic feasibility and maintenance is required.

Estimation of Flows and Pollutant Loads from GIS Analysis using Cell-based Geospatial and Georgraphic Information Data (격자기반의 지형 및 지리정보자료와 GIS분석기법을 이용한 유역의 유출량 및 오염부하량 추정)

  • Cho, Jae-Myoung;Lee, Mi-Ran;Yun, Hong-Sik
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.29 no.4
    • /
    • pp.381-392
    • /
    • 2011
  • Pollutant loads calculated with unit factor method can not identity seasonal variations of pollutant inputs. Estimation of pollutant loads considering rainfall runoff can overcome these limits. SCS curve number method was applied to estimate runoff of each event of Koeup watershed of Koheung estuary lake. SCS curve numbers were calculated based upon land use, soil types of the catchment using GIS. Point and nonpoint source pollutant loads were summed up for total loads estimation. Those from nonpoint source were estimated by multiplying the calculated runoff and expected mean concentrations (EMC) presented by the Minister of Environment of Korea. DEM can present three dimensional views of a terrain, identity stream networks and flow accumulation. Furthermore, it can examine accumulated pollutant loads of specific point of a catchment. Therefore, cell based pollutant load estimation was attempted using DEM. ArcView was utilized to collect, store and manipulate spatial and attribute data of pollutant sources and features of the catchment. Cell-based DEM which was established by the GRID module of ARC/INFO was employed to estimate flows and pollutant loads.

CLINICAL AND RADIOGRAPHICAL EVALUATION OF IMPLANT-SUPPORTED FIXED PARTIAL PROSTHESES (임플랜트 지지 고정성 국소의치의 임상적, 방사선학적 평가)

  • Seo Ji-Young;Shim June-Sung;Lee Jae-Hoon;Lee Keun-Woo
    • The Journal of Korean Academy of Prosthodontics
    • /
    • v.44 no.4
    • /
    • pp.394-404
    • /
    • 2006
  • Statement of problem: A conventional 3-unit fixed partial denture design with a pontic between two retainers is the most commonly used. However in cases where the mental nerve is in close proximity to the second premolar, a cantilever design can be considered. As such, logical and scientific evidence is lacking for the number and position of implants to be placed for partially edentulous patients, and no clear-cut set of treatment principles currently exist. Purpose : The purpose of this study was to evaluate prognosis of implant-supported fixed partial dentures and to compare changes in bone level which may rise due to the different factors. Material and method : The present study examined radiographical marginal bone loss in patients treated with implant-supported fixed partial dentures (87 prostheses supported by 227 implants) and evaluated the influence of the span of the pontic, type of the opposing dentition. Clinical complications were studied using a retrospective method. Within the limitation of this study. the following result were drawn Result, 1. Seven of a total of 227 implants restored with fixed prostheses failed, resulting in a 96.9% success rate. 2. Complications encountered during recall appointments included dissolution of temporary luting agent (17 cases), porcelain fracture (8 cases), loosened screws (5 cases), gingival recession (4 cases), and gingival enlargement (1 case). 3. Marginal bone loss, 1 year after prosthesis placement, was significant(P<0.05) in the group that underwent bone grafting, however no difference in annual resorption rate was observed afterwards. 4. Marginal bono loss, 1 year post-placement, was greater in cantilever-type prostheses than in centric pontic protheses (P<0.05). 5. Marginal bone loss was more pronounced in posterior regions compared to anterior regions (P<0.05). 6. The degree of marginal bone loss was proportional to the length of the pontic (P<0.05). Conclusion: The success rate of implant-supported fixed partial dentures, including marginal bone loss, was satisfactory in the present study. Factors influencing marginal bone loss included whether bone graft was performed, location of the pontic (s), location of the surgical area in the arch pontic span. Long-term evaluation is necessary for implant-supported fixed partial dentures, as are further studies on the relationship between functional load and the number of implants to be placed.

Development and Lab-scale Plant Study of Coagulation Sedimentation Module using Cyclone (선회류를 이용한 응집침전모듈의 개발 및 실증 연구)

  • Moon, Jinyoung;Cho, Young-Gun;Song, Seung-Jun;Kim, Jin-Han
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.5
    • /
    • pp.3336-3344
    • /
    • 2014
  • The purpose of this study is small scale coagulation module is developed and demonstrated through a lab-scale test. Recent as a sewage treatment rate increases, have heightened the interest in the necessity on the nonpoint source and developing a small processing unit has been increased. Coagulation sedimentation module in this study is additional growth of floc through swirling in the outside zone, reduction of microstructure floc number and the internal settling zone through vertical/level flow complex sedimentation method after the coagulation process precipitation method as an effective high separation efficiency can be divided was also assessed. Coagulation sedimentation module can increase the load factor was 4.4 times compared to conventional clarifier base on the same volume and surface area through vertical/level flow. In this study, this process was selected formation and maintenance of swirling and uniform flow distribution in the internal settling zone as an important design factor, to derive its FLUENT was used to characteristics of the flow model. Through the simulation of swirling, influent velocity, dimensions of external basin, hopper depth of bottom cone was determined and through analysis of velocity distribution, flow distribution detailed specifications are derived like as diameter and number of effluent hole. Lab-scale($120{\ell}/hr$) test results, influent of 300~800 NTU to less than 10 NTU without polymer feeding was able to operate in the 20minutes retention time(surface loading rate $37.3m^3/m^2$-day), and through analysis FLUENT the possibility of using design parameters were derived.

A Comparative Study on the Transition of Purlin Coupling Method of Korean and Chinese Ancient Wooden Constructions (한중 목조건축 도리 결합방식 변천(變遷)에 관한 비교연구)

  • Cha, Ju-hwan
    • Korean Journal of Heritage: History & Science
    • /
    • v.47 no.4
    • /
    • pp.22-47
    • /
    • 2014
  • This study was to understand the basic principles of the East Asian wooden structure system research and analysis. The Korea and China ancient architecture internal structure research that the combination of girders and crossbeams position. The ancient wooden structures of eastern Asian countries, Korea and China are not much different from each other in the principles of the wooden architecture structure, combining pillars, purlins and crossbeams. However, it seems that age-division, local-division, national-division differs in detail techniques. China ancient wooden structures combination of purlin and crossbeam, and So-seul Timber(Chinese name: Chashou叉手, Tuojiao 托脚) seems to show differences according to the age of the fulcrum position, detailed approach is also different according to various historical dynasty. Before in the 15th century, Purlin and Crossbeam are coupled to each other, but since the 15th century, seems to have developed a technique combined with each other Girder and Crossbeam and to prevent buckling of the Crossbeam cross-sectional area increased dramatically. For Tuojiao in China Tang-Wudai dynasty(A.D. 618~979), can see that saw the top position Girder and Tuojiao no direct coupling, can be seen as maintaining the safety of the material than the material of the inner wooden structures prevent buckling of the purlin. Korea ancient wooden structures of Goryeo dynasty(A.D. 918~1391), So-seul Timber(Chinese name Tuojiao) why do not to use the fashion? To use Purlin Lower backing material techniques to prevent buckling is a popular trend to stable can be thought of as a preferred way to maintain. I think that with universality beyond the local-division, national-division and the two countries since the 15th century of Korea and China ancient wooden structures detailed mechanism for the purlin buckling. In middle-late Chosen dynasty, The effect of Deotgeolyi- techniques and fleeting beams reduce the purlin buckling that reduces the load transmitted from purlin and crossbeam of how to reduce the load on the roof portion of the architecture fleeting beams used, which of craftsmanship of the Chosen Dynasty building can be referred to as another technique for preventing buckling purlin. This Korea and China ancient architecture purlin beam structure and material So-seul Timber study. Seems to be able to provide a basic research study to restore and designed the old wooden architectures.

Structural Behavior of Slab in the Partial Demolition for the Apartment Remodeling (아파트 리모델링을 위한 부분해체에서 슬래브의 구조적 거동)

  • Choi, Hoon;Joo, Hyung Joong;Kim, Hyo Jin;Yoon, Soon Jong
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.16 no.2
    • /
    • pp.19-30
    • /
    • 2012
  • Due to the fact that the social environment is improved and the urban development is stabilized, the demand of new construction of apartment becomes slowdown. Accordingly, there are many researches to lengthen the service life of the existing apartment through the remodeling and its importance is continuously rising. However, reliable design specifications and guidelines for the design of remodeling with partial demolition are not provided yet in Korea. Specially, in the apartment remodeling, slab collapse accidents take major portion in all accidents that reported by Korean Government. It is very important to prevent intial crack of slab because intial crack could cause severe accident like collapse of all structure in a short period of time. The purpose of this study is to develop structural guidelines that could guarantee the structural safety and serviceability of slab structure and could be adopted in Korean remodeling with partial demolition. There are mainly two components to determine structural behavior of slab structure. One is the shape of slab structure and the other is load which is resisted by the slab structure. In this study, the weight per unit volume of concrete debris and concrete strength are estimated through the analysis of previous researches to recognize the relationship between the shape of slab and load that loaded on the slab. Accordingly, approximately 300 pieces of floor plan are collected and analyzed. The finite element analysis is conducted using these analyzed and estimated results. From the finite element analysis results, the limited stacking height of debris is suggested and the stacking method is also discussed. In addition, to find the relationship between movement of demolition equipment and structural behavior of slab, the static and dynamic loading tests are conducted. From the results of loading tests, the impact factor which will be considered in the remodeling design could be estimated.

Factors Affecting Patient Waiting Times at the Outpatient Pharmacy Department in a Tertiary Care Hospital (3차진료기관 외래약국 투약대기시간에 영향을 주는 요인)

  • Park, Hayoung;Han, Ok-Youn;La, Hyun-Oh
    • Quality Improvement in Health Care
    • /
    • v.1 no.2
    • /
    • pp.60-72
    • /
    • 1994
  • Background: The number of outpatients visiting large university teaching hospitals has increased drastically with the introduction of a nationwide health care insurance in 1989 and the improvement of the socio-economic status of the population. This resulted in long waiting times for services, particularly prescribed drugs, which have been patients' chief complaints. Hospitals have tried to solve the problem with limited success because their approach lacked comprehensive research. The objective of this study is to investigate associations between waiting times and variables defining a total work system. Methods: Data for the outpatient pharmacy department in a tertiary care university teaching hospital located in Seoul was analyzed to achieve the study objective. Associations of pharmacy system variables -- work load, work force, pharmacist work schedule, machine problems, and inventory control -- with mean and 99th percentile of waiting times were examined by the hierarchical stepwise regression method. Day was a unit of the analyses. Results: The regression models explained 65.8% of variance in the mean waiting time and 61.34% in the 99th percentile of waiting times. The break-down of the printer for drug envelops, Automatic Tablet Counters (ATCs), and main computer system lasted longer than 30 minutes increased the mean for 7.7 minutes, 4.5 minutes, and 7.0 minutes, respectively, and the 99th percentile for 14.8 minutes, 9.0 minutes, and 15.7 minutes, respectively. Concerning the work force, study results showed that there were significant differences in the productivity of pharmacists with work experience more than three years, one to three years, and less than one year, and showed that peak time aid work by pharmacists at job assignments other than the outpatient pharmacy, part-time pharmacists, and the installation of ATCs were effective in reducing waiting times, Finally, study findings indicated that the operational policy of work assignment and rotation schedule, supply and inventory of drugs at work tables, and readiness for undisrupted work during the work hours could have a significant effect on waiting times. Conclusion: The study results indicated that efforts to reduce waiting times for prescribed drugs should be geared toward every components of the pharmacy work system ranging from work schedule of pharmacists and supply of dugs at work tables. These findings should provide hospital managers with right directions in battling the problem.

  • PDF