Comparison between Labor Inputs by Quantity per Unit Method and by Actual Data Method in the Apartment Housing Construction Work - Focusing on Masonry Plaster Waterproofing Tile Labors - (공동주택 건설공사의 표준품셈과 실투입 노무량 비교 분석 - 미장, 방수, 조적, 타일공사를 중심으로 -)

  • Jeon, SangHoon;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.1
    • /
    • pp.110-118
    • /
    • 2015
  • The standard production unit system is the most basic element in our country construction. However, this standard production unit system shows a large difference in the actual amount of labor input for works at the Apartment housing construction, Therefore, it may be a reasonable alternative to estimate the cost of construction by historical cost data, works will be calculated the cost of labor must determine the exact amount and It is necessary to determine the exact amount of labor input for the construction progress management. This study examines the results of comparing the standard production unit system and the actual amount of labor counting in apartment housing construction was completed in the metropolitan area since 2000, the following results were obtained. the actual amount of labor input are looked for 1.184person/1000 of masonary, $0.084persons/m^2$ of plaster, $0.039persons/m^2$ of Waterproofing, $0.059persons/m^2$ of tile at the Apartment housing construction. in the actual amount of labor counting Compared with standard production unit system, masonry ratio of 59.8%, plaster ratio of 41.3%, waterproofing ratio of 31.5%, tile ratio of 34.3% and The labor rate in the works was the lowest in the plaster. was relatively high in the masonary. Therefore, the amount of labor country apartment housing construction is preferably calculated on historical cost data. But it seems that the amount of labor necessary complement ongoing close enough to the actual standard production unit system a major variable in construction management.

Conceptual Cost Estimation Model Using by a Parametric Method for High-speed Railroad (매개변수기법을 이용한 고속철도 노반공사의 개략공사비 예측모델)

  • Lee, Young Joo;Jang, Seong Yong
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.4D
    • /
    • pp.595-601
    • /
    • 2011
  • There is currently applied to the unit cost per a distance (KRW/km) for estimating the conceptual cost of civil work on basic planning stage of high speed railroad. This unit cost is an arithmetic average value based on historical data, which could be in big error. It also is difficult to explain the deficiency comparing the estimated cost derived from next basic design stage. This study provides the conceptual estimation model using by the parametric method and regression analysis. Independent variables are the distance and the geological materials (earth, weathered rock, soft-rock, hard-rock), extracting from the actual data to 36 contracts. The deviation between the unit costs estimated using the developed model and the actual cost data is presented in the range from -0.4% to +31%. This range is acceptable compared the typical range "-30% to + 50%". This model will improve the accuracy of existing method and be expected to contribute to effective total cost management and the economic aspects, reduce the financial expenditure.

Development of Construction Cost Model through the Analysis of Critical Work Items (코스트 중요항목 분석을 통한 공사비 예측모델 연구)

  • Lee Yoo-Seob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.212-219
    • /
    • 2003
  • In construction project planning and control, a cost model performs a critical role such as cost determination on a contract stage and cost tracing. The model can maximize owner's profit and value within the project budget and optimize cost management works on overall construction implementation stages. A BoQ(Bill of Quantities) generally adopted in a unit price contract has been applied as an important tool for cost control and forecast. However a previous cost model based on the BoQ has shown limitations in that it requires too detailed information and heavy manpower on cost management and difficulty in keeping relationship with construction planning, scheduling and progress management. The each cost items and unit prices which constitute of construction works are individually very important management factors but the relative weight for each items and prices have a difference on the contents and conditions of each conditions of each construction works. In consideration of this structural mechanism of cost determination, this research is aimed at examining the critical factors affecting the construction cost determination and propose and verify a new cost forecasting model which is more simple and efficient and also keeps the accuracy of cost management.

An Empirical Study on the Cost Behavior in Coastal Fishery (연안어선어업 피해율 산정을 위한 원가행태에 관한 실증연구)

  • Kim, Woo-Soo;Kim, Kil-Yong
    • The Journal of Fisheries Business Administration
    • /
    • v.42 no.3
    • /
    • pp.1-13
    • /
    • 2011
  • It is necessary to set up a standard of estimation for annual unit price of sale and cost, damage rate for calculating compensation against fishery damage objectively. Two items on the unit price and cost have regulations but the damage rate has not, so it may occurred some problems such as reasonability and balance because the estimation should be handling by an appraiser's knowledge and experience. This study has analyzed using Regression model and searched variable costs and fixed costs about each items appraisers to operate in the present. It is compare profit damage index is calculated by an estimated model and an appraised example. This analysis showed highly 23-30% estimated model more than appraised example. It means the overestimation for fishery damage. This difference has caused by limited data, lack of sample, much difference in the standard deviation, and has not classified each kind of business and weight of coastal fishery, the overestimation more than what expected. This study has analyzed that the applied rate of fixed and variable cost in relation to the compensation in the cost of coastal fishery is very valuable.

Cost benefit analysis of introducing domestic food waste disposers on waste and sewage management systems (가정 내 주방용 디스포저 도입에 따른 사회적 비용편익 분석)

  • Ahn, Jong-Ho
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.26 no.4
    • /
    • pp.513-520
    • /
    • 2012
  • The use of food waste disposers (FWDs) can be an emerging option to manage organic food wastes in municipal sewage system. The cost-benefit analysis (CBA) of introducing domestic FDWs is conducted to access the allowable disposer market price and the economic impact on food waste management from conventional solid waste management system. If the convenience value of 10,000 won/month is taken into consideration based on survey results, the introduction of FDWs can lead to net economic benefits, allowing the capital cost of disposer up to 1,000,000 won/unit. Without the consideration of convenience value, the introduction of FWDs becomes profitable if the capital cost of disposer is less than 50,000 won/unit. In case that the value of convenience is more than 7,000 won/month, the reduction of food waste management cost is not valid for the introduction of FWDs to be non-profitable. However, if environmental externalities are considered, the proposed system could become breakeven with the cost of food waste management decreases by 54 % (60,000 won per ton).

TECHNICAL PROPOSAL BASED COST REDUCTION BIDDING SYSTEM FOR SUPPLYING AFFODABLE HOUSING

  • Seunghee Kang;Jeongseok Lee;Gunhee Cho;Jeongrak Sohn;Jongdae Bang
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1433-1439
    • /
    • 2009
  • Best value is the ultimate goal of the owner and can thus have diverse meanings according to the project characteristic, owner's purpose, user groups' payment capability, etc.. Recently, resettlement problems of the marginalized members in the urban regeneration area have been issued in Korea because they have no capability to purchase (or lease) redeveloped housing (or apartment). It means that a minimized production cost for reducing supply price of housing is a key factor in establishing the best value of the marginalized members. The lowest-price bidding system serves the purpose of ensuring a minimized production cost, but due to the low-cost investments, it creates various problems, such as sloppy construction, lowered quality, an increased LCC, and worsening profitability for builders. Thus, to help them resettle, it is necessary to supply affordable housing geared towards a certain appropriate quality and minimum construction costs. Towards this end, this study aimed to propose a cost reduction bidding system based on a technical proposal. The proposed technical-proposal-based cost reduction bidding system consists of the following components: work-unit-based, project-unit-based, and construction-period-reducing technical proposals. These components are evaluated to select the best bidder for a given project. The technical proposal based cost reduction bidding system proposed herein is expected to provide facilities with appropriate supply prices and appropriate quality levels, to bolster the technological competitiveness of builders.

  • PDF

DEVELOPMENT OF A WEB-BASED COST AND DURATION MANAGEMENT SYSTEM FOR MEGA-PROJECTS

  • Chang-Taek Hyun;Run-Zhi Jin;Myoung-Jin Son;Seung-Yoon Shin
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.510-515
    • /
    • 2011
  • Urban renewal projects, in the form of mega-projects, are being actively implemented both nationally and internationally to revitalize inactive cities. These programs, however, are difficult to manage efficiently due to their need for a large budget over a long period of time and due to conflicts with stockholders. Moreover, existing cost and duration management systems are structured with emphasis on the design and construction stage of unit projects, thus limiting their application to long-term mega-projects that are integrated with various facilities. To solve these problems, this study developed a web-based system that can collectively manage the cost and duration of mega-projects at a program level. The unit modules included in the system--CBS organization, construction cost and duration prediction, and total cost and duration prediction--can support decision-making at the early stage of the program. Furthermore, the modules, which include contract management, execution management, change management, and program progress management, support the program operations for its successful accomplishment. The web-based cost and duration management system developed in this study is expected to be used as a valuable tool that supports the successful accomplishment of mega-projects through their efficient management throughout their life cycle.

  • PDF

Redeveloped Work Criteria and Cost Unit in Grassland Establishment (초지조성방법에 따른 작업항목의 재설정 및 초지조성단가 추정)

  • Yoon, Byung Ku;Kim, Ji Yung;Kim, Byong Wan;Sung, Kyung Il
    • Journal of The Korean Society of Grassland and Forage Science
    • /
    • v.42 no.1
    • /
    • pp.32-40
    • /
    • 2022
  • In this study, the appropriate unit cost in grassland establishment was redeveloped by the grassland establishment method and work criteria. The grassland establishment method was divided into tillage establishment (all logging) and no-tillage establishment (all logging and partial logging). The price for the work criteria by the establishment method was presented for each permission/authorization and establishment work. In permission/authorization for grassland establishment, the cost of each work criteria was of environmental impact (small scale environmental impact) assessment, disaster impact assessment, cadastral serving fee, forest survey, and connection fee for control of mountainous districts. In establishment was of logging, cleaning/gruffing, plowing/soil preparation, seeding, fertilization, livestock manure compost, seed, herbicide, labor cost (fertilizer, seed and herbicide), soil consolidation, cattle trail, and fence. The unit cost of grassland establishment was KRW 115,894,212 for the tillage establishment, and KRW 110,281,572 and KRW 106,680,122 for the all and partial logging of the no-tillage establishment, respectively. The current study redeveloped the establishment method, work criteria, and estimation of the unit cost of grassland establishment. It can be usefully used to carry out government projects to support related to establishment and maintenance of grassland.

Improved Performance Through Air Conditioner Outdoor Fan Airflow Increase and Relative Cost Reduction (에어컨 실외기 풍량증가를 통한 성능 향상 및 상대적 원가절감)

  • Kim, Jae-Yeol;Choi, Seung-Hyun;Kim, Sung-Hyun;Ki, Suk-Ho;Yoon, Sung-Un
    • Journal of the Korean Society of Manufacturing Technology Engineers
    • /
    • v.21 no.4
    • /
    • pp.570-574
    • /
    • 2012
  • Spread of household air conditioning system is continued to be increased. Axial fan in the external unit of air conditioning system is for ventilation and air supplying unit, and the related products have been widely adopted as household electronics, automobile engine, big sized blower in factory, tunnel, and subway. In this study, commercial 3-winged propeller fan is modified to shape and modified to 2-winged fan for the airflow increase and cost reduction. Using 3D modelling, the fan shape is modified, and analysis flow is adopted to provide the way to airflow increase and reduce cost while maintaining the same wind capacity.

Efficient Operation Policy in a Closed-loop Tire Manufacturing System with EPR

  • Ko, Young-Dae;Hwang, Hark
    • Industrial Engineering and Management Systems
    • /
    • v.8 no.3
    • /
    • pp.162-170
    • /
    • 2009
  • This paper deals with a closed-loop remanufacturing system with one manufacturer and one remanufacturer. The manufacturer sells new products bearing the 'Extended Producer Responsibility (EPR).' It is assumed that the manufacturer's collection rate of used products depends only on the buy-back cost, while that of the remanufacturer depends on the minimum allowed quality level of used products in addition to the buy-back cost. Through the development of mathematical models with the objective function of maximizing profit, we study an efficient operation policy of each party. The decision variables are the unit selling price of new products and remanufactured products, the unit buy-back cost of the used products of the manufacturer and remanufacturer, and the minimum allowed quality level. The validity of the model is examined through numerical examples and sensitivity analysis.