• Title/Summary/Keyword: Unit Cost.

Search Result 2,130, Processing Time 0.035 seconds

The Feasibility Analysis of 9.9 MW Biomass Cogeneration System (9.9MW급 바이오매스 열병합발전 타당성 연구)

  • Choi, Jaiyoung;Shul, Yonggun
    • New & Renewable Energy
    • /
    • v.10 no.2
    • /
    • pp.40-47
    • /
    • 2014
  • This study is intended to analyze the appropriate scope for 9.9MW biomass cogeneration, feasibility and sensitivity according to changing market situation. In the study, the heat load is classified into three types to predict heat sales and find out the appropriate scope of thermal business that is operated in CHP 34.42 Gcal/h, PLBwg 70 Gcal/h of cogeneration. the feasibility is estimated based on internal rate of return (IRR) and net present value(NPV). the sensitivity is analyzed in terms of biomass fuel cost, unit price of heating cost, investment cost, SMP unit price and REC unit price.

A Maintenance Policy Determination of Dependent k-out-of-n:G System with Setup Cost (초기설치비를 고려한 의존적 k-out-of-n:G 시스템의 보전정책 결정)

  • 조성훈;안동규;성혁제;신현재
    • Journal of the Korean Society of Safety
    • /
    • v.14 no.2
    • /
    • pp.155-162
    • /
    • 1999
  • reliability from components reliability. In this case, it assumes that components failure is mutually independent, but it may not true in real systems. In this study, the mean cost per unit time is computed as the ratio of mean life to the mean cost. The mean life is obtained by the reliability function under power rule model. The mean cost is obtained by the mathematical model based on the inspection interval. A heuristic method is proposed to determine the optimal number of redundant units and the optimal inspection interval to minimize the mean cost per unit time. The assumptions of this study are as following : First, in the load-sharing k-out-of-n:G system, total loads are applied to the system and shared by the operating components. Secondly, the number of failed components affects the failure rate of surviving components as a function of the total load applied. Finally, the relation between the load and the failure rate of surviving components is set by the power rule model. For the practical application of the above methods, numerical examples are presented.

  • PDF

Optimum Design of Waste Heat Boiler with Water Tube and Three Drum (3드럼 수관식 폐열보일러의 최적설계)

  • Lee, Kwan-Jong;Han, Jin-Ho
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.18 no.12
    • /
    • pp.992-998
    • /
    • 2006
  • This study is to optimize design parameters for waste heat recovery boiler with water tube and three drum. The design optimization considered here is to find the most economic dimension of the boiler considered which results in a minimum cost in producing a unit amount of steam per given period of operation. For this purpose, optimize design have to determine what are the main parameters of affecting the total cost of producing a unit amount of steam which is comprised of manufacturing cost of the boiler, operating cost of the fan etc.

Forecasting and Prolonging Method of Optimum Economic Life for Office Buildings using Life Cycle Cost (LCC분석에 의한 오피스건축물의 최적경제수명추정분석 및 장수명화에 관한 연구)

  • Yang Bong-Seog;Jeong Hee-Cheol;Kim Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.4 s.8
    • /
    • pp.135-143
    • /
    • 2001
  • The purpose of this study is to estimate and analyze the optimum economic life of office buildings in consideration of their LCC (Life Cycle Cost), and thereby, explore the ways to manage the outlived office buildings economically. In estimating the economic life, initial investment cost and maintenance cost are taken into due consideration. For this study, those office buildings in Yeouido and Mapo region were sampled. The surveyed details were reduced to unit area to calculate a unit value, and then, their optimum economic life was estimated using LCC. Five alternatives for management of outlived office buildings were compared in terms of reconstruction or rehabilitation cost.

  • PDF

Power Cost Analysis of Go-ri Nuclear Power Plant Units 1 and 2

  • Chung, Chang-Hyun;Kim, Chang-Hyo;Kim, Jin-Soo
    • Nuclear Engineering and Technology
    • /
    • v.8 no.2
    • /
    • pp.101-116
    • /
    • 1976
  • An attempt is made to analyze the unit nuclear power cost of the Go-ri units 1 and 2 in terms of a set of model data. For the calculational purpose, the power cost is first decomposed into the cost components related to the plant capital, operation and maintenance, working capital requirements, and fuel cycle operation. Then, POWERCO-50 computer code is applied to enumerate the first three components and MITCOST-II is used to evaluate the fuel cycle cost component. The specific numerical results are the fuel cycle cost of Go-ri unit 2 for three alternative fuel cycles presumed, levelized unit power cost of units 1 and 2, and the sensitivity of the power cost to the fluctuation of the model data. Upon comparision of the results with the power cost of the fossil power plants in Korea, it is found that the nuclear power is economically preferred to the fossil power. Nevertheless, the turnkey contract value of Go-ri unit 2 appears to be rather expensive compared with the available data on the construction cost of the PWR plants. Therefore, it is suggested that, in order to make the nuclear power plants more attractive in Korea, the unfavorable contract of such kind must be avoided in the future introduction of the nuclear power plant. Capacity factor is of prime importance to achieving the economic generation of the nuclear electricity from the Go-ri plant. Therefore, it is concluded that more efforts should be directed to make the maximum use of the Go-ri plant.

  • PDF

Study on Logistics Cost Accounting in University Libraries (대학도서관의 물류비 산정에 관한 연구)

  • Ham Sung-Hun
    • Journal of Korean Library and Information Science Society
    • /
    • v.30 no.2
    • /
    • pp.77-92
    • /
    • 1999
  • This study introduces a new method for Logistics Cost Accounting in University Libraries. Logistics Cost is the cost that arises in the course of physical distribution and causes a serious in crease in the unit cost of a product. Therefore, Logistics Cost Accounting has been used in manufacturing industries to reduce the unit costs of products. There is a definite similarity between the operations of a business and a library. The operations of a business consist of purchasing, production, selling, which is similar to that of a library, where they are called acquisitions, cataloging, physical preparations and circulation. So Logistics Cost Accounting may be applied to a library. With this in mind, we made a model for Logistics Cost Accounting' in University Libraries. Therefore, it can be applied to many university libraries because it is a general model.

  • PDF

Development and Application of Unit Table Form using Euro Form for High-rise Building Construction (초고층 건축공사를 위한 유로-유닛 테이블폼 공법 개발 및 적용에 관한 연구)

  • Yang, Sung-Woo;Cho, Hun-Hee;Kang, Kyung-In
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.2
    • /
    • pp.45-52
    • /
    • 2008
  • In today's construction, there has been an increase in the construction of high-rise buildings due to the need to maximize land usage. Framework affects not only the entire construction duration and cost, but also subsequency construction activities such as electrical, mechanical, and finishing works. Especially, proper formwork is a influential factor of productivity in the framwork of reinforced concrete construction. To that reason, a table form of system form is more frequently used than conventional form. However, an initial cost of the table form is high and a reused table form needs for workers to repair damaged table forms. Therefore, the goal of this study is to introduce euro-unit table form. The results from the application of euro-unit table form to high-rise residentia building construction are as follows : (1) The cost of producing table form reduced by 16%, and (2) The time of producing table form was slumped by 35%, and (3) The labor force needed for form work declined 21%.

Potential Role of Electrochemotherapy as Anticancer Treatment for Cutaneous and Subcutaneous Lesions

  • Zygogianni, Anna;Kyrgias, George;Scarlatos, John;Koukourakis, Michael;Souliotis, Kyriakos;Kouvaris, John;Kelekis, Nikolaos;Kouloulias, Vassilis
    • Asian Pacific Journal of Cancer Prevention
    • /
    • v.17 no.8
    • /
    • pp.3753-3757
    • /
    • 2016
  • Background: The aim of this study was to investigate whether electrochemotherapy is a clinically and cost-effective treatment option against skin tumors. Materials and Methods: We performed an analysis of the current literature based on database searches in PubMed/MEDLINE and we included articles till July 2012. Terms used for the search were 'electrochemotherapy', 'skin cancer', 'recurrence', and 'cutaneous and subcutaneous tumors'. Only papers published in English were included. In addition, we performed an analysis of the cost effectiveness of the method. Results: The combination of physics and chemistry is the foundation for electrochemotherapy and its efficacy, independent of the tumor histology. Clinical data showed that ECT is well tolerated and can be used in difficult cases without other available treatment options. The analysis also showed that the treatment is feasible and cost-effective. Conclusions: Electrochemotherapy is a clinically efficient safe and cost-effective treatment and clinicians should not hesitate to use it as alternative therapeutic modality or as palliative treatment.

Analysis of the Economic Efficiency of the District Heating and Gas Engine Co-Generation System Compared with the Central Heating System (중앙난방방식을 지역난방과 소형열병합난방 방식으로 전환 시 경제성 비교 분석)

  • Kim, Kyu Saeng
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.27 no.10
    • /
    • pp.544-551
    • /
    • 2015
  • This study was conducted to determine the LCC of apartment complexes with district heating and a cogeneration system. For the purpose of analyzing LCC according to the size of the apartment complex, 500, 1,500, and 4,000-unit model apartments were selected. Analysis was performed on the design of the heating system and the life cycle cost including total construction cost, maintenance and operation cost for the duration of the project period (15 years). According to the calculated results, 1) The initial cost of the cogeneration system for 500, 1,500, and 4,000-unit apartments is higher than that of the district heating system by 20%, 13%, and 12%, respectively. 2) In the case of the cogeneration system, the payback period by electric generation was found to be 5.21, 4.92 and 4.47 years, and saving cost was calculated to be 29 billion won, 94 billion won and 262 billion won after the payback period for 500, 1,500, and 4,000-unit apartments, respectively. 3) The LCC values of the cogeneration system were 1.12, 1.07 and 1.06 times larger than those of the district system according to the size of the apartment complex. In this study, the district heating system was found to be more efficient than the cogeneration system in terms of LCC reduction. 4) District heating is affected by fuel bills, so energy efficiency should be improved through recovering waste heat (incineration heat, etc.). Also, district cooling should be provided according to heat use to keep the temperature high in winter and low in summer.

Two PM policies following the expiration of free-repair warranty (무료수리보증이 종료된 이후의 두 예방보전정책)

  • Jung, Ki-Mun
    • Journal of the Korean Data and Information Science Society
    • /
    • v.20 no.6
    • /
    • pp.999-1007
    • /
    • 2009
  • This paper considers the optimal periodic preventive maintenance (PM) policy following the expiration of free-repair warranty. We assume that two periodic PM models with random maintenance quality which were proposed by Wu and Clements-Croome (2005) and Jung (2006b), respectively. Given the cost structure to the user during the cycle of the product, we derive the expressions for the expected cost rate per unit time. Also, we obtain the optimal PM number and the optimal PM period by minimizing the expected cost rate per unit time. The numerical examples are presented for illustrative purpose.

  • PDF