• Title/Summary/Keyword: Underwater Connector

Search Result 2, Processing Time 0.014 seconds

Optimum Design of Underwater Connector Hole Arrangement for Deep-sea Pressure Vessel Cover Plate (심해 압력용기 덮개판의 수중 커넥터홀 배치 최적설계)

  • Lee, Minuk;Park, Soung-Jea;Yeu, Tae-Kyeong;Ki, Hyong-Woo;Hong, Sup;Cho, Su-Gil;Jang, Jun-Yong;Lee, Tae Hee;Choi, Jong-Su
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.36 no.12
    • /
    • pp.1627-1633
    • /
    • 2012
  • A deep-sea pressure vessel needs to protect the internal electrical equipment from the high external pressure. Thus, the pressure vessel should be designed to be watertight and structurally safe. In this study, a cylindrical-type pressure vessel comprising a hollow cylinder and cover plates at both ends is investigated. For communication between the internal electronic equipment and the external device, holes are bored on the cover plate to install underwater connectors. Considering the type of internal equipment and underwater connector specifications, multiple holes may be required. These holes can affect the structural safety of the pressure vessel cover plate. In this study, the optimum design of the hole arrangement in consideration of the structural safety of the cover plate was performed.

Lug Arrangement and Dynamic Analysis of Lifting Simulation for Underwater Installation of Structure in Asymmetric Position (비대칭 위치의 수중 구조물 설치를 위한 러그 위치 산정 및 리프팅 동역학 해석)

  • Jo, A-Ra;Park, Kwang-Phil;Lee, Hyun-Jin
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.52 no.4
    • /
    • pp.283-289
    • /
    • 2015
  • RGT(Riser Guide Tube) is a part of mooring on the bottom of a turret system to be connected with a production riser, and DBSC(Diverless Bend Stiffener Connector) is a latching component between them. In this paper, appropriate lug arrangement is decided mathematically for the case that a DBSC is lifted and installed on a RGT under the water while FPSO is under construction. Considering asymmetric arrangement & position of RGT and initial lug position, additional lug positions are determined by using an optimization method. The modified installation scheme with new lug points is investigated with a lifting simulation system, SIMSON. The simulation result shows that the installation of DBSC on RGT under the given conditions is quite feasible; therefore the mathematical method is proven to be appropriate.