• 제목/요약/키워드: Underground Transmission Cables

검색결과 109건 처리시간 0.035초

154kV XLPE 600㎟ 지중관로 수평배열 형태별 허용전류용량 산정에 관한 연구 (A Study on the Calculation of Transmission Current-Carrying Capacity by Horizontal Arrangement Type in the Installation Methods of 154kV XLPE 600㎟ Power Cable Buried Ducts in Ground)

  • 김세동;유상봉
    • 조명전기설비학회논문지
    • /
    • 제30권3호
    • /
    • pp.53-58
    • /
    • 2016
  • The underground transmission lines which have been built to expand the suppling facilities will be continuously accompanying with high growth of the increase of power demand in the metropolitan area in recent years. So, it is necessary to maximize the ability and reliability of power supply with the current-carrying capability of the underground transmission lines. Design criteria of KEPCO is to be presented and used frequently. But it has to be studied about the installation methods of power cable buried in ground. In this study, we used the program for calculating the current-carrying capability of underground transmission power cables. We estimated the maximum permissible current values by the horizontal arrangement in the installation methods of power cable(154kV XLPE $600mm^2$) buried ducts in ground. To see the general tendency of the analysis, we researched a statistical analysis with such parameters as the maximum permissible current values. Through the regression analysis, we analyze the most highly values of the maximum permissible current on the Ra type duct arrangement.

지중 송전 케이블의 편단접지 시스템에서의 계통 보호 방안 (Application of Protecting Methods for Single Point Bonding on Underground Transmission Cable)

  • 하체웅;김정년;이인호;김종철;이광열
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 제36회 하계학술대회 논문집 A
    • /
    • pp.15-17
    • /
    • 2005
  • The protection of underground cables against transient overvoltages resulting from lightning and other causes is important in cable-line which is connected with overhead line and underground cable. This paper investigates the failure of SVL(Sheath Voltage Limiter) and presents the application of protection methods for single point bonding on underground transmission cable system. EMTP(Electromagnetic Transient Program) is used in order to study the overvoltages and modeling of components of the system such as, underground cables, SVLs and towers.

  • PDF

Review of the Conceptual Design for the Use of HTS Power Transmission Cable for a Metropolitan Area

  • Park, Sang-Bong
    • KIEE International Transactions on Power Engineering
    • /
    • 제3A권2호
    • /
    • pp.63-69
    • /
    • 2003
  • The necessity of compact high temperature superconducting cables is more keenly felt in densely populated metropolitan areas. Because the compact high-temperature superconducting cables can be installed in ducts and tunnels, thereby reducing construction costs and making the use of underground space more effective, the effect of introducing it to the power system will be huge. Seoul, Korea, is selected as a review model for this paper. The loads are estimated by scenario based on a survey and analysis of 345kV and 154kV power supply networks in this area. Based on this, the following elements for an urban transmission system are examined. (1) A method of constructing a model system to introduce high-temperature superconducting cables to metropolitan areas is presented. (2) A case study is conducted through the analysis of power demand scenarios, and the amount of high-temperature superconducting cable to be introduced by scenario is examined. (3) The economy involved in expanding existing cables and introducing high-temperature superconducting cables(ducts or tunnels) following load increase in urban areas is examined and compared., and standards for current cable ducts are calculated. (4) The voltage level that can be accommodated by existing ducts is examined.

초고압 지중케이블 장기신뢰성 실증시험장 구축 (Test-Field Construction for Long-term Reliability of EHV Underground Transmission Cable)

  • 김진;강지원;장태인;양병모;박준우;박흥석;윤형희
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2009년도 제40회 하계학술대회
    • /
    • pp.383_384
    • /
    • 2009
  • After the 1970s, the importance of underground transmission systems increased and the construction rate of underground transmission lines also showed increasing trends each year, especially in metropolitan areas. Accordingly the social ripple effects are very large and wide when the fault occurs in underground power system, and the amount of time and money spent to restore the system also increases. So we must ensure stable operation and long-term reliability of the facilities. In Korea's case, long-term reliability tests for EHV power cables and accessories progressed poorly because equipment was not compatible for long-term reliability tests. Therefore we planned to construct a long-term reliability test field for EHV underground cables in order to ensure international quality reliability and optimal power cable operation techniques. The Gochang Underground Cable Test Field is under construction, funded by the Korean government, the govenment's union investment department, KEPCO, KERI and three private cable corporations. This project began in March, 2005 and will be completed by February, 2010. It is designed to promote joint research by incorporating several types of test equipment, construction of operating facilities, and being an internationally certified authority.

  • PDF

A Study on Lightning Overvoltage Characteristics of Grounding Systems in Underground Distribution Power Cables

  • Jung, Chae-Kyun;Jung, Yeon-Ha;Kang, Ji-Won
    • Journal of Electrical Engineering and Technology
    • /
    • 제9권2호
    • /
    • pp.628-634
    • /
    • 2014
  • This paper investigates the transient characteristics of grounding systems used in under-ground distribution power cables. Recently, two kinds of grounding system are used for underground distribution cables in Korea. The first one is conventional multi-point grounding system, the other is newly proposed non-bundled common grounding system. The non-bundled common grounding system has an advantage the decreasing the power loss due to decrease of the shield circulation current. In this paper, the lightning overvoltage induced in neutral wire (in case of non-bundled common grounding system, overvoltage between opened neural wires and grounding in each phase) of these two kinds of grounding systems are estimated and compared by field tests and EMTP simulations. The EMTP simulation methods are firstly verified by comparison of measurement and simulation. Finally, the insulation level against lightning is expected by EMTP simulation results using verified model.

275kV XLPE절연 전력케이블의 해외프로젝트 적용 (Application of 275kV XLPE Power Cables for Overseas Protect)

  • 권병일;성정규;한창석
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2002년도 하계학술대회 논문집 C
    • /
    • pp.1736-1738
    • /
    • 2002
  • Oil-filled power cables and XLPE power cables have been globally applied for extra-high-voltage underground power transmission lines. The application of XLPE cables for the transmission lines have been largely increased at the domestic and overseas projects because of some issues. O.F cables have some week points, related with the issues of the environmental pollution and the needed maintenance work, even though they have been applied for several ten years and their reliability has been proven. Meanwhile, the demands on XLPE power cables increase as their manufacturing technologies have been improved and their simplicity of installations has been focused on. In Korea, for the first time, the 275kV XLPE cable is to be applied at an overseas power plant project. This paper introduces the project profile, the design of the XLPE cable and its accessories, the cable system design and the installation design.

  • PDF

국내 지중송전선로 포설형태와 시스순환전류와의 상관관계 검토 (A Study on the Correlation between Sheath Circulating Current and Installation Type of Domestic Underground Transmission Power Cables)

  • 김남열;정채균;이종범;윤양웅;강지원
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2002년도 하계학술대회 논문집 A
    • /
    • pp.484-486
    • /
    • 2002
  • In this paper, installation type is analyzed into a single and mixed burying type on burying situation of domestic underground transmission cables, and problem of underground cable is discussed with investigating the relation between burying type and sheath circulation current. Investigated cable systems are 520 T/L which have 512T/L for 154kV and 8T/L for 345kV. The authors consider that the analysis of sheath circulating current with burying type will contribute for setting reduction methods of sheath circulation current.

  • PDF

뉴로-퍼지를 이용한 혼합송전선로에서의 1선지락 고장시 고장점 추정 (Fault Location Using Neuro-Fuzzy for the Line-to-Ground Fault in Combined Transmission Lines with Underground Power Cables)

  • 김경호;이종범;정영호
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제52권10호
    • /
    • pp.602-609
    • /
    • 2003
  • This paper describes the fault location calculation using neuro-fuzzy systems in combined transmission lines with underground power cables. Neuro-fuzzy systems used in this paper are composed of two parts for fault section and fault location. First, neuro-fuzzy system discriminates the fault section between overhead and underground with normalized detail coefficient obtained by wavelet transform. Normalized detail coefficients of voltage and current in half cycle information are used for the inputs of neuro-fuzzy system. As the result of neuro-fuzzy system for fault section, impedance of selected fault section is calculated and it is used as the inputs of the neuro-fuzzy systems for fault location. Neuro-fuzzy systems for fault location also consist of two parts. One calculates the fault location of overhead, and the other does for underground. Fault section is completely classified and neuro-fuzzy system for fault location calculates the distance from the relaying point. Neuro-fuzzy systems proposed in this paper shows the excellent results of fault section and fault location.

지중송전케이블계통에서 절연통의 과전압 해석 및 억제대책 검토 (Analysis of Overvoltage and Reduction Methods of Insulation Joint Box in Underground Power Cable Systems)

  • 홍동석;정채균;이종범;서재호;조한구
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제51권2호
    • /
    • pp.102-108
    • /
    • 2002
  • This paper describes the overvoltage analysis and reduction methods of insulation joint boxes in underground transmission power cables when direct lightning surge strikes to overhead transmission line. An actual 154kV combined transmission line with underground Power cables was modelled in ATPDraw for simulation. Simulations were performed to analyze the overvoltage between insulation joint boxes, sheath-to-ground voltage according to the distance between cable conductors, cable lengths, burying types, CCPU connection types. The most effective method to reduce the induced overvoltage of Insulation joint boxes was proposed. It is evaluated that the proposed reduction method riven from the detailed simulations can be effectively applied to the actual underground power cable systems.

불평형 요소 변화에 따른 지중 송전선로의 시스순환전류 분석 (Analysis of Sheath Circulating Current in Underground Transmission Power Cables according to Unbalanced Factor)

  • 최수현;김규호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2015년도 제46회 하계학술대회
    • /
    • pp.294-295
    • /
    • 2015
  • Many unbalanced factors of underground transmission power cable, such as burying types and the length difference of the cable between each minor section, etc will cause the impedance unbalance and excessive circulating current between cables. So this paper presents the analysis of sheath circulating current in accordance with the distance between the center conductors and phase arrangement. ground resistance value changes on 154kV transmission system. Based on these simulation results, this paper will contribute to the reduction method of sheath circulation current.

  • PDF