• Title/Summary/Keyword: Unbalanced Assignment

Search Result 12, Processing Time 0.018 seconds

Two-Phase Shallow Semantic Parsing based on Partial Syntactic Parsing (부분 구문 분석 결과에 기반한 두 단계 부분 의미 분석 시스템)

  • Park, Kyung-Mi;Mun, Young-Song
    • The KIPS Transactions:PartB
    • /
    • v.17B no.1
    • /
    • pp.85-92
    • /
    • 2010
  • A shallow semantic parsing system analyzes the relationship that a syntactic constituent of the sentence has with a predicate. It identifies semantic arguments representing agent, patient, instrument, etc. of the predicate. In this study, we propose a two-phase shallow semantic parsing model which consists of the identification phase and the classification phase. We first find the boundary of semantic arguments from partial syntactic parsing results, and then assign appropriate semantic roles to the identified semantic arguments. By taking the sequential two-phase approach, we can alleviate the unbalanced class distribution problem, and select the features appropriate for each task. Experiments show the relative contribution of each phase on the test data.

A Fundamental Study on Village Planning in the Reclaimed Area -A Case Study of Farming Villages in Deuk Ryang Reclaimed Area- (간척지 농촌취락계획을 위한 기초연구 -전남 보성군 득량간척지 농촌취락의 사례연구-)

  • 최수영;이원철;한경수;황한철
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.35 no.2
    • /
    • pp.33-42
    • /
    • 1993
  • In order to obtain the basic information for the optimal settlement planning in the reclaimed area, various existing settlement conditions on reclaimed farming village were analysed through a case study of in-and-round farming villages in Deuk Ryang Reclaimed Area. By comparison study between in-and-around villages, the allocation policy of farming settlement in the samll and medium scale area was proposed. The results obtained in this study were as follows ; 1.The population structure of the inner village(Ansim village) had become worse than the around village during 1976~1981 period from the viewpoint of total and female emigration ratios. Especially, the originally unbalanced sex ratio of Ansim village had worsen to the unacceptable ratio of 1.5 : 1(male : female). Therefore, the structural stability of the population should be carefully improved in the newly reclaimed farming villages by the systematic long-term controlling machanism.2.The farming status of Ansim village was much lower than the around villages viewing of the cultivated acreage and agricultural machinery stock Therefore, the continuous and intensive governmental support different from the existing farming area should be required for the settling of reclaimed farming. 3. The regularity of the village site as a planned village, though pursed in the first phase of village construction, had been severely disturbed inflowing of squatters. Recently, there are increasing vaccant houses in the village, and the level of living amenities and personal mobility of Ansim village are much lower than the around village. So, now, the physical structure of the village should be improved to the level of village reconstruction or new village construction. 4. The cultivated area of Ansim village leans to the south side which would be unfavoured by the farmers of the around villages, while its distributing pattern should be concentric around the village site. This phenomenon disturbs the central fuction of the planned farming village. In this respect, role assignment, relationship and balance of competence in farming activities should be planned between in-and-around villages in the reclaimed area from the initial stage. 5. Putting together the above results in this study, the farming and living conditions of Ansim village threaten its existence as a planned new farming village in the reclaimed area. And, so, the full scale reconstruction of village structure, including moving to the new site, should be designed as soon as possible. Although further many studies should be carried out, it would be sure that the new village planning should be reconsidered in the small and-medium scale reclamation works.

  • PDF