• Title/Summary/Keyword: Two-lane highway

Search Result 94, Processing Time 0.021 seconds

Microscopic Study on the Warrants for TWLTL Based on the DHV - Focusing on the Section with Overlapping Left-turn Movements - (설계시간 교통량 기반 양방향 좌회전차로의 설치기준에 관한 미시적 연구 - 좌회전 상충이 발생하는 구간을 중심으로 -)

  • Lee, Ji-Sun;Shin, Chi-Hyun
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.13 no.5
    • /
    • pp.1-10
    • /
    • 2014
  • This research focuses on the warrants for the Two-Way Left-Turn Lanes (TWLTL). Using a microscopic traffic simulation tool, two key parameters were investigated herewith. One is a wide range of the Design Hourly Volume (DHV), reflective of recent Korean roadway volume characteristics, that is conventionally reduced from the Average Daily Traffic (ADT). The other is driveway spacing, the length of the middle-lane section where two conflicting left-turn demands often compete for space. In addition, unlike previous researches, the way and the procedure the TWLTL operation is realized in the VISSIM S/W with its add-on application such as VISVAP is clearly stated and described in detail. According to the result of simulations for 10 volume scenarios, as expected, the higher the volume level is, the more delay the left-tuner experience. The Level Of Service (LOS) for most cases was in the range of C and D based on the non-signalized intersection LOS criteria. Furthermore, the TWLTL was found operable up to the volume level of 1,116 and 1,860 vph in heavy direction (equivalent of volume level 7) for 3-lane and 5-lane facility respectively, which covers significant portion of existing two to four-lane highway volumes in Korea.

An Algorithm for Traffic Information by Vehicle Tracking from CCTV Camera Images on the Highway (고속도로 CCTV카메라 영상에서 차량 추적에 의한 교통정보 수집 알고리즘)

  • Min Joon-Young
    • Journal of Digital Contents Society
    • /
    • v.3 no.1
    • /
    • pp.1-9
    • /
    • 2002
  • This paper is proposed to algorithm for measuring traffic information automatically, for example, volume count, speed and occupancy rate, from CCTV camera images installed on highway, add to function of image detectors which can be collected the traffic information. Recently the method of traffic informations are counted in lane one by one, but this manner is occurred critical errors by occlusion frequently in case of passing larger vehicles(bus, truck etc.) and is impossible to measure in the 8 lanes of highway. In this paper, installed the detection area include with all lanes, traffic informations are collected using tracking algorithm with passing vehicles individually in this detection area, thus possible to detect all of 8 lanes. The experiment have been conducted two different real road scenes for 20 minutes. For the experiments, the images are provided with CCTV camera which was installed at Kiheung Interchange upstream of Kyongbu highway, and video recording images at Chungkye Tunnel. For image processing, images captured by frame-grabber board 30 frames per second, $640{\times}480$ pixels resolution and 256 gray-levels to reduce the total amount of data to be interpreted.

  • PDF

Development of Two-Lane Car-Following Model to Generate More Realistic Headway Behavior (보다 현실적인 차두시간 행태 구현을 위한 2차로 차량추종모형 개발)

  • Yoon, Byoung Jo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.5
    • /
    • pp.1999-2007
    • /
    • 2013
  • The key characteristics of two-lane-and-two-way traffic flow are platoon and overtaking caused by low-speed vehicle such as truck. In order to develop two-way traffic flow model comprised of CF(car-following) and overtaking model, it is essential to develop a car-following model which is suitable to two-way traffic flow. Short distance between vehicles is caused when a high-speed vehicle tailgates and overtakes foregoing low-speed vehicle on two-way road system. And a vehicle following low-speed vehicle decides to overtake the front low-speed vehicle using suitable space within the headway distribution of opposite traffic flow. For this reason, a two-way CF model should describes not only running within short gap but also headway distribution. Additionally considering domestic two-way-road size, there is a on-going need for large-network simulation, but there are few studies for two-way CF model. In this paper, a two-way CA model is developed, which explains two-way CF behavior more realistic and can be applied for large road network. The experimental results show that the developed model mimics stop-and-go phenomenon, one of features of congested traffic flow, and efficiently generates the distribution of headway. When the CF model is integrated with overtaking model, it is, therefore, expected that two-way traffic flow can be explained more realistically than before.

The Selection of Optimal Probability Distribution and Estimation for Design Hourly Factor in National Highway Roads (일반국도 설계시간계수의 적정 확률분포 선정 및 추정)

  • Jo, Jun-Han;Han, Jong-Hyeon;Kim, Seong-Ho;Lee, Byeong-Saeng
    • Journal of Korean Society of Transportation
    • /
    • v.24 no.6 s.92
    • /
    • pp.33-43
    • /
    • 2006
  • This research is to the selection of optimal probability distribution as well as the estimation for design hourly factor in consideration of traffic characteristic, such as road function, lane number and AADT. To accomplish the objectives, we are applied to various probability distribution using traffic data that observed at permanent traffic count points in 2005. The parameters or the selected 14 probability distribution were estimated based on the method of maximum likelihood and the validity condition of the estimated parameter The goodness-of-fit test, such as chi-square test. was performed as well as the estimation of design hourly factor. As a result, An appropriate distributions of each case were selected : Pearson V for two lane of rural roads, LogLogistic for the four lane of rural roads, LogLogistic for the urban roads, Extreme value for recreation roads. And optimal K factor are as following : $0.1{\sim}0.2 $ for two lane of rural roads, $0.09{\sim}0.14$ for the four lane of rural roads. $0.07{\sim}0.13$ for the urban roads, $0.1{\sim}0.2$ for recreation roads.

Bus-only Lane and Traveling Vehicle's License Plate Number Recognition for Realizing V2I in C-ITS Environments (C-ITS 환경에서 V2I 실현을 위한 버스 전용 차선 및 주행 차량 번호판 인식)

  • Im, Changjae;Kim, Daewon
    • Journal of the Institute of Electronics and Information Engineers
    • /
    • v.52 no.11
    • /
    • pp.87-104
    • /
    • 2015
  • Currently the IoT (Internet of Things) environments and related technologies are being developed rapidly through the networks for connecting many intelligent objects. The IoT is providing artificial intelligent services combined with context recognition based knowledge and communication methods between human and objects and objects to objects. With the help of IoT technology, many research works are being developed using the C-ITS (Cooperative Intelligent Transport System) which uses road infrastructure and traveling vehicles as traffic control infrastructures and resources for improving and increasing driver's convenience and safety through two way communication such as bus-only lane and license plate recognition and road accidents, works ahead reports, which are eventually for advancing traffic effectiveness. In this paper, a system for deciding whether the traveling vehicle is possible or not to drive on bus-only lane in highway is researched using the lane and number plate recognition on the road in C-ITS traffic infrastructure environments. The number plates of vehicles on the straight ahead and sides are identified after the location of bus-only lane is discovered through the lane recognition method. Research results and experimental outcomes are presented which are supposed to be used by traffic management infrastructure and controlling system in future.

Roundabout Signal Metering Operation Methods by Considering Approach Lane's Degree of Saturation (접근로별 포화도를 고려한 Roundabout Signal Metering 운영방법에 관한 연구)

  • Ahn, Woo-Young;Lee, So-Young
    • International Journal of Highway Engineering
    • /
    • v.15 no.5
    • /
    • pp.217-226
    • /
    • 2013
  • PURPOSES : Under the capacity conditions with balanced approach flows, roundabouts give less delay than existing signalized intersections; however, flows over 450 vehicles/hour/lane with unbalanced approach flow conditions, roundabouts efficiency drops due to the short time difference between the critical gap and the follow-up headway. The purpose of this study is developing a roundabout Signal Metering operation method by considering approach lanes degree of saturation. METHODS : A four-way-approach with one-lane roundabout is selected to compare the Signal Metering performance for the case of 16 different unbalanced flow conditions. Based on these traffic conditions, the performance is evaluated for 64 different cases of Signal Metering combinations by using SIDRA software. A degree of saturation(V/C ratio) sum for two adjoined approaches is used for the performance index of choosing Metered Approach and Controlling Approach. RESULTS : When the V/C ratio sum is 0.29~0.81 and Metered Approach flow is less than Controlling Approach flow, the average delay saving per vehicle is about 7 seconds; however, after this rage the delay saving decreases gradually until the V/C ratio sum reaches around 1.0. The range of V/C ratio sum 0.93~1.09 provides average delay saving per vehicle about 3 seconds. In case of V/C ratio sum is grater than 1.0 and the flows of Metered Approach is grater than Controlling Approach, the average delay per vehicle increases 3~11 times respectively. CONCLUSIONS : As expected, the Signal Metering provides substantial improvements in delay saving for the case of V/C ratio sum is 0.3~1.0 under the traffic flow conditions of Metered Approach is less than Controlling Approach.

A Study of Traffic Noise Characteristics on the National Highways (일반국도의 교통소음특성에 관한 연구)

  • Son, Hyeon Jang;An, Deok-Soon;Baek, Cheolmin;Kwon, Soo-Ahn;Lee, Jaejun
    • International Journal of Highway Engineering
    • /
    • v.15 no.2
    • /
    • pp.11-18
    • /
    • 2013
  • PURPOSES : This study presents the noise level and frequency characteristics investigated in the national highways with the consideration of various measuring conditions and/or methods. METHODS : The noise levels on the asphalt concrete pavement(ACP) and the jointed plain concrete pavement(JPCP) of the national highway were measured and analysed with respect to three variables, i.e., pavement type, surface condition, and measurement distance. The PASS-By method is utilized for the noise measurement and then using CPB spectrum analysis method with 1/3 octave bandwidth, the noise levels and frequency characteristics were calculated for two-second periods before and after the peak noise. RESULTS : Depending on the pavement type, the noise level was changed as the average noise levels are 73.3dB(A) and 78.3dB(A) for ACP and JPCP, respectively. With respect to the effect of surface condition, the average noise levels for crack H(high), M(medium), and L (low) sections are 77.4dB(A), 77.4dB(A), and 78.1dB(A), respectively. Regarding the measurement distance, 1.2meter difference in measuring location reduces 1.6dB(A) of noise level; the average noise levels at 5.3m and 7.5m from the centerline of outer lane are 72.8dB(A) and 71.2dB(A), respectively. It should be noted that the noise levels are slightly different as a function of vehicle speed and type. However, the overall trends for each case was similar. It was found that the domain frequency bands for ACP and JPCP were 400Hz~2000Hz and 500Hz~2000Hz, respectively. CONCLUSIONS : Based on the analysis with the measured noise date from national highway, it was concluded that the noise level and frequency band vary depending on the various conditions. It was also found that some variables significantly affect the noise level while others do not. With further systematic investigation, the comprehensive noise characteristics on the national highway can be achieved. Using such database, it is possible to develop the fundamental noise reduction technology.

A Study on Evaluation of Consistency Using 3-Dimensional Sight Distance (3차원시거를 이용한 도로일관성 평가에 관한 연구)

  • Park, Je-Jin;Oh, Young-Wook;Kang, Jeong-Gyu;Ha, Tae-Jun
    • Journal of Korean Society of Transportation
    • /
    • v.26 no.3
    • /
    • pp.187-197
    • /
    • 2008
  • While driving a highway, A driver gets lots of information through geometrical structure, traffic situation, signs on the road. He gets most of the information by visual sense. Acceleration or deceleration and driving direction depend on sight distance. Therefore, it's essential to secure a driver's sight distance for a safe drive. However, design guides of geometrical structure and sight distance suggest respective standards of horizontal and vertical alignment. They do not indicate quantitative standard of combined alignment. Currently, element separated on a two-dimensional projected plane are available, but they do not guarantee safe and pleasant design. I will use the existent model analysing three-dimensional sight distance through mathematical calculation and sort a variety of geometrical structure element and type. In these researches, we will look at how much three-dimensional sight distance is overestimated or underestimated compared to two-dimensional. I will develop a program which predicts traffic velocity on the curvature of two-lane provincial road. stopped sight distance and three-dimensional sight distance will be compared at a predicted drive velocity. I will suggest the way to evaluate road consistency.

Development of Digital Image Acquisition System for the Road Safety Survey and Analysis Vehicle (도로안전성 조사분석차량을 위한 영상취득시스템 개발)

  • Jeong, Dong-Hoon;Yoon, Chun-Joo;Sung, Jung-Gon
    • International Journal of Highway Engineering
    • /
    • v.7 no.4 s.26
    • /
    • pp.163-171
    • /
    • 2005
  • Current roads were designed and constructed based on the design criteria and thus those were overly simplified drivers' needs. The road criteria do not suggest the desirable range of the design values but suggest the minimum requirements for the road design. Therefore, a completed road design based on the design criteria does not always guarantee the best design in terms of safety and it sometimes violates drivers' expectation. Therefore, the ROSSAV(ROad Safety Survey and Analysis Vehicle) is being developed by the KICT to evaluate road safety and increase driving safety. In this paper, the image capture system was described in detail. The image capture system is consisted of two front view cameras, two side down-looking cameras and a synchronization device. Two front view cameras were used to take a picture of road and road facilities at the driver's viewpoint. Also, two side down-looking cameras were used to capture road surface image to extract lane markings. A synchronization device were used to generate image capturing signal at the fixed distance spacing huck as every 10m. The front view images could be used to calculate and measure highway geometry such as shoulder width because every image is saved with it's locational information. And also the side down looking images could be used to extract median lane mark which representing road alignement efficiently.

  • PDF

A Study on Effectiveness and Warrant Analysis for Two-Way Left-Turn Lanes (양방향 좌회전차로(TWLTLs) 적용효과 분석 및 설치준거 연구)

  • Bae, Gwang-Su;Sim, Gwan-Bo;Song, Chang-Yong
    • Journal of Korean Society of Transportation
    • /
    • v.25 no.6
    • /
    • pp.65-77
    • /
    • 2007
  • A two-way left-turn lane is a continuous center left-turn lane that could be used as a deceleration and refuge area for both directions of left-turning vehicles. TWLTL's have been used effectively for access management treatment when applied to a highway that has wide-spread left turning traffic demand and a high-density of side streets. In this study, an effective analysis was carried out using a computer-based simulation tool, VISSIM, in order to evaluate performance and safety effects of TWLTLs and develop a warrant. In conclusion, the results indicated that there was a remarkable decrease of through and left-turning vehicle travel time delay on the main road and improvement of traffic safety.