• Title/Summary/Keyword: Turnkey project

Search Result 34, Processing Time 0.018 seconds

Development of Start·Stop Control System at Water Turbine Generator for Tidal Power Plant (조력발전소를 위한 수차발전기의 기동·정지 제어시스템 개발)

  • Cho, Byong-Og;Park, Chul-Won
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.28 no.6
    • /
    • pp.106-112
    • /
    • 2014
  • Recently, tidal power generation has gained much attention. South Korea's tidal power generation systems were imported from abroad by turnkey type and have being operated. Therefore, for efficient operation and technological independence of a tidal power system, development of core technology is required. This paper deals with the start stop control system of water turbine generator in the tidal power plant, as one of our development project results. Using the SCADA system, the status and operations of water turbine generator in the tidal power plant, as well as simulation for calculation of maximum power were carried out. A small model type of start stop control device was also developed. In addition, the control system in Sihwa tidal power plant was modeled, and the results obtained by the dynamic simulation were given in graphics by 2D simulator.

Landscape Design of Gamcheon Wholesale Fish Market (감천항 수산물 도매시장 조경설계)

  • 권영휴;민권식;황용득
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.30 no.2
    • /
    • pp.70-78
    • /
    • 2002
  • The landscape disign of Gamcheon wholesale fish Market was designed around a turnkey base to promote the economy of Busan Metropolitan City, to establish a fishery marketing center and to modernize existing facilities. The objectives of the project were to promote the mood of an old market, while preserving its functions and efficiency as a market, to design outdoor spaces with natural resources and amenities in balance, and to create attractive tourist spots in connection with the wide area development plan. The project was oriented, fast, to enhance the functions of the market. For this purpose, a multi-dimensional space layout was designed in consideration of functions as a wholesale market. The safety of pedestrians was secured by separating lathes for vehicles and for pedestrians. Tree planting with various functions such as sheltering, wind breaking and guiding was planned. Secondly, nature-friendly and human-friendly landscaping design was attempted. For this, the beautiful natural resources of Amnam Park were utilized, and green spaces such as green bridges linking buildings in the wholesale market, and rooftop gardens were to be arranged. In addition, environment-friendly facilities such as roads paved with natural materials(i.e. gravel, shells) and program parking lots were to be planned. Thirdly, landscape design was considered to create attractive tourist spots. For example, a fish farm was created as a theme street for pedestrians and various water-friendly spaces such as pedestrian ramps, observatories and seaside streets were to be secured. The main contents are as follows. First, a green bridge to Ahnnam Park was introduced for a tour source and flower garden, an event plan and viewing deck open to the sea were planned on the bridge's axis. Secondly, for the effective land use plan concerning open space and convenience to visitors, a promenade was planned, which is connected with the theme plaza and small plazas by environmental sculptures in front of the market hall and at the gate. As well, an observatory and a roof garden help create three dimensional multi leveled space, with a good view of the natural landscape of the sea, sky and park Thirdly, landscape materials, such as trees and those for facilities, strengthened for protection against the seawind and salt damage were selected. The commercial market area was intended to be transformed a traditional functional area of efficiency and economy into an attractive marine leisure area where both tourists and neighbors can make use of it.

A Study on the Problem and Improvement of Screening System of Low Price Subcontracting by Analyzing a Standard of Judgement Criteria (원도급자 측면에서의 저가하도급 판정기준의 문제점과 개선방안)

  • Kim, Soon-Young;Han, Choong-Hee;Baek, Tae-Ryong;Kim, Kyoon-Tai;Lee, Jun-Bok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.6
    • /
    • pp.107-116
    • /
    • 2009
  • As the Fundamentals of Construction Business Act was revised in December 2004 and its implementing ordinances and enforcement regulations were adjusted in June 2005, the screening system of low price subcontracting has been an obligation to the public owners, having brought about arguments for and against since it enacted in 1983. The statutes for low price subcontracting have been reinforced from this year; for example, it underlines to submit to a project and builds an information network of subcontracting works. The system's original intention was that prevents shoddy and fraudulent constructions caused by low price subcontracting and precludes disturbances of fair trade by screening that whether it satisfies the conditions or not in advance. But, the criterion for the existing low price subcontracting has several issues having held up a true mirror to the real situation. It is arguable to discharge an important task with the primary purpose. This dissertation have researched the problem with a deposit of subcontract and the low price subcontracting basic rate are being used by the criteria for deciding whether it is a low price subcontracting or not, so showing the plan of reformation based on the findings, it wishes to contribute toward making the most of the system's essential intent.

Analysis of the Influence of Design Score and Price Score for Design Build Bidding (설계시공일괄입찰에서 설계점수와 가격점수의 영향력 분석)

  • Lee, Jinhak;Woo, Sungkwon;Lee, Siwook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.5
    • /
    • pp.44-51
    • /
    • 2023
  • Selecting appropriate bidding system in construction projects considering the characteristic of project can be a make-or-break element, so the understanding for bidding system of public construction projects is ever more important from the perspective of both the owner and the contractor. The design-build bidding is commonly referred to as turnkey in Korea, and is a bidding method that is often applied to large public construction projects because it allows new technologies to be applied to the design and facilitates risk management for the owner. In this bidding method, there are only two factors (design score and price score) that affect the selection of the winning bidder, so it is important to understand the influence of each factor, but there is little research on the subject. This study aims to provide a basis for establishing bidding strategies for understanding the influence between design score and price score by analyzing various design-build bidding data of public construction projects. The results of the study show that design score is the factor that has more influence on the ranking of bidders in all three weighted evaluation methods: design-emphasized, price-emphasized, and equalized evaluation. In addition, we found that the correlation between design and price scores was not significant due to the unique bid evaluation structure in Korea.